Attachment 6 - UFGS 02 82 00 (Asbestos Remediation).pdf

PDF 210 KB Posted

Attached to
Asbestos Abatement B806, RVKQ 26-0008
Solicitation number
FA6670-26-Q-0008
Issued by

About this file

This document is a Unified Facilities Guide Specification (UFGS) Section 02 82 00 for Asbestos Remediation issued by USACE, NAVFAC, AFCEC, and NASA in November 2018. The specification establishes comprehensive requirements for safety procedures, demolition, removal, encapsulation, and disposal of asbestos-containing materials (ACM) on federal construction projects. It applies to all classes of asbestos work (Class I, II, and III) and includes detailed definitions, product specifications, and execution procedures aligned with 29 CFR 1926.1101 (OSHA), 40 CFR 61-SUBPART M (EPA NESHAP), and related federal regulations.

Key requirements include mandatory use of competent persons, private qualified persons (PQP), and designated government consultants for oversight and air monitoring. The specification mandates negative pressure enclosures for Class I work, glovebag systems where enclosures are infeasible, and specific wet removal procedures for all asbestos disturbance activities. Required submittals include asbestos hazard abatement plans, respirator protection programs, medical certifications, employee training certificates, air sampling results using NIOSH Method 7400 (or EPA TEM methods for certain applications), pressure differential recordings, testing laboratory certifications, landfill and transporter approvals, and final clearance sampling demonstrating fiber concentrations below 0.01 f/cc or state-approved thresholds. The specification mandates HEPA-filtered equipment, proper decontamination procedures with separate clean and dirty areas, disposal of waste in EPA-approved landfills, and comprehensive documentation of all remediation activities. Products specified include removal and penetrating encapsulants meeting ASTM performance standards, 6-mil polyethylene sheeting, disposal containers, wetting agents, respirators approved under 42 CFR 84, and specialized decontamination systems. The specification serves as a template for federal facility modifications and does not establish firm pricing, award dates, or procurement set-asides.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USACE / NAVFAC / AFCEC / NASA UFGS- 02 82 00 ( November 2018) Change 1 - 11/ 19 Pr epar i ng Act i v i t y: NAVFAC Super sedi ng UFGS 02 82 13. 00 10 ( Febr uar y 2010) UFGS- 02 82 16. 00 20 ( August 2011)

UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS

Ref er ences ar e i n agr eement wi t h UMRL dat ed Jul y 2020

SECTION TABLE OF CONTENTS

DIVISION 02 - EXISTING CONDITIONS

SECTION 02 82 00

ASBESTOS REMEDIATION

11/18

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.2.1 ACM

1.2.2 Amended Water

1.2.3 Area Sampling

1.2.4 Asbestos

1.2.5 Asbestos Control Area

1.2.6 Asbestos Fibers

1.2.7 Asbestos Permissible Exposure Limit

1.2.8 Authorized Person

1.2.9 Background

1.2.10 Competent Person (CP)

1.2.11 Contractor

1.2.12 Disposal Bag

1.2.13 Disturbance

1.2.14 Encapsulation

1.2.15 Encapsulants

1.2.16 Friable Asbestos Material

1.2.17 Glovebag Technique

1.2.18 Government Consultant (GC)

1.2.19 HEPA Filter Equipment

1.2.20 Model Accreditation Plan (MAP)

1.2.21 Negative Pressure Enclosure (NPE)

1.2.22 NESHAP

1.2.23 Nonfriable Asbestos Material

1.2.24 Permissible Exposure Limits (PELs)

1.2.24.1 PEL-Time Weighted Average(TWA)

1.2.24.2 PEL-Excursion Limit

1.2.25 Personal Sampling

1.2.26 Private Qualified Person (PQP)

1.2.27 Qualified Person (QP)

1.2.28 TEM

SECTION 02 82 00 Page 1

1.2.29 Time Weighted Average (TWA)

1.2.30 Transite

1.2.31 Wetting Agent

1.2.32 Worker

1.3 REQUIREMENTS

1.3.1 Description of Work

1.3.1.1 Wallboard/Joint Compound

1.3.2 Unexpected Discovery of Asbestos

1.3.3 Medical Requirements

1.3.3.1 Medical Examinations

1.3.3.2 Medical Records

1.3.4 Employee Training

1.3.5 Permits[, Licenses,] and Notifications

1.3.6 Environment, Safety and Health Compliance

1.3.7 Respiratory Protection Program

1.3.7.1 Respirator Program Records

1.3.7.2 Respirator Fit Testing

1.3.7.3 Respirator Selection and Use Requirements

1.3.8 Asbestos Hazard Control Supervisor

1.3.9 Hazard Communication

1.3.10 Asbestos Hazard Abatement Plan

1.3.11 Testing Laboratory

1.3.12 Landfill Approval

1.3.13 Transporter Certification

1.3.14 Medical Certification

1.4 SUBMITTALS

1.5 QUALITY ASSURANCE

1.5.1 Private Qualified Person Documentation

1.5.2 Designated Competent Person Documentation

1.5.3 Worker's License

1.5.4 Contractor's License

1.5.5 Air Sampling Results

1.5.6 Pressure Differential Recordings for Local Exhaust System

1.5.7 Protective Clothing Decontamination Quality Control Records

1.5.8 Protective Clothing Decontamination Facility Notification

1.5.9 Federal, State or Local Citations on Previous Projects

1.5.10 Preconstruction Conference

1.6 SECURITY

1.7 EQUIPMENT

1.7.1 Rental Equipment

PART 2 PRODUCTS

2.1 ENCAPSULANTS

2.1.1 Removal Encapsulants

2.1.2 Bridging Encapsulant

2.1.3 Penetrating Encapsulant

2.1.4 Lock-down Encapsulant

2.2 ENCASEMENT PRODUCTS

2.3 DUCT TAPE

2.4 DISPOSAL CONTAINERS

2.5 SHEET PLASTIC

2.5.1 Flame Resistant

2.5.2 Reinforced

2.6 MASTIC REMOVING SOLVENT

2.7 LEAK-TIGHT WRAPPING

2.8 VIEWING INSPECTION WINDOW

2.9 WETTING AGENTS

SECTION 02 82 00 Page 2

PART 3 EXECUTION

3.1 EQUIPMENT

3.1.1 Air Monitoring Equipment

3.1.2 Respirators

3.1.2.1 Respirators for Handling Asbestos

3.1.3 Exterior Whole Body Protection

3.1.3.1 Outer Protective Clothing

3.1.3.2 Work Clothing

3.1.3.3 Personal Decontamination Unit

3.1.3.4 Decontamination of Reusable Outer Protective Clothing

3.1.3.5 Eye Protection

3.1.4 Regulated Areas

3.1.5 Load-out Unit

3.1.6 Warning Signs and Labels

3.1.6.1 Warning Sign

3.1.6.2 Warning Labels

3.1.7 Local Exhaust System

3.1.8 Tools

3.1.9 Rental Equipment

3.1.10 Glovebags

3.1.11 Single Stage Decontamination Area

3.1.12 Decontamination Area Exit Procedures

3.2 WORK PROCEDURE

3.2.1 Building Ventilation System and Critical Barriers

3.2.2 Protection of Existing Work to Remain

3.2.3 Furnishings

3.2.4 Precleaning

3.2.5 Asbestos Control Area Requirements

3.2.5.1 Negative Pressure Enclosure

3.2.5.2 Glovebag

3.2.5.3 Regulated Area for Class II Removal

3.2.6 Removal Procedures

3.2.6.1 Sealing Contaminated Items Designated for Disposal

3.2.6.2 Exposed Pipe Insulation Edges

3.2.7 Methods of Compliance

3.2.7.1 Mandated Practices

3.2.7.2 Control Methods

3.2.7.3 Unacceptable Practices

3.2.8 Class I Work Procedures

3.2.9 Specific Control Methods for Class I Work

3.2.9.1 Negative Pressure Enclosure (NPE) System

3.2.9.2 Glovebag Systems

3.2.9.3 Mini-Enclosure

3.2.9.4 Wrap and Cut Operation

3.2.9.5 Class I Removal Method

3.2.10 Class II Work Procedures

3.2.11 Specific Control Methods for Class II Work

3.2.11.1 [Vinyl and Asphaltic Flooring Materials] [Carpet and

Mastic]

3.2.11.2 Sealants and Mastic

3.2.11.3 Suspect Fire Doors

3.2.11.4 Roofing Materials

3.2.11.5 Cementitious Siding and Shingles or Transite Panels

3.2.11.6 Gaskets

3.2.12 Encapsulation Procedures

3.2.12.1 Preparation of Test Patches

3.2.12.2 Field Testing

3.2.12.3 Large-Scale Application

SECTION 02 82 00 Page 3

3.2.13 Abatement of Asbestos Contaminated Soil

3.2.14 Air Sampling

3.2.14.1 Sampling Prior to Asbestos Work

3.2.14.2 Sampling During Asbestos Work

3.2.14.3 Final Clearance Requirements, NIOSH PCM Method

3.2.14.4 Final Clearance Requirements, EPA TEM Method

3.2.14.5 Sampling After Final Clean-Up (Clearance Sampling)

3.2.14.6 Air Clearance Failure

3.2.15 Lock-Down

3.2.16 Site Inspection

3.3 CLEAN-UP AND DISPOSAL

3.3.1 Housekeeping

3.3.2 Title to Materials

3.3.3 Disposal of Asbestos

3.3.3.1 Procedure for Disposal

3.3.3.2 Asbestos Disposal Quantity Report

-- End of Section Table of Contents --

SECTION 02 82 00 Page 4

USACE / NAVFAC / AFCEC / NASA UFGS- 02 82 00 ( November 2018) Change 1 - 11/ 19 Pr epar i ng Act i v i t y: NAVFAC Super sedi ng UFGS 02 82 13. 00 10 ( Febr uar y 2010) UFGS- 02 82 16. 00 20 ( August 2011)

UNI FI ED FACI LI TI ES GUI DE SPECI FI CATI ONS

Ref er ences ar e i n agr eement wi t h UMRL dat ed Jul y 2020

SECTION 02 82 00

ASBESTOS REMEDIATION

11/18

NOTE: Thi s gui de speci f i cat i on cover s t he r equi r ement s f or saf et y pr ocedur es and r equi r ement s f or t he demol i t i on, r emoval , encapsul at i on, and di sposal of asbest os cont ai ni ng mat er i al s ( ACM) .

Thi s speci f i cat i on i s used i n conj unct i on wi t h Section 01 35 26 GOVERNMENT SAFETY REQUI REMENTS.

Adher e t o UFC 1-300-02 Uni f i ed Faci l i t i es Gui de Speci f i cat i ons ( UFGS) For mat St andar d when edi t i ng t hi s gui de speci f i cat i on or pr epar i ng new pr oj ect speci f i cat i on sect i ons. Edi t t hi s gui de speci f i cat i on f or pr oj ect speci f i c r equi r ement s by addi ng, del et i ng, or r evi s i ng t ext . For br acket ed i t ems, choose appl i cabl e i t em( s) or i nser t appr opr i at e i nf or mat i on.

Remove i nf or mat i on and r equi r ement s not r equi r ed i n r espect i ve pr oj ect , whet her or not br acket s ar e present.

Comment s, suggest i ons and r ecommended changes f or t hi s gui de speci f i cat i on ar e wel come and shoul d be submi t t ed as a Criteria Change Request (CCR) .

NOTE: Feder al r egul at i ons r equi r e EPA model accr edi t at i on pl an t r ai ni ng t o edi t t hi s document .

Fur t her mor e, asbest os abat ement desi gner s must be accr edi t ed and l i censed t o desi gn asbest os wor k i n t he l ocat i on of t he const r uct i on.

Nonf r i abl e asbest os cont ai ni ng mat er i al s do not al ways r equi r e speci al handl i ng. However , dur i ng demol i t i on and r emoval of t hi s mat er i al dust and ai r bor ne asbest os f i ber s wi l l somet i mes be r el eased. I f t he pr oj ect cont ai ns nonf r i abl e asbest os whi ch may r el ease f i ber s when demol i shed and r emoved, t he nonf r i abl e asbest os must be r emoved

SECTION 02 82 00 Page 5 i n t he same way as f r i abl e asbest os. Fr i abl e ACM must al ways be r emoved pr i or t o any bui l di ng demolition.

OSHA r egul at i ons addr ess wor ker pr ot ect i on, NESHAPS ( EPA) r egul at i ons addr ess di sposal r equi r ement s, and t hey have di f f er ent def i ni t i ons as t o what const i t ut es ACM i n wal l boar d/ j oi nt compound syst ems. Ther ef or e, wher e wal l boar d/ j oi nt compound ar e suspect ed t o cont ai n ACM, anal yze bot h di scr et e sampl es ( separ at e sampl es f r om wal l boar d and j oi nt compound) t o addr ess wor ker pr ot ect i on and composi t e sampl es ( wal l boar d syst em as a whol e) t o addr ess di sposal r equi r ement s. I t i s not unusual f or t he wal l boar d i t sel f and t he wal l boar d syst em ( t aken as a whol e) t o cont ai n l ess t han 1 per cent asbest os, but t he di scr et e j oi nt compound sampl es t o cont ai n gr eat er t han 1 per cent asbest os. Pr obl ems can ar i se i f t hese mat er i al s ar e not pr oper l y cat egor i zed i n t he desi gn. Al so, i f t he mat er i al i s appl i ed as an " add on" or " ski m coat " , NESHAPS consi der s t he l ayer s separ at e and composi t e sampl i ng i s not appropriate.

Asbest os oper at i ons do not al ways i ndi cat e negat i ve pr essur e encl osur e t ype asbest os cont r ol wi t h al l of i t s at t endant r equi r ement s. The l ocat i on of t he ar ea, t ype of mat er i al , and i ni t i al as wel l as ot her exposur e assessment s f or abat ement wor ker s and t he envi r onment must be r evi ewed and a j udgment made by t he desi gner as t o t he pr eci se asbest os cont r ol t echni ques descr i bed her ei n t hat may be saf el y and l egal l y used.

I t i s t he pol i cy of t he Navy t o el i mi nat e t he use of mat er i al s cont ai ni ng asbest os wher ever possi bl e.

Ther ef or e, t he desi gner must not use asbest os cont ai ni ng mat er i al s wher ever a subst i t ut e, sui t abl e t o t he Navy, exi st s.

The l i mi t s and condi t i ons of asbest os hazar d abat ement ef f or t s must be i ndi cat ed on t he dr awi ngs or i n t he speci f i cat i on i n suf f i c i ent det ai l f or t he Cont r act or t o submi t an accur at e bi d. Por t i ons of t he bui l di ng wher e asbest os wor k wi l l t ake pl ace must be unoccupi ed dur i ng t he r emoval oper at i on. I t i s hi ghl y r ecommended t hat t he ent i r e bui l di ng be unoccupi ed dur i ng asbest os hazar d abat ement oper at i ons. I f por t i ons of t he bui l di ng wher e asbest os hazar d abat ement i s not t aki ng pl ace must r emai n occupi ed, addi t i onal r equi r ement s must be added f or pr ovi di ng t empor ar y heat i ng/ cool i ng and ot her ut i l i t i es t o t he occupi ed por t i ons of t he bui l di ng. The bui l di ng heat i ng/ cool i ng syst em f or exampl e cannot be oper at ed i n t he asbest os cont r ol ar ea and due t o wet r emoval pr ocedur es, el ect r i cal ser vi ce t o t he asbest os cont r ol ar ea may need t o be shut of f and r esuppl i ed t hr ough a gr ound f aul t c i r cui t i nt er r upt er . I n addi t i on, t he r ooms wi t h

SECTION 02 82 00 Page 6 openi ngs i nt o t he r oom under goi ng asbest os abat ement must be empt y wi t h cr i t i cal bar r i er s i nst al l ed t o pr ovi de a buf f er zone.

NOTE: Pr ovi de t he f ol l owi ng i nf or mat i on on t he pr oj ect dr awi ngs:

1. Cl ear l y show l ocat i on, ext ent , condi t i on and f or m of asbest os mat er i al s t o be cont r ol l ed or i n cont act wi t h ot her non- ACM r emoval s or new wor k.

NOTE: The wor k may i nvol ve a hi st or i c pr oper t y.

The desi gner must coor di nat e r evi ew of t he pr oposed wor k wi t h t he appr opr i at e cul t ur al r esour ces manager ( CRM) and cul t ur al r esour ce l aws and r egul at i ons, as par t of t he envi r onment al r evi ew and per mi t t i ng pr ocess. Consul t at i on wi t h st akehol der s, i ncl udi ng t he st at e hi st or i c pr eser vat i on of f i ce, may be r equi r ed, and wor k i nvol v i ng hi st or i c pr oper t i es wi l l l i kel y be r equi r ed t o conf i r m t o t he Secr et ar y of t he I nt er i or ' s St andar ds f or t he Tr eat ment of Hi st or i c Pr oper t i es ( usual l y at t he REHABI LI TATI ON l evel ) . See https://www.nps.gov/tps/standards/four-treatments/treatment-rehabilitation.htm

PART 1 GENERAL

1.1 REFERENCES

NOTE: Thi s par agr aph i s used t o l i s t t he publ i cat i ons c i t ed i n t he t ext of t he gui de speci f i cat i on. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by basi c desi gnat i on onl y and l i s t ed i n t hi s par agr aph by or gani zat i on, desi gnat i on, dat e, and t i t l e.

Use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e when you add a Ref er ence I dent i f i er ( RI D) out si de of t he Sect i on' s Ref er ence Ar t i c l e t o aut omat i cal l y pl ace t he r ef er ence i n t he Ref er ence Ar t i c l e. Al so use t he Ref er ence Wi zar d' s Check Ref er ence f eat ur e t o updat e t he i ssue dat es.

Ref er ences not used i n t he t ext wi l l aut omat i cal l y be del et ed f r om t hi s sect i on of t he pr oj ect speci f i cat i on when you choose t o r econci l e r ef er ences i n t he publ i sh pr i nt pr ocess.

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

SECTION 02 82 00 Page 7

AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)

ASSP Z9.2 (2018) Fundamentals Governing the Design and Operation of Local Exhaust Ventilation Systems

ASTM INTERNATIONAL (ASTM)

ASTM C732 (2006; R 2012) Aging Effects of Artificial Weathering on Latex Sealants

ASTM D522/D522M (2017) Mandrel Bend Test of Attached Organic Coatings

ASTM D2794 (1993; R 2019) Standard Test Method for Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)

ASTM D4397 (2016) Standard Specification for Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications

ASTM E84 (2020) Standard Test Method for Surface Burning Characteristics of Building Materials

ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials

ASTM E119 (2019) Standard Test Methods for Fire Tests of Building Construction and Materials

ASTM E736/E736M (2017) Standard Test Method for Cohesion/Adhesion of Sprayed Fire-Resistive Materials Applied to Structural Members

ASTM E1368 (2014) Visual Inspection of Asbestos Abatement Projects

ASTM E1494 (2012) Encapsulants for Spray- or Trowel-Applied Friable Asbestos-Containing Building Materials

COMPRESSED GAS ASSOCIATION (CGA)

CGA G-7 (2014) Compressed Air for Human Respiration; 6th Edition

INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)

ANSI/ISEA Z87.1 (2020) Occupational and Educational Personal Eye and Face Protection Devices

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 701 (2019) Standard Methods of Fire Tests for Flame Propagation of Textiles and Films

SECTION 02 82 00 Page 8

NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)

NIOSH NMAM (2016; 5th Ed) NIOSH Manual of Analytical Methods

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

EPA 340/1-90/018 (1990) Asbestos/NESHAP Regulated Asbestos Containing Materials Guidance

EPA 560/5-85-024 (1985) Guidance for Controlling Asbestos-Containing Materials in Buildings (Purple Book)

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.147 The Control of Hazardous Energy (Lock Out/Tag Out)

29 CFR 1926.51 Sanitation

29 CFR 1926.59 Hazard Communication

29 CFR 1926.103 Respiratory Protection

29 CFR 1926.200 Accident Prevention Signs and Tags

29 CFR 1926.1101 Asbestos

40 CFR 61-SUBPART A General Provisions

40 CFR 61-SUBPART M National Emission Standard for Asbestos

40 CFR 763 Asbestos

42 CFR 84 Approval of Respiratory Protective Devices

49 CFR 107 Hazardous Materials Program Procedures

49 CFR 171 General Information, Regulations, and Definitions

49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements

49 CFR 173 Shippers - General Requirements for Shipments and Packagings

U.S. NAVAL FACILITIES ENGINEERING COMMAND (NAVFAC)

NAVFAC P-502 (2017) Asbestos Program Management

SECTION 02 82 00 Page 9

ND OPNAVINST 5100.23 (2005; Rev G) Navy Occupational Safety and Health (NAVOSH) Program Manual

UNDERWRITERS LABORATORIES (UL)

UL 586 (2009; Reprint Dec 2017) UL Standard for Safety High-Efficiency Particulate, Air Filter Units

1.2 DEFINITIONS

1.2.1 ACM

Asbestos Containing Materials.

1.2.2 Amended Water

Water containing a wetting agent or surfactant with a maximum surface tension of 2.9 Pa 0.00042 psi .

1.2.3 Area Sampling

Sampling of asbestos fiber concentrations which approximates the concentrations of asbestos in the theoretical breathing zone but is not actually collected in the breathing zone of an employee.

1.2.4 Asbestos

The term asbestos includes chrysotile, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos, and actinolite asbestos and any of these minerals that has been chemically treated or altered. Materials are considered to contain asbestos if the asbestos content of the material is determined to be at least one percent.

1.2.5 Asbestos Control Area

That area where asbestos removal operations are performed which is isolated by physical boundaries which assist in the prevention of the uncontrolled release of asbestos dust, fibers, or debris.

1.2.6 Asbestos Fibers

Those fibers having an aspect ratio of at least 3:1 and longer than 5 micrometers as determined by National Institute for Occupational Safety and Health (NIOSH) Method 7400.

1.2.7 Asbestos Permissible Exposure Limit

0.1 fibers per cubic centimeter of air as an 8-hour time weighted average measured in the breathing zone as defined by 29 CFR 1926.1101 or other Federal legislation having legal jurisdiction for the protection of workers health.

1.2.8 Authorized Person

Any person authorized by the Contractor and required by work duties to be present in the regulated areas.

SECTION 02 82 00 Page 10

1.2.9 Background

The ambient airborne asbestos concentration in an uncontaminated area as measured prior to any asbestos hazard abatement efforts. Background concentrations for other (contaminated) areas are measured in similar but asbestos free locations.

1.2.10 Competent Person (CP)

NOTE: Check st at e r equi r ement s f or l i censi ng and edi t appr opr i at el y.

A person meeting the requirements for competent person as specified in 29 CFR 1926.1101 including a person capable of identifying existing asbestos hazards in the workplace and selecting the appropriate control strategy for asbestos exposure, who has the authority to take prompt corrective measures to eliminate them, and is specifically trained in a training course which meet the criteria of EPA's Model Accreditation Plan ( 40 CFR 763 ) for project designer or supervisor, or its equivalent.[ The competent person must have a current State of [_____] asbestos contractors or supervisors license.]

1.2.11 Contractor

The Contractor is that individual, or entity under contract to perform the herein listed work.

1.2.12 Disposal Bag

A 0.15 mm 6 mil thick, leak-tight plastic bag, pre-labeled in accordance with 29 CFR 1926.1101 , used for transporting asbestos waste from containment to disposal site.

1.2.13 Disturbance

Activities that disrupt the matrix of ACM, crumble or pulverize ACM, or generate visible debris from ACM. Disturbance includes cutting away small amounts of ACM, no greater than the amount which can be contained in one standard sized glovebag or waste bag, not larger than 1.5 m 60 inches in length and width in order to access a building component.

1.2.14 Encapsulation

The abatement of an asbestos hazard through the appropriate use of chemical encapsulants.

1.2.15 Encapsulants

Specific materials in various forms used to chemically or physically entrap asbestos fibers in various configurations to prevent these fibers from becoming airborne. There are four types of encapsulants as follows which must comply with performance requirements as specified herein.

a. Removal Encapsulant (can be used as a wetting agent)

b. Bridging Encapsulant (used to provide a tough, durable surface coating to asbestos containing material)

SECTION 02 82 00 Page 11

c. Penetrating Encapsulant (used to penetrate the asbestos containing material encapsulating all asbestos fibers and preventing fiber release due to routine mechanical damage)

d. Lock-Down Encapsulant (used to seal off or "lock-down" minute asbestos fibers left on surfaces from which asbestos containing material has been removed).

1.2.16 Friable Asbestos Material

A term defined in 40 CFR 61-SUBPART M and EPA 340/1-90/018 meaning any material which contains more than 1 percent asbestos, as determined using the method specified in 40 CFR 763 , Polarized Light Microscopy (PLM), that when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.

1.2.17 Glovebag Technique

NOTE: Ver i f y wi t h t he St at e r egul at i ons t hat gl ovebag r emoval i s an accept abl e t echni que.

Those asbestos removal and control techniques put forth in 29 CFR 1926.1101 .

1.2.18 Government Consultant (GC)

That qualified person employed directly by the Government to monitor, sample, inspect the work or in some other way advise the Contracting Officer. The GC is normally a private consultant, but can be an employee of the Government.

1.2.19 HEPA Filter Equipment

High efficiency particulate air (HEPA) filtered vacuum and exhaust ventilation equipment with a filter system capable of collecting and retaining asbestos fibers. Filters must retain 99.97 percent of particles

0.3 microns or larger as indicated in UL 586 .

1.2.20 Model Accreditation Plan (MAP)

USEPA training accreditation requirements for persons who work with asbestos as specified in 40 CFR 763 .

1.2.21 Negative Pressure Enclosure (NPE)

That engineering control technique described as a negative pressure enclosure in 29 CFR 1926.1101 .

1.2.22 NESHAP

National Emission Standards for Hazardous Air Pollutants. The USEPA NESHAP regulation for asbestos is at 40 CFR 61-SUBPART M .

1.2.23 Nonfriable Asbestos Material

Material that contains asbestos in which the fibers have been immobilized by a bonding agent, coating, binder, or other material so that the

SECTION 02 82 00 Page 12 asbestos is well bound and will not normally release asbestos fibers during any appropriate use, handling, storage or transportation. It is understood that asbestos fibers may be released under other conditions such as demolition, removal, or mishap.

1.2.24 Permissible Exposure Limits (PELs)

1.2.24.1 PEL-Time Weighted Average(TWA)

Concentration of asbestos not in excess of 0.1 fibers per cubic centimeter of air (f/cc) as an 8-hour time weighted average (TWA).

1.2.24.2 PEL-Excursion Limit

An airborne concentration of asbestos not in excess of 1.0 f/cc of air as averaged over a sampling period of 30 minutes.

1.2.25 Personal Sampling

Air sampling which is performed to determine asbestos fiber concentrations within the breathing zone of a specific employee, as performed in accordance with 29 CFR 1926.1101 .

1.2.26 Private Qualified Person (PQP)

That qualified person hired by the Contractor to perform the herein listed tasks.

1.2.27 Qualified Person (QP)

A Registered Architect, Professional Engineer, Certified Industrial Hygienist, consultant or other qualified person who has successfully completed training and is therefore accredited under a legitimate State Model Accreditation Plan as described in 40 CFR 763 as a Building Inspector, Contractor/Supervisor Abatement Worker, and Asbestos Project Designer; and has successfully completed the National Institute of Occupational Safety and Health (NIOSH) 582 course "Sampling and Evaluating Airborne Asbestos Dust" or equivalent. The QP must be qualified to perform visual inspections as indicated in ASTM E1368.[ The QP must be appropriately licensed in the State of [_____].]

1.2.28 TEM

Refers to Transmission Electron Microscopy.

1.2.29 Time Weighted Average (TWA)

The TWA is an 8-hour time weighted average airborne concentration of asbestos fibers.

1.2.30 Transite

A generic name for asbestos cement wallboard and pipe.

1.2.31 Wetting Agent

A chemical added to water to reduce the water's surface tension thereby increasing the water's ability to soak into the material to which it is applied. An equivalent wetting agent must have a surface tension of at

SECTION 02 82 00 Page 13 most 2.9 Pa 0.00042 psi .

1.2.32 Worker

Individual (not designated as the Competent Person or a supervisor) who performs asbestos work and has completed asbestos worker training required by 29 CFR 1926.1101 , to include EPA Model Accreditation Plan (MAP) "Worker" training; accreditation, if required by the OSHA Class of work to be performed or by the state where the work is to be performed.[ The worker must be appropriately licensed in the State of [_____].]

1.3 REQUIREMENTS

1.3.1 Description of Work

NOTE: Speci f y t he f or m, condi t i on and appr oxi mat e quantity squar e met er s or l i near met er s squar e f eet or l i near f eet of asbest os mat er i al t o be cont r ol l ed i n t he f i r st bl ank and t he l ocat i on of t he mat er i al i n t he second bl ank. Exampl e: " The asbest os wor k i ncl udes t he demol i t i on and r emoval of 90 m of 200 mm 300 f eet of 8 i nch di amet er asbest os i nsul at i on l ocat ed on exi st i ng st eam pi pi ng i ndi cat ed t o be r emoved i n t he boi l er r oom. " or " The asbest os wor k i ncl udes t he encapsul at i on of 270 squar e met er s 3, 000 squar e f eet of spr ayed on asbest os cont ai ni ng f i r e pr oof i ng mat er i al s l ocat ed above t he cei l i ng t hr oughout t he st r uct ur e. "

The use of t hi s sect i on i n t he cont r act speci f i cat i on means t hat known asbest os mat er i al i s i nvol ved. Est i mat e t he quant i t y and speci f y as uni t pr i ce i t ems i n Sect i on 00 21 13, I NSTRUCTI ONS TO BI DDERS or Sect i on 01 20 00. 00 20 Pr i ce and Payment Pr ocedur es per st andar d pr act i ce of t he act i v i t y pr epar i ng t he cont r act .

NOTE: I ncl ude r ef er ence t o 40 CFR 763 when asbest os wor k occur s i n a publ i c or pr i vat e school Gr ades K t hr u 12.

NOTE: Nonf r i abl e ACM may not r equi r e speci al handl i ng. However , dur i ng demol i t i on and r emoval of t hi s mat er i al dust and ai r bor ne asbest os f i ber s wi l l somet i mes be r el eased. I f t he pr oj ect cont ai ns nonf r i abl e asbest os whi ch may r el ease f i ber s when demol i shed and r emoved, t he nonf r i abl e asbest os must be r emoved i n t he same way as f r i abl e asbest os.

I ncl ude " Under nor mal . . . . speci f i ed her ei n. " , i f mat er i al t r adi t i onal l y def i ned as non- f r i abl e asbest os mat er i al s ar e t o be r emoved.

SECTION 02 82 00 Page 14

NOTE: The appropriate engineering control technique must comply with the requirements outlined in 29 CFR

1926.1101 which is selected based on existing conditions, but must be that technique that provides the best control during abatement at most reasonable cost.

The work covered by this section includes the handling and control of asbestos containing materials and describes some of the resultant procedures and equipment required to protect workers, the environment and occupants of the building or area, or both, from contact with airborne asbestos fibers. The work also includes the disposal of any asbestos containing materials generated by the work. More specific operational procedures must be outlined in the Asbestos Hazard Abatement Plan called for elsewhere in this specification. The asbestos work includes the demolition and removal of approximatly 8,600 SF located Building 805 [which is governed by 40 CFR 763 and NAVFAC P-502]. Under normal conditions non-friable or chemically bound materials containing asbestos would not be considered hazardous; however, this material may release airborne asbestos fibers during demolition and removal and therefore must be handled in accordance with the removal and disposal procedures as specified herein.

Provide negative pressure enclosure techniques as outlined in this specification. The building will be evacuated during the asbestos abatement work. A competent person must supervise asbestos removal work as specified herein.

1.3.1.1 Wallboard/Joint Compound

NOTE: When both composite and discrete sampling and testing is done on wallboard/joint compound, include and edit the following to address the site specific situation:

[ Both composite samples of the wallboard and discrete samples of the components (wallboard and joint compound) have been tested and results are attached.

][ Composite samples of the wallboard system were tested and found to contain [less than one percent asbestos] [_____]. Discrete samples of the wallboard were tested and found to contain [less than one percent asbestos] [_____]. Discrete samples of the joint compound were tested and found to contain [greater than one percent asbestos] [_____].

] 1.3.2 Unexpected Discovery of Asbestos

NOTE: Discovery of Unexpected Asbestos: Suspect asbestos containing material that is discovered during demolition (in particular buildings constructed no later than 1980), which was previously inaccessible, must be sampled and analyzed for its asbestos content. The Designer should anticipate additional sampling and analysis.

The Designer should provide Unit Price options in the Bid Form. Coordinate with the Designer of Record. The number of additional samples should be

SECTION 02 82 00 Page 15 based on t he ext ent of demol i t i on and pr evi ous sur vey dat a. Sampl i ng act i v i t i es under t aken t o det er mi ne t he pr esence of addi t i onal ACM shoul d be conduct ed by per sonnel who have successf ul l y compl et ed t he EPA Model Accr edi t at i on ( MAP) t r ai ni ng cour se and have EPA/ St at e cer t i f i cat i on/ l i cense as an Asbest os I nspect or .

Notify the Contracting Officer if any previously untested building components suspected to contain asbestos are impacted by the work.

1.3.3 Medical Requirements

Provide medical requirements including but not limited to medical surveillance and medical record keeping as listed in 29 CFR 1926.1101 .

1.3.3.1 Medical Examinations

Before exposure to airborne asbestos fibers, provide workers with a comprehensive medical examination as required by 29 CFR 1926.1101 or other pertinent State or local directives. This requirement must have been satisfied within the 12 months prior to the start of work on this contract. The same medical examination must be given on an annual basis to employees engaged in an occupation involving asbestos and within 30 calendar days before or after the termination of employment in such occupation. Specifically identify x-ray films of asbestos workers to the consulting radiologist and mark medical record jackets with the word

"ASBESTOS."

1.3.3.2 Medical Records

NOTE: Medi cal r ecor ds must be r et ai ned at l east 50 year s. Some St at es r equi r e l onger r et ent i on per i ods. Check wi t h t he St at e i n whi ch t he pr oj ect i s l ocat ed f or t he r equi r ed r et ent i on t i me.

Maintain complete and accurate records of employees' medical examinations, medical records, and exposure data for a period of [50 years][indefinite time] after termination of employment and make records of the required medical examinations and exposure data available for inspection and copying to: The Assistant Secretary of Labor for Occupational Safety and Health (OSHA), or authorized representatives of them, and an employee's physician upon the request of the employee or former employee.

1.3.4 Employee Training

NOTE: I ncl ude br acket ed sent ence wher e r equi r ed by l aw, r egul at i on or st at ut e.

Submit certificates, prior to the start of work but after the main abatement submittal, signed by each employee indicating that the employee has received training in the proper handling of materials and wastes that contain asbestos in accordance with 40 CFR 763 ; understands the health implications and risks involved, including the illnesses possible from

SECTION 02 82 00 Page 16 exposure to airborne asbestos fibers; understands the use and limits of the respiratory equipment to be used; and understands the results of monitoring of airborne quantities of asbestos as related to health and respiratory equipment as indicated in 29 CFR 1926.1101 on an initial and annual basis. Organize certificates by individual worker, not grouped by type of certification.[ Post appropriate evidence of compliance with the training requirements of 40 CFR 763 .] Train personnel involved in the asbestos control work in accordance with United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) training criteria or State training criteria whichever is more stringent.

Document the training by providing: dates of training, training entity, course outline, names of instructors, and qualifications of instructors upon request by the Contracting Officer. Furnish each employee with respirator training and fit testing administered by the PQP as required by 29 CFR 1926.1101 and 29 CFR 1926.103 . Fully cover engineering and other hazard control techniques and procedures. Asbestos workers must have a current State of New York asbestos worker's license.

1.3.5 Permits, Licenses, and Notifications

NOTE: The USEPA has delegated the responsibility of notification requirements to most States. Verify with the State and local authorities where the project is located whether the city, county, State, or USEPA has jurisdiction and whether a license is required.

Verify the specific notification requirements for the state where the work is being performed.

Prior to the start of work, obtain necessary permits and licenses in conjunction with asbestos removal, encapsulation, hauling, and disposition, and furnish notification of such actions required by Federal, State, regional, and local authorities. Notify the appropriate Federal, State, and local environmental protection agencies and control districts, and the Contracting Officer in writing

20 working days prior to commencement of work in accordance with 40 CFR 61-SUBPART M. Notify the Contracting Officer and other appropriate Government agencies in writing 20 working days prior to the start of asbestos work as indicated in applicable laws, ordinances, criteria, rules, and regulations. Submit copies of all Notifications to the Contracting Officer.[ Notify the local fire department 3 days prior to removing fire-proofing material from the building including notice that the material contains asbestos.]

1.3.6 Environment, Safety and Health Compliance

NOTE: The designer must research the State, regional and local laws, regulations, statutes, and list by authority and document number in the blank spaces provided those which apply to the asbestos work to be performed by the Contractor.

In addition to detailed requirements of this specification, comply with

SECTION 02 82 00 Page 17 those applicable laws, ordinances, criteria, rules, and regulations of Federal, State, regional, and local authorities regarding handling, storing, transporting, and disposing of asbestos waste materials. Comply with the applicable requirements of the current issue of EM 385-1-1 , 29 CFR 1926.1101 , 40 CFR 61-SUBPART A , 40 CFR 61-SUBPART M , 40 CFR 763 and ND OPNAVINST 5100.23 . Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting the work. Where the requirements of this specification, applicable laws, rules, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirement as defined by the Government apply. The following laws, ordinances, criteria, rules and regulations regarding removal, handling, storing, transporting and disposing of asbestos materials apply:

a. [_____]

b. [_____]

c. [_____].

1.3.7 Respiratory Protection Program

Establish and implement a respirator program as required by 29 CFR 1926.1101 , and 29 CFR 1926.103 . Submit a written description of the program to the Contracting Officer. Submit a written program manual or operating procedure including methods of compliance with regulatory statutes.

1.3.7.1 Respirator Program Records

Submit records of the respirator program as required by 29 CFR 1926.103 , and 29 CFR 1926.1101 .

1.3.7.2 Respirator Fit Testing

The Contractor's PQP must conduct a qualitative or quantitative fit test conforming to 29 CFR 1926.103 for each worker required to wear a respirator, and any authorized visitors who enter a regulated area where respirators are required to be worn. A respirator fit test must be performed prior to initially wearing a respirator and every 12 months thereafter. If physical changes develop that will affect the fit, a new fit test must be performed. Functional fit checks must be performed each time a respirator is put on and in accordance with the manufacturer's recommendation.

1.3.7.3 Respirator Selection and Use Requirements

Provide respirators, and ensure that they are used as required by 29 CFR 1926.1101 and in accordance with CGA G-7 and the manufacturer's recommendations. Respirators must be approved by the National Institute for Occupational Safety and Health NIOSH, under the provisions of 42 CFR 84 , for use in environments containing airborne asbestos fibers. For air-purifying respirators, the particulate filter must be high-efficiency particulate air (HEPA)/(N-,R-,P-100). The initial respirator selection and the decisions regarding the upgrading or downgrading of respirator type must be made by the Contractor's Designated IH based on the measured or anticipated airborne asbestos fiber concentrations to be encountered.

SECTION 02 82 00 Page 18

1.3.8 Asbestos Hazard Control Supervisor

The Contractor must be represented on site by a supervisor, trained using the model Contractor accreditation plan as indicated in the Federal statutes for all portions of the herein listed work.

1.3.9 Hazard Communication

Adhere to all parts of 29 CFR 1926.59 and provide the Contracting Officer with a copy of the Safety Data Sheets (SDS) for all materials brought to the site.

1.3.10 Asbestos Hazard Abatement Plan

Submit a detailed plan of the safety precautions such as lockout, tagout, tryout, fall protection, and confined space entry procedures and equipment and work procedures to be used in the [encapsulation] [removal] [and demolition] of materials containing asbestos. The plan, not to be combined with other hazard abatement plans, must be prepared, signed, and sealed by the PQP. Provide a Table of Contents for each abatement submittal, which follows the sequence of requirements in the contract.

The plan must include but not be limited to the precise personal protective equipment to be used including, but not limited to, respiratory protection, type of whole-body protection[ and if reusable coveralls are to be employed decontamination methods (operations and quality control plan)], the location of asbestos control areas including clean and dirty areas, buffer zones, showers, storage areas, change rooms, [removal] [encapsulation] method, interface of trades involved in the construction, sequencing of asbestos related work, disposal plan, type of wetting agent and asbestos sealer to be used, locations of local exhaust equipment, planned air monitoring strategies, and a detailed description of the method to be employed in order to control environmental pollution. The plan must also include (both fire and medical emergency) response plans and an Activity Hazard Analyses (AHAs) in accordance with EM 385-1-1 . The Asbestos Hazard Abatement Plan must be approved in writing prior to starting any asbestos work. The Contractor, Asbestos Hazard Control Supervisor,, CP and PQP must meet with the Contracting Officer prior to beginning work, to discuss in detail the Asbestos Hazard Abatement Plan, including work procedures and safety precautions. Once approved by the Contracting Officer, the plan will be enforced as if an addition to the specification. Any changes required in the specification as a result of the plan must be identified specifically in the plan to allow for free discussion and approval by the Contracting Officer prior to starting work.

1.3.11 Testing Laboratory

Submit the name, address, and telephone number of each testing laboratory selected for the[ sampling,] analysis, and reporting of airborne concentrations of asbestos fibers along with[ evidence that each laboratory selected holds the appropriate State license and permits and] certification that each laboratory is American Industrial Hygiene Association (AIHA) accredited and that persons counting the samples have been judged proficient by current inclusion on the AIHA Asbestos Analysis Registry (AAR) and successful participation of the laboratory in the Proficiency Analytical Testing (PAT) Program. Where analysis to determine asbestos content in bulk materials or transmission electron microscopy is required, submit evidence that the laboratory is accredited by the National Institute of Science and Technology (NIST) under National Voluntary Laboratory Accreditation Program (NVLAP) for asbestos analysis.

SECTION 02 82 00 Page 19

The testing laboratory firm must be independent of the asbestos contractor and must have no employee or employer relationship which could constitute a conflict of interest.

1.3.12 Landfill Approval

NOTE: The USEPA has del egat ed t he r esponsi bi l i t y of appr ovi ng l andf i l l s f or t he di sposal of asbest os t o most St at es. Ver i f y wi t h t he St at e i n whi ch t he pr oj ect i s l ocat ed whet her t he St at e or USEPA has j ur i sdi ct i on and what l aws appl y.

Submit written evidence that the landfill is approved for asbestos disposal by the U.S. Environmental Protection Agency, Region [3][_____], Air Enforcement Section [(38W12)][_____], and local regulatory agencies.

Within three working days after delivery, submit detailed delivery tickets , prepared, signed, and dated by an agent of the landfill, certifying the amount of asbestos materials delivered to the landfill. Submit a copy of the waste shipment records within one day of the shipment leaving the project site.

1.3.13 Transporter Certification

NOTE: Desi gner shoul d ut i l i ze and r ef er ence, wher e appr opr i at e, Sect i on 02 81 00 TRANSPORTATI ON AND DI SPOSAL OF HAZARDOUS MATERI ALS as a par t of t he cont r act document s or i ncl ude t he appr opr i at e Depar t ment of Tr anspor t at i on ( DOT) r equi r ement s f r om 49 CFR 107, 171, 172, and 173. I f Sect i on 02 81 00 i s not i ncl uded, edi t t hi s par agr aph t o i ncl ude t he DOT r ef er ences. The cont r act document s must addr ess al l appl i cabl e DOT r equi r ement s i ncl udi ng t hose f or shi ppi ng, t r ai ni ng, cer t i f i cat i ons, packagi ng, mar ki ngs, l abel i ngs, and pl acar ds f or shi pper s and t r anspor t er s i n addi t i on t o Gover nment , OSHA and EPA requirements.

Submit written evidence that the transporter is approved to transport asbestos waste in accordance with the DOT requirements of 49 CFR 171 , 49 CFR 172 and 49 CFR 173 as well as registration requirements of 49 CFR 107 and all other State and local regulatory agency requirements.

1.3.14 Medical Certification

Provide a written certification for each worker and supervisor, signed by a licensed physician indicating that the worker and supervisor has met or exceeded all of the medical prerequisites listed herein and in 29 CFR 1926.1101 and 29 CFR 1926.103 as prescribed by law. Submit certificates prior to the start of work but after the main abatement submittal.

1.4 SUBMITTALS

NOTE: Revi ew Submi t t al Descr i pt i on ( SD) def i ni t i ons

SECTION 02 82 00 Page 20 i n Sect i on 01 33 00 SUBMI TTAL PROCEDURES and edi t t he f ol l owi ng l i s t t o r ef l ect onl y t he submi t t al s r equi r ed f or t he pr oj ect .

The Gui de Speci f i cat i on t echni cal edi t or s have desi gnat ed t hose i t ems t hat r equi r e Gover nment appr oval , due t o t hei r compl exi t y or cr i t i cal i t y, wi t h a " G. " Gener al l y, ot her submi t t al i t ems can be r evi ewed by t he Cont r act or ' s Qual i t y Cont r ol Syst em. Onl y add a " G" t o an i t em, i f t he submi t t al i s suf f i c i ent l y i mpor t ant or compl ex i n cont ext of t he pr oj ect .

For submi t t al s r equi r i ng Gover nment appr oval on Ar my pr oj ect s, a code of up t o t hr ee char act er s wi t hi n t he submi t t al t ags may be used f ol l owi ng t he " G" desi gnat i on t o i ndi cat e t he appr ovi ng aut hor i t y.

Codes f or Ar my pr oj ect s usi ng t he Resi dent Management Syst em ( RMS) ar e: " AE" f or Ar chi t ect - Engi neer ; " DO" f or Di st r i ct Of f i ce ( Engi neer i ng Di v i s i on or ot her or gani zat i on i n t he Di st r i ct Of f i ce) ; " AO" f or Ar ea Of f i ce; " RO" f or Resi dent Of f i ce; and " PO" f or Pr oj ect Of f i ce. Codes f ol l owi ng t he " G" t ypi cal l y ar e not used f or Navy, Ai r For ce, and NASA pr oj ect s.

The " S" f ol l owi ng a submi t t al i t em i ndi cat es t hat t he submi t t al i s r equi r ed f or t he Sust ai nabi l i t y eNot ebook t o f ul f i l l f eder al l y mandat ed sust ai nabl e r equi r ement s i n accor dance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Locat e t he " S" submi t t al under t he SD number t hat best descr i bes t he submi t t al i t em.

Choose t he f i r st br acket ed i t em f or Navy, Ai r For ce and NASA pr oj ect s, or choose t he second br acket ed i t em f or Ar my pr oj ect s.

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are [for Contractor Quality Control approval.][for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.] Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

NOTE: The submi t t al s r equi r ed f or each pr oj ect ar e ver y dependent upon t he r emoval met hod t o be used.

Edi t t he submi t t al s par agr aph accor di ngl y.

SD-03 Product Data

Amended Water ; G[, [_____]]

Safety Data Sheets (SDS) for All Materials ; G[, [_____]]

SECTION 02 82 00 Page 21

Encapsulants ; G[, [_____]]

Respirators ; G[, [_____]]

Local Exhaust Equipment ; G[, [_____]]

Pressure Differential Automatic Recording Instrument ; G[, [_____]]

Vacuums; G[, [_____]]

[ Glovebags ; G[, [_____]]

] SD-06 Test Reports

Air Sampling Results ; G[, [_____]]

Pressure Differential Recordings for Local Exhaust System ; G[, [ Encapsulation Test Patches ; G[, [_____]]

] Clearance Sampling ; G[, [_____]]

Asbestos Disposal Quantity Report ; G[, [_____]]

SD-07 Certificates

NOTE: Ver i f y and i ncl ude cont r act or ' s and wor ker ' s l i censes as r equi r ed f or t he st at e wher e t he wor k i s bei ng per f or med.

Employee Training ; G[, [_____]]

Notifications ; G[, [_____]]

Respiratory Protection Program ; G[, [_____]]

Asbestos Hazard Abatement Plan ; G[, [_____]]

Testing Laboratory ; G[, [_____]]

Landfill Approval ; G[, [_____]]

Delivery Tickets ; G[, [_____]]

Waste Shipment Records ; G[, [_____]]

Transporter Certification ; G[, [_____]]

Medical Certification ; G[, [_____]]

Private Qualified Person Documentation ; G[, [_____]]

Designated Competent Person ; G[, [_____]]

Worker's License ; G[, [_____]]

SECTION 02 82 00 Page 22

Contractor's License ; G[, [_____]]

Federal, State or Local Citations on Previous Projects ; G[, Encapsulants ; G[, [_____]]

Equipment Used to Contain Airborne Asbestos Fibers ; G[, [_____]]

Water Filtration Equipment ; G[, [_____]]

Vacuums; G[, [_____]]

Ventilation Systems ; G[, [_____]]

SD-11 Closeout Submittals

Permits[ and Licenses] ; G[, [_____]]

Notifications ; G[, [_____]]

Respirator Program Records ; G[, [_____]]

[ Protective Clothing Decontamination Quality Control Records ; G[, ][ Protective Clothing Decontamination Facility Notification ; G[, ] Rental Equipment ; G[, [_____]]

1.5 QUALITY ASSURANCE

1.5.1 Private Qualified Person Documentation

NOTE: Edi t r equi r ement f or pr i vat e qual i f i ed per son t o have l i censi ng.

Submit the name, address, and telephone number of the Private Qualified Person (PQP) selected to prepare the Asbestos Hazard Abatement Plan, direct monitoring and training, and documented evidence that the PQP has successfully completed training in and is accredited and where required is certified as, a Building Inspector, Contractor/Supervisor Abatement Worker, and Asbestos Project Designer as described by 40 CFR 763 and has successfully completed the National Institute of Occupational Safety and Health (NIOSH) 582 course "Sampling and Evaluating Airborne Asbestos Dust" or equivalent.[ The PQP must be appropriately licensed in the State of [_____] as a Project Monitor]. The PQP and the asbestos contractor must not have an employee/employer relationship or financial relationship which could constitute a conflict of interest. The PQP must be a first tier subcontractor.

1.5.2 Designated Competent Person Documentation

NOTE: Edi t r equi r ement f or l i censi ng.

SECTION 02 82 00 Page 23

The Designated Competent Person must be experienced in the administration and supervision of asbestos abatement projects including exposure assessment and monitoring, work practices, abatement methods, protective measures for personnel, setting up and inspecting asbestos abatement work areas, evaluating the integrity of containment barriers, placement and operation of local exhaust systems, ACM generated waste containment and disposal procedures, decontamination units installation and maintenance requirements, site safety and health requirements, notification of other employees onsite, [_____]. The Designated Competent Person must be on-site at all times when asbestos abatement activities are underway.Submit training certification and a current State of [_____] Asbestos Contractor's and Supervisor's License. Submit evidence that the Designated Competent Person has a minimum of [2] [_____] years of on-the-job asbestos abatement experience relevant to OSHA designated competent person requirements. The Designated Competent Person must be a first tier subcontractor.

1.5.3 Worker's License

NOTE: Edi t r equi r ement f or l i censi ng.

Submit…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .