1. Do we follow Section L for the proposal preparation or page 19?

Answer: Sections L & M have been updated to correct inconsistencies

2. Do resumes count toward the 20 page limit?

Answer: If resumes are provided as documentation instead of a proposed plan as part of your technical proposal then yes, they would count as part of your page count.

3. Regarding the drawings, are we anticipated to receive less than 35% complete drawings on projects where drawings are needed?

Answer: The Government will only supply As-Built drawings or 100% drawings unless we are asking the SABER to produce the drawings.

4. What percent complete drawings are we expected to submit on the projects where it’s required?

Answer: When we do ask the SABER to produce drawings they will be expected to be completed in phases (i.e., 35-65-95-100%) depending on the complexity of the project.

5. Can you tell me the building number (location) for the seed project?

Answer: Building 403

6. What is the square footage of the concrete pad for the seed project Answer: 771.25 sf image1.jpeg