STATEMENT OF WORK
RVKQ 17-0724 – Repair Concrete Sidewalk
21 February 18
1. SUMMARY OF WORK: The Contractor shall furnish and install all material, equipment, components, parts, tools, labor, transportation, hauling, disposal/recycling, cleaning, inspection, testing, commissioning, training, reporting, etc., necessary to perform this project as described in the contract-delivery order, including this Statement of Work and any / all applicable federal, state and local law, regulation, standards. Unless otherwise stated, any / all requirement for contractor to remove and properly dispose of / recycle off base, and to furnish and install / incorporate any / all new materials / equipment / components needed to properly complete the work item; any Government furnished property and / or reinstallation of existing materials / equipment / components shall be as stated / specified herein. Contractor shall submit materials / methods for approval prior to ordering and / or incorporation into the work; as a minimum, submittals shall include product literature, MSDS, standard color, texture and style samples / swatches / boards, and place of origin / manufacture. Demolished materials, waste / debris is property of the contractor, unless otherwise stated herein; contractor is responsible for proper disposal / recycling of such materials off base; such materials shall be promptly removed from the installation and shall not be stored / stockpiled unless submitted and approved for such. Contractor is responsible for verification of all details, measurement, etc., prior to ordering materials and execution of work.
This building will be occupied during renovation. The contractor must coordinate/ reduce any disruption to occupants during demolition/ build of this project.
2. Demo/ Install Concrete Sidewalk along Northeast corner of the building.
a. Demo existing concrete pad along northeast corner of the building outside of mechanical room.
b. Demo existing concrete sidewalk along northeast corner of the building to the parking lot.
c. Demo existing metal handrail.
d. Install new 4” concrete pad and 6” compacted gravel base, match existing overall layout. Slope concrete pad away from the building to
914 MSG / CEC
Niagara Falls Air Reserve Station 2405 Franklin Drive Niagara Falls, New York 14304-5063
RVKQ 17-0724 – Repair Concrete Sidewalk – Fac 2981 prevent water infiltration into the building wall. The concrete shall be 3000 psi, cast in place, 6x6-W1.4xW1.4 mesh reinforcing, broomed finish, 4” minimum thickness.
e. Install new single line sloped aluminum handrail at the edge of new sidewalk. The railing will be on the right side of the sidewalk going down the ramp. The railing will be 1 ½” schd 40, 6061 aluminum pipe.
The railing will have clear anodized finish. The handrail will be fully welded construction or modular component rail (such as Wagner Internarail system or equal). The modular railing shall not be external slip-on style railing systems. Fully welded construction railing shall have all joints smooth finish. “Weld Staining” shall be rejected on anodized finished railings. The railing is to be scratch free, uniform finish.
3. A submittal of intended materials and drawings is requested for the following items for review before installation: handrail fabrication/installation drawing, concrete mix submittal. Also, see Environmental section below for required submittal documentation.
4. All installation of materials will be per manufacturer’s recommendations and local, state and federal building code requirements. All materials must meet NFPA Fire ratings and IAW current standards.
5. The Contractor shall be responsible for the proper disposal of all materials removed and shall ensure that the facility is secure and available for use at the end of each duty day.
6. ENVIRONMENTAL MANAGEMENT AND PROTECTION
a. A Demolition Plan meeting the requirements of environmental specification section 01 57 20, must be submitted for review prior to any work.
b. A Storm Water Pollution Prevention Plan (for disturbance less than 1 acre) meeting the requirements of environmental specification section 01 57 20, must be submitted for review prior to any work.
c. The contractor must also prepare and submit the U.S. EPA Notification of Demolition for review by 914 MSG/CEV. Upon review and approval, the contractor must submit the completed notification form to the U.S. EPA in accordance with applicable regulations.
d. Demolition materials to be listed on the Waste / Recycle Materials Log for Contractors
7. Green Purchasing
a. Contractor shall comply with the Green Purchasing requirements of the contract. Known / possible EPA Comprehensive Procurement Guideline, USDA Biobased, Green Seal Energy Star, etc., items.
RVKQ 17-0724 – Repair Concrete Sidewalk – Fac 2981
Recycled materials must be used to fullest extent in accordance with Executive Order 13101. The EPA web-site, http://www.epa.gov/cpg, can be accessed for further instruction on what is an EPA-designated material.
http://www.epa.gov/cpg