Repair Stormwater Drainage
RVKQ 11-0489
Site Visit Questions
- Will the station be closed during construction?
Yes.
- Will we have access to water and electric?
Refer to Spec section 01 11 00 – 1.10 Utilities.
- Can vertical and horizontal core drilling be implemented instead of the concrete island removal?
Bid as shown.
- Will hydrostatic testing, deflection testing and external seal bands be required for this drainage, considering it will be unpressurized water drainage?
No. An Addendum to add the following sentence to Spec section 33 40 00 – 2.3.1 will be incorporated into the contract:
Manufacturer data indicating that products meet noted criteria are acceptable in lieu of contractor testing.