MAIN GATE

FUELING DETOUR ROUTE

FACILITY 920

ALTERNATE FUELING LOCATION

LOX TANKS

DRAWING INDEX

TITLESHEET NO.DRAWING NO. INDICATOR

1 OF 5 T-01 TITLE SHEET, LOCATION MAP AND DRAWING INDEXNGF 532-003

2 OF 5 C-01 EXISTING CONDITION - SURVEY

4 OF 5 C-03

STORMWATER REPAIRS SITE PLAN

DETAILS - 1

3 OF 5 C-02

GENERAL NOTES

A. DO NOT SCALE DRAWINGS: NOTIFY THE CONTRACTING OFFICER IF ADDITIONAL DIMENSIONS ARE

REQUIRED. CONTRACTORS SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTIFY THE CONTRACTING

OFFICER OF ANY DISCREPANCIES.

B. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS INDICATED GRAPHICALLY OR AS NOTED.

CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER OF ANY DISCREPANCIES IN IDENTIFICATION OF

MATERIALS REQUIRED.

C. VERIFY ALL EXISTING CONDITIONS AT THE SITE. REPORT ANY DISCREPANCIES BETWEEN THE DRAWINGS AND THE ACTUAL FIELD CONDITIONS TO THE CONTRACTING OFFICER BEFORE CONSTRUCTION BEGINS.

D. FULL SCALE DRAWINGS AND OR DETAILS SHALL TAKE PRECEDENCE OVER REDUCED SCALE DRAWINGS.

NOTIFY CONTRACTING OFFICER OF ANY DISCREPANCY NOTED.

E. INSTALL ALL MATERIALS TO THE MANUFACTURER RECOMMENDATIONS AND TO ACCEPTABLE

PROFESSIONAL TRADE INDUSTRY STANDARDS FOR FIRST CLASS WORK OF SIMILAR NATURE AND

CHARACTER.

F. THE CONTRACTOR SHALL DESIGNATE A PERSON AND A BACKUP INDIVIDUAL WHO CAN BE CONTACTED 24 HOURS A DAY IN THE EVENT OF AN EMERGENCY. THESE PEOPLE SHALL BE AUTHORIZED TO MAKE FIELD DECISIONS ON THE COMPANY'S BEHALF IN COOPERATION WITH THE BASE ENGINEER AND CONTRACTING

OFFICER.

G. OTHER CONTRACTORS MAY BE WORKING IN THE PROXIMITY OF WORK ASSOCIATED WITH THIS PROJECT AND MAY HAVE COMMON HAUL ROUTES AND GATE ACCESS FOR OTHER AREAS ON THE BASE UNDER

CONSTRUCTION. CLOSE COORDINATION AND COOPERATION WILL BE REQUIRED BETWEEN OTHER

CONTRACTORS AND BASE PERSONNEL FOR ANY/ALL CLOSURES AS WELL AS MAINTENANCE ACTIVITIES BEING PERFORMED IN AND AROUND THE PROJECT SITE. CONTRACTOR TO WORK IN CONJUNCTION WITH THE BASE ENGINEER, AIRFIELD OPERATIONS AND OTHER CONTRACTORS IN COORDINATING SCHEDULES

IN ORDER TO MINIMIZE CONFLICTS AND COMPLETE THE PROJECT IN A TIMELY MANNER.

H. THE CONTRACTOR SHALL CONFINE HIS WORK ACTIVITIES TO THE WORK AREA SHOWN ON THE PLAN AND SHALL LIMIT HIS TRAVEL TO AND FROM THE WORK SITE TO THE HAUL ROUTES SHOWN ON THE PLANS.

I. ALL CONTRACTOR EMPLOYEES AND VEHICLES SHALL BE REGISTERED AND BADGED IN ACCORDANCE

WITH REGULATIONS AND PROCEDURES AS MANDATED BY AIR FORCE BASE REGULATIONS.

CONTRACTOR IS RESPONSIBLE TO ARRANGE FOR THE REGISTRATION, CLEARANCE AND BADGING OF

EMPLOYEES AND VEHICLES. CONTRACTOR IS ALSO RESPONSIBLE TO ARRANGE FOR PROPER

CLEARANCE AND ACCESS REQUIREMENTS FOR ALL SUBCONTRACTORS AND MATERIAL SUPPLIERS

RELATED TO THE PROJECT.

CE

APPROVALS

DATEAGENCY SIGNATURE

CEC

CEV

CEF

LGC

SEG

SGPB

SGN

ABBREVIATIONS & SYMBOLS

PROJECT SITE

GAS STATION

J. ALL TRUCKS HAULING DEBRIS FROM THE AIR BASE SHALL BE EQUIPPED WITH

TAILGATES AND COVER TARPS SO THAT DEBRIS ARE NOT PERMITTED TO SPILL OR

BE WINDBLOWN FROM THE TRUCK. UNDER NO CIRCUMSTANCES WILL TRUCKS BE

PERMITTED TO BE LOADED GREATER THAN THE LEGAL LIMIT OR HIGHER THAN THE

SIDEBOARDS. TRUCKS NOT MEETING THESE REQUIREMENTS WILL BE REMOVED

FROM WORKING ON THE PROJECT AT THE DIRECTION OF THE BASE ENGINEER OR

CONTRACTING OFFICER.

K. THE CONTRACTOR SHALL TAKE MEASURES TO PROTECT ALL EXISTING FACILITIES,

UTILITIES AND STRUCTURES DURING CONSTRUCTION OF THIS PROJECT. THIS SHALL

INCLUDE ALL TEMPORARY SUPPORTS, BRACING AND OTHER DEVICES TO PROTECT

THE SAFETY OF AFFECTED FACILITIES. ALL COSTS FOR THIS SHALL BE INCLUDED IN

THE VARIOUS CONTRACT ITEMS.

L. EXISTING UNDERGROUND UTILITIES SHOWN ON THE DRAWINGS ARE BASED ON

INFORMATION OBTAINED BY THE SURVEYOR AND FROM AVAILABLE RECORDS. THE

CONTRACTOR IS CAUTIONED THAT THESE LOCATIONS ARE NOT GUARANTEED

ACCURATE AND ARE SUBJECT TO VERIFICATION. THE CONTRACTOR IS

RESPONSIBLE TO LOCATE UTILITIES PRIOR TO EXCAVATION AND SHALL PERFORM

ALL WORK CAREFULLY AND PROTECT ALL EXISTING UTILITIES TO PREVENT DAMAGE

DURING CONSTRUCTION.

M. THE CONTRACTOR SHALL KEEP WORK AREAS AND ADJACENT PREMISES AS FREE

FROM EXCESS MATERIALS, DEBRIS AND RUBBISH AS IS POSSIBLE DURING

CONSTRUCTION. THE CONTRACTOR SHALL REMOVE ALL TEMPORARY STRUCTURES,

SURPLUS MATERIAL, TOOLS, EQUIPMENT, IMPLEMENTS AND ALL OTHER MATERIALS

CONNECTED WITH OR CAUSED BY THE WORK IMMEDIATELY UPON COMPLETION OF

THE WORK. THE CONTRACTOR SHALL LEAVE THE PREMISES IN AS GOOD OF

CONDITION AS WAS FOUND AT THE BEGINNING OF THE CONSTRUCTION CONTRACT.

N. THE CONTRACTOR SHOULD NOTE THAT ADDITIONAL WORK AND OR MINOR CHANGES

TO THE WORK SHOWN ON THE PLANS MAY BE REQUIRED AS THE CONTRACT

PROGRESSES. THESE CHANGES AND OR ADDITIONS WILL BE APPROVED BY THE

CONTRACTING OFFICER. WORK WILL BE PERFORMED BY THE CONTRACTOR AS

DIRECTED AND PAYMENT WILL BE MADE FOR THE ACTUAL ADDITIONAL QUANTITIES

OF MATERIAL AND LABOR USED TO COMPLETE THE WORK.

O. CONTRACTOR SHALL SCHEDULE AND CONDUCT ALL CONSTRUCTION TO MINIMIZE

EROSION. APPROVED EROSION AND SEDIMENTATION CONTROL MEASURES IN

COMPLIANCE WITH N.Y. STATE STANDARDS MUST BE PROVIDED AND MAINTAINED

UNTIL ALL WORK IS COMPLETED AND THE SITE IS STABILIZED.

P. CONTRACTOR OPERATIONS MAY REQUIRE TEMPORARY CLOSING OF THE MILITARY

GAS STATION AND USE OF THE AIR NATIONAL GUARD FUELING STATION, FACILITY

920. TEMPORARY CLOSING(S) MUST BE APPROVED AT LEAST 48 HOURS IN ADVANCE

AND BE COORDINATED WITH THE CONTRACTING OFFICER.

50' 100' 200'150' 25 75 125 1755

470 FRANKLIN STREET

ARCHITECTS

BUFFALO, NEW YORK 14202

ENGINEERS

716 / 883 - 4400

TA PROJECT NO. 11080.00

KEY PLANS

NTS

FACILITY 532

LEGEND

PRIMARY ACCESS & HAUL ROUTE

DETOUR TO ALTERNATE FUEL STATION, FACILITY 920

5 OF 5 C-04 DETAILS - 2

NGF 532-003

NGF 532-003

NGF 532-003

NGF 532-003

50' 100' 200'150' 25 75 125 1755

470 FRANKLIN STREET

ARCHITECTS

BUFFALO, NEW YORK 14202

ENGINEERS

716 / 883 - 4400

TA PROJECT NO. 11080.00

KEY PLANS

NTS

FACILITY 532

470 FRANKLIN STREET

ARCHITECTS

BUFFALO, NEW YORK 14202

ENGINEERS

716 / 883 - 4400

TA PROJECT NO. 11080.00

KEY PLANS

470 FRANKLIN STREET

ARCHITECTS

BUFFALO, NEW YORK 14202

ENGINEERS

716 / 883 - 4400

TA PROJECT NO. 11080.00

KEY PLANS

470 FRANKLIN STREET

ARCHITECTS

BUFFALO, NEW YORK 14202

ENGINEERS

716 / 883 - 4400

TA PROJECT NO. 11080.00

KEY PLANS