This is a Project Manual Specifications document issued for the Building 305 Office Renovations project (ZQEL 19-0016) at Youngstown Air Reserve Station in Vienna, Ohio, dated January 10, 2026. The specifications establish the technical requirements, submittal procedures, and environmental protocols for renovation work on the Aircraft Maintenance Hanger, specifically the Commander's Suite area and adjacent hallway. The scope includes demolition of existing walls, doors, and drop ceilings in rooms 248–249; removal and replacement of carpeting in rooms 246–249; relocation of electrical systems; installation of new walls and finishes; installation of new vinyl base cove (6-inch Wedgewood Blue in hallway); replacement of doors with solid cherry finish while reusing existing hardware; painting of metal jambs; installation of 6' x 4' picture windows; and rerouting of existing ductwork. Additional work includes landscaping with planting of 30 trees, including three Norway Spruce trees on an earthen mound at the perimeter fence line. The project is estimated between $100,000 and $250,000 with a single firm-fixed-price award anticipated. This is a 100% HUBZone Small Business Set-Aside, requiring awardee certification at time of award. The specifications require two copies of all submittals and include detailed requirements for waste management and recycling, environmental protection, hazardous materials handling, dust control, and compliance with federal regulations including the Clean Water Act, Clean Air Act, and Resource Conservation and Recovery Act.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
PROJECT MANUAL
SPECIFICATIONS
Issued for 100% Submittal – 10 January 2026
For
MAINTAIN/REPAIR/CONSTRUCT VARIOUS ROOM
RENOVATIONS AT BUILDING 305
MX COMMANDER OFFICES
ZQEL 19-0016
910th For
AIRLIFT WING
3976 KING GRAVES ROAD
VIENNA, OHIO 44473-5931
PREP ARED BY
DEPARTMENT OF THE AIR FORCE
910th BASE CIVIL ENGINEERING OFFICE
3976 KING GRAVES ROAD, BLDG 510
VIENNA, OHIO 44473-5931
THIS PAGE IS INTENTIONALLY BLANK
910th Airlift Wing Youngstown Air Reserve Station Construct/Maintain//Repair Various Rooms
USAFR ZQEL 19-0016
TABLE OF CONTENTS 00 00 01 -3
TABLE OF CONTENTS
Division 00 – General Conditions
01 01 01 Project Title Sheet 01 01 10 Table of Contents 01 01 15 List of Drawing Sheets
Division 01 – General Requirements 01 00 00 General Requirements 01 30 01 Submittal Descriptions 01 33 00 Submittal Procedures
AF Form 66 AF Form 103 AF Form 3000 AF Form 3064 AF Form 3065
01 35 43 Environmental Procedures 01 42 00 Sources for Reference Publications 01 60 00 Product Requirements 01 73 29 Cutting and Patching 01 74 19 Construction Waste Management
Division 02 – Existing Conditions
2 41 19 Selective Building Demolition Division 03 Concrete - Not Used
Division 04 Masonry – Not Used
Division 05 Metals – Not Used
Division 06 – Wood, Plastics, and Composites
Division 07 – Thermal and Moisture Control – Not Used
Division 08 – Openings
08 11 13 Hollow Metal Doors and Frames
08 14 16 Flush Wood doors 08 31 00 Access Doors and Panels
06 10 00 Rough Carpentry 06 16 43 Sheathing 06 20 23 Finish Carpentry 06 40 23 Interior Architectural Woodwork 06 65 10 Solid Surfacing
Construct/Maintain//Repair Various Rooms
TABLE OF CONTENTS 00 00 01 -4
08 41 13 Aluminum Framed Entrances 08 51 13 Aluminum Windows 08 71 00 Door Hardware 08 80 00 Glazing 08 88 10 SuperLite II XL Glazing, 2 Hr Fire Rated
Division 09 – Finishes
09 22 16 Non-Structural Metal Stud Framing 09 22 26 Metal Suspension 09 29 00 Gypsum Board 09 30 00 Hard Tile 09 51 00 Acoustical Ceilings 09 51 13 Acoustical Tile Ceilings 09 65 13 Resilient Base 09 68 13 Tile Carpeting 09 91 00 Painting
Divisions 10 – Specialties
10 14 00 Signage
Division 11 – Furnishings – NOT USED
Division 12 thru 22 – NOT USED
Divisions 23 Heating, Ventilation, and Air-Conditioning (HVAC)
23 01 00 Heating, Ventilation and Air Conditioning, General 23 05 29 Pipe Hangers and Supports for HVAC Piping 23 05 53 Equipment, Piping and Ductwork Identification 23 07 13 Insulation 23 36 13 Grilles, Registers, Diffusers
Divisions 24 through 25 – Not Used
Construct/Maintain//Repair Various Rooms
TABLE OF CONTENTS 00 00 01 -5
Division 26 –Electrical
26 05 00 Common Work Results for Electrical 26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems 26 05 33 Raceways and Boxes for Electrical Systems 26 07 50 Identification for Electrical Systems 26 09 23 Lighting Control Devices 26 12 00 Conductors and Cables 26 27 26 Wiring Devices 26 28 16 Enclosed Switches and Circuit Breakers 26 50 00 Fire Alarm 26 51 00 Lighting
Division 27 – Communications
27 05 00 Common Work Results for Communications
27 15 00 Communications Cabling
Divisions 28 through 31 – Not Used
32 93 00 Landscape Planting
32 94 00 Planting Accessories
END OF DOCUMENT
Construct/Maintain/Repair Various Rooms
GENERAL REQUIREMENTS 01 00 00-6
DOCUMENT 00015
LIST OF DRAWINGS
Sheet Nos.
Sheet Title
Date of Issue
MAINTAIN/REPAIR/CONSTRUCT VARIOUS ROOM RENNOVATIONS
AT BUILDING 305 MX COMMANDER OFFICES
PROJECT # ZQEL 19-001
1 of 11 G1 Title Sheet 10 Jan 2026
2 of 11 G2 Structural General Notes 10 Jan 2026
3 of 11 A1 Hanger 305 Location Map 10 Jan 2026
4 of 11 A2 Existing Site Plan & Demolition Key Notes 10 Jan 2026
5 of 11 A3 Proposed Site Plan & Key Notes 10 Jan 2026
6 of 11 A4 Door & Wall Schedule 10 Jan 2026
7 of 11 A5 Ceiling Grid & Electrical Plan 10 Jan 2026
8 of 11 A6 Power Layout Plan 10 Jan 2026
9 of 11 A7 Existing Hanger Wall Section 10 Jan 2026
10 of 11 A8 Proposed Hanger Wall Section 10 Jan 2026
11 of 11 A9 Proposed Interior Wall Sections 10 Jan 2026
Added 04/08/2026 Landscape Mounding and Plantings
1 of 1 A10 Landscape Mound, Evergreens & Details 8 Apr 2026
Construct/Maintain/Repair Various Rooms
GENERAL REQUIREMENTS 01 00 00-7
SECTION 01 00 00 - GENERAL REQUIREMENTS
PART 1 – GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. The Contractor shall furnish all supervision, labor, materials, tools, equipment, apparatus, and transportation required to complete the construction in conformity with the Contract Documents.
B. The Project is to Maintain/Repair/Construct Various Room Renovations for building 305.
Rooms will be reconfigured to provide the Maintenance CC office space suitable to their needs.
C. The Work consists of – but is not limited to – the following
1. Building 305: Aircraft Maintenance Hanger Remodel of Commanders Suite Area, and portion of hallway leading to commanders suite. Work to include: Remove exiting walls, doors and drop ceiling from room 248-
249. R e m o v e e l e c t r i c a l w i t h i n i n t e r i o r w a l l s , r e l o c a t e t o o n e w w a l l . R e m o v e carpeting from 246-247-248-249. Install new walls as per plan.
All walls to be painted, new vinyl base cove to be installed. Hallway base cove to be 6” (Wedgewood Blue). Remove and Replace doors with solid cherry finish, existing hardware to be reused and kick plates to be replaced. From existing doors to be installed on new doors. Metal Jambs to be painted. Install 6’ x 4’ picture windows as shown. Existing Duct Work in Hanger to be rerouted as shown.
2. Base Beautification, Tree Plantings TREE CITY USA
Planting of trees will be a standard for all Projects on base. Contractor will incorporate the planting of 30 select trees at a designated place around project location or as noted around base. This project will designate 3 Norway Spruce trees to be planted on an earthen mound along the fence line of Perimeter Road at the westerly corner of the base property. Area is located outside the main perimeter fencing of the installation. Mound will be 3’-4’ wide at the top and a minimum of 3’ tall. Refer to Section 32 93 00 & 32 94 00.
1.3 SCHEDULE
A. The contractor is advised that the work required must be scheduled to occur between base UTA schedule time. UTA schedules occur every 30 calendar days, and contractors activities shall be coordinated between the MX operations schedule and staff and the contractor, with approval of the Contracting Officer. Refer to article 1.7 of this Section for additional requirements
Construct/Maintain/Repair Various Rooms
GENERAL REQUIREMENTS 01 00 00-8
1.4 REFERENCES
A. United States Air Force (USAF or AF) Forms:
1. Base Civil Engineering Work Clearance Request Form (AF Form 103): Found at the end of this Section.
2. The Material Approval Submittal Transmittal Form (AF Form 3000): Found at the end of Section 01 33 00 – Submittal Procedures.
1.5 DEFINITIONS
A. Any and all references in the Specifications and/or on the Drawings to – and/or requirements for – “notifications” shall be taken to mean written notification to the Contracting Officer.
B. Any and all references in the Specifications and/or on the Drawings to – and/or requirements for – “submittals” shall be taken to mean submittals in accordance with both of the following:
1. Section 01 30 01 – Submittal Descriptions.
2. Section 01 33 00 – Submittal Procedures.
C. Any and all references to – and/or requirements for materials and work to be in – compliance with the Manufacturer’s recommendations shall be taken to mean – and/or includes the requirement that:
Work shall be accomplished in accordance with the Manufacturer’s recommendations.
In the event of a conflict between the Manufacturer’s recommendations and the Specifications, the Manufacturer’s recommendations shall take precedence. Any and all references to – and/or requirement for – testing by “an approved independent commercial testing laboratory” shall be taken to mean an independent testing laboratory that has been approved by the United States Army Corps of Engineers (USACE) within the last year.
1.6 DOCUMENTS
A. The Contractor shall be responsible for reviewing the complete set of Contract Documents for:
1. Procedures.
2. Space requirements.
3. Materials.
4. Installation sequence.
5. Similar items.
B. The Contractor shall coordinate efforts with all others working on the Project.
Construct/Maintain/Repair Various Rooms
GENERAL REQUIREMENTS 01 00 00-9
1.7 CONTRACTOR USE OF THE PREMISES
A. The Work shall not commence until the Contractor receives a completed AF Form 103 from Base Engineering.
B. Confine construction activities to areas defined for the Work in the Specifications and on the Drawings – or specifically assigned for that use by the Contracting Officer. Do not use any other areas on Government premises without written consent of the Contracting Officer.
C. Do not unreasonably encumber the Site with materials or equipment.
D. Assume full responsibility for protection and safekeeping of products stored at the Site.
E. The Government will occupy the premises during the construction period. Coordinate required shutdowns of building areas with the Government to facilitate construction operations and minimize conflict with Government usage.
F. The building occupants will remove personal and work-related materials from the work areas prior to the Contractor starting work in those areas.
G. Move, protect, store, and return furniture, equipment, and other items as necessary to complete painting, wall covering, tiling, carpeting, or any other work. Cover the existing furniture with durable drop cloths and develop a schedule to minimally impact the occupants.
1.8 CUTTING AND PATCHING
A. Perform cutting necessary for the installation of the Work. Perform patching required as a consequence thereof.
1.9 SITE ADMINISTRATION
A. The Prime Contractor shall assume responsibility for the general charge of the construction and the Site until the Project is turned over to the Government.
1.10 SHOP DRAWINGS
A. Where required by individual sections, submit one copy of the Shop Drawings to the Contracting Officer for approval. The Contractor’s responsibility for errors and omission in submittals will not be relieved by the Contracting Officer’s review of submittals. Do not begin work that requires submittals until those submittals have been returned with the Contracting Officer’s signature indicating review and approval.
1.11 LAYOUT
A. Immediately locate all reference points, layout the Work, and be responsible for all measurements and other work to be executed by the Contractor under the Contract.
Exercise precautions to confirm the figures shown on the Drawings before laying out the Work. Note: The Contractor shall be responsible for any errors resulting from a failure to do so.
Construct/Maintain/Repair Various Rooms
GENERAL REQUIREMENTS 01 00 00-10
B. Verify all dimensions of existing and new work. Be responsible for their accuracy. Submit differences found to the Contracting Officer for consideration before proceeding with the Work. No extra compensation will be permitted because of differences between the actual dimensions and the measurements indicated on the Drawings.
1.12 TESTING
A. Wherever various sections of the Specifications indicate that tests are to be performed, they shall be performed at the expense of the Contractor.
1. Perform laboratory testing using an approved independent Testing Laboratory (ITL)
2. Sampling and handling shall be the responsibility of the Testing Engineer.
B. Submit certified test data results to the Contracting Officer using AF Form 3000.
C. Notify the Government 48 hours prior to testing, so that a representative of the Government may be present during testing.
1.13 TEMPORARY FACILITIES AND CONTROLS
A. Streets, Drives, and Walks:
1. Keep streets and drives clear of equipment, tools, and machinery.
2. If during the execution of this Contract it becomes necessary to obstruct any street, make necessary arrangements with the Contracting Officer’s Representative – and the Security Police – at least 48 hours in advance.
a. Keep streets and walks clear of mud and debris caused by construction operations.
b. Provide all drive and sidewalk barriers required and necessary, complete with lights for night use.
B. Provide temporary weather tight closures of openings in exterior surfaces to prevent entry of unauthorized persons. Coordinate with Security Police. Erect and maintain temporary dustproof partitions as required to prevent spread of dust, fumes, and smoke to other parts of the building. At completion of the Work, remove partitions and repair damaged surfaces to match adjacent surfaces.
C. Provide adequate sanitary toilet facilities for all workers employed on the Project. Maintain toilet facilities used by construction employees in a clean and sanitary condition and furnish necessary supplies.
D. Only store materials within the area of the Contract Limits. Do not store materials in a manner creating a nuisance or a fire or traffic hazard. Store flammable and combustible materials separately. Inside storage (project area) will be the only area for storage of materials.
E. The Contractor shall ensure that all materials and equipment are protected prior to installation and until final acceptance. Storage shall be dry, clean, and safe. Materials or
Construct/Maintain/Repair Various Rooms
GENERAL REQUIREMENTS 01 00 00-11
F. equipment that become damaged, deteriorated, rusted, or defaced due to improper storage shall be fully repaired, refinished, or replaced as directed by the Contracting Officer. Materials or equipment lost through theft or mishandling shall be replaced by the Contractor without additional cost to the Government.
G. Temporary Fire Protection: Observe all provisions of the Government safety regulations relative to fire prevention throughout the construction period. Ensure that applicable permits are visible and kept current.
H. Provide temporary safety equipment in accordance with the requirements of the Government's safety regulations.
I. Utilities:
1. Notwithstanding the provisions of other clauses of the Contract, all reasonably required amounts of water, gas, electricity, and the like, essential to the performance of the Contract, will be made available at no cost to the Contractor from existing systems, outlets, and supplies.
2. Tying into Electrical Utilities: For this entire Project, tie-ins within Government-owned components will be at no cost to the Contractor.
3. Any arrangements with the utility company – or any fees involved in tying into the distribution system owned by the utility company – are the responsibility of the Contractor. The Government will not be held responsible for interruption of utility service and will not be liable for the Contractor's delays, damages, or increased costs occasioned by such an interruption of service.
4. Temporary connections or lines shall be installed, maintained, and removed by the Contractor at no additional expense to the Government and in a manner acceptable to the Contracting Officer.
5. No water may be obtained from the fire hydrants on the Base without permission from both the Contracting Officer and the Base Fire Department.
a. Temporary water lines connected by the Contractor to hydrants on the
Base shall be equipped with reduced pressure backflow preventers.
1.14 PROJECT CLOSE-OUT
A. When the Contractor determines that the Work is complete, submit to the Contracting Officer a request (in writing) for final inspection in accordance with the terms of the Contract.
1.15 CLEANING
A. Conduct cleaning and disposal operations to comply with Federal, State EPA, and local land, air, and water laws.
B. Be responsible for seeing that the Site is kept clean at all times and that a daily cleaning is conducted. Storage shall only take place in designated areas.
C. Unless noted otherwise, all materials removed as a result of the Contractor's operations under the Contract shall become the property of the Contractor and shall be properly disposed of, reused, or recycled – away from the Base – at the expense of the Contractor.
Construct/Maintain/Repair Various Rooms
GENERAL REQUIREMENTS 01 00 00-12
D. Be responsible for final cleaning. See that the building and the Site are in a clean condition when they are turned over to the Government. At completion of the Work, the Contractor shall remove the Contractor's remaining tools, scaffolding, and surplus materials from the Site.
E. Prior to any demolition/excavation, submit a waste disposal plan for the recycling and disposal of construction waste materials and demolition debris resulting from the Work of this Contract, including:
1. A description of the waste materials and debris to be reused or recycled.
2. The proposed method of collection and transport.
3. The location of proposed disposal and recycling facilities.
4. The name, address, and telephone number for each facility and transporter.
a. If, for any applicable materials listed in Paragraph H below, recycling facilities are not available within a 100-mile radius of the Base, state that in the plan.
F. Provide all containers required to collect solid wastes collected during the performance of the Contract. At no time shall the Contractor use dumpsters or other waste receptacle maintained by the Base for the disposal of any solid wastes. Small quantities of recyclable materials, such as cardboard, metals, and wood pallets, may be placed in the recycling containers maintained by the Base. Coordinate this exception with the Base Environmental Office.
1. The dumpsters maintained by the Base are periodically checked. If it is determined that the Contractor has placed construction and/or demolition debris (other than the recyclable materials listed above) – or any other waste – in a dumpster or other solid-waste collection unit maintained by the Base, the Contractor will immediately remove said waste and dispose of it – or recycle it – properly, away from the Base.
2. If any waste is dumped in an unauthorized area, immediately remove the material and restore the area to its pre-existing condition.
G. Track the amount of construction/demolition debris and other solid waste that is disposed of under this Contract. It is preferred that the waste be tracked by weight – but tracking the waste by volume (that is, cubic yards) will also be accepted. Submit the amount of waste disposed of – and all associated weight tickets – to the Contracting Officer monthly using AF Form 3000.
H. Transport as much of the recyclable construction waste materials and demolition debris as practicable to a valid recycling facility. The recyclable materials can include:
1. Cardboard.
2. Rubble (asphalt and concrete).
3. Recycled cementitious materials (in concrete mix).
4. Brick.
5. Metals.
6. Wood.
7. Plastic.
8. Insulation.
9. Roofing.
Construct/Maintain/Repair Various Rooms
GENERAL REQUIREMENTS 01 00 00-13
10. Glass.
11. Acoustical ceiling panels.
12. Carpet.
13. Polyvinyl chloride piping.
14. R-22 refrigerant.
15. Ballasts.
16. Other materials applicable to the Project that can be reused or recycled.
I. Submit the amount of materials recycled – and all associated weight tickets – to the Contracting Officer monthly using AF Form 3000.
1.16 RECORD DOCUMENTS
A. Maintain at the Site one copy of the Drawings with redline changes.
B. At completion of the Work, deliver Record Documents to the Contracting Officer.
1. Be responsible for the preparation and furnishing of marked-up Contract Drawings including all of the Work of this Contract. Record, using colored pencil, in a neat, workmanlike manner, all cases where actual field construction differs from the Work as indicated by the Contract Documents – as well as changes in location and in elevation. Dimension concealed work and utility locations.
2. These marked-up Contract Drawings will not be acceptable as Shop Drawings.
3. Maintain these marked-up Contract Drawings at the Site as an up-to-date set of
Contract Drawings. At completion of the Work, turn this set of marked-up Contract Drawings over to the Contracting Officer for the updating of Record Drawings.
C. At completion of the Work, furnish one ccopy of a manual of information describing the products used for the Contract.
1. This manual shall serve as a reference to the products for potential maintenance and repair purposes.
2. This manual shall not supersede requirements for manuals or other information as may be stated in the submittal list and other sections of this Contract.
3. As applicable to the Contract:
a. This manual shall cover products such as:
1) Concrete.
2) Unit masonry.
3) Interior woodwork.
4) Steel studs.
5) Insulation.
6) Roofing.
7) Metal wall panels.
8) Sealants.
9) Door and door frames.
10) Windows
11) Entrance Framing System
12) Glass and Glazing
13) Gypsum board.
14) Door hardware.
Construct/Maintain/Repair Various Rooms
GENERAL REQUIREMENTS 01 00 00-14
15) Ceramic tile.
16) Folding Accordion partition
17) Paint.
Note: Do not turn containers of paint over to the Government.
18) Toilet accessories
19) Plumbing fixtures.
20) HVAC equipment.
21) Lighting components.
22) Fire detection equipment
23) Similar products.
b. This manual shall present product information such as:
1) Catalog cut sheets.
2) Manufacturer’s names.
3) Brand names.
4) Model/serial/part numbers or product types.
5) Color names/codes and the like.
6) Room number and/or location where the product was used.
4. Furnish each copy of this manual in a three-ring binder from which material can readily be removed and replaced. Clearly label the exterior spine and front cover of each binder indicating:
a. The Contract number.
b. The Project number.
c. The Project title.
d. The submittal number.
e. The contents of the binder.
1.17 PHOTOGRAPHY PERMIT
A. Prior to taking any photographs or video recordings – either for internal record or as required by the terms of the Contract – prepare a request for a photography permit, in letter format, and submit it to the Contracting Officer using AF Form 3000. The request shall indicate:
1. The Contract number.
2. The term of the Contract.
3. The locations or the Site(s) to be photographed.
4. Proposed dates and times to be accomplished.
5. Reason for photography complete with justification.
6. Whether the Contractor intends to take photographs and/or video recordings.
B. Provide a copy of any and all photographs and/or video recordings to the Government within ten calendar days of being taken, using AF Form 3000.
1. Still images shall be digital and submitted in compact disc (CD) format.
2. Video recordings shall be provided in either of the following formats:
a. Digital Versatile Disc (DVD).
Construct/Maintain/Repair Various Rooms
GENERAL REQUIREMENTS 01 00 00-15
3. Clearly label the CD, DVD, or the videocassette and the videocassette case indicating:
a. The Contract number.
b. The Project number.
c. The Project title.
d. The date taken.
PART 2 – PRODUCTS – Not Used
PART 3 – EXECUTION – Not Used
END OF SECTION 01 00 00
Construct/Maintain/Repair Various Rooms
SUBMITTAL DESCRIPTIONS 01 30 01 – 1
SECTION 01 30 01 - SUBMITTAL DESCRIPTIONS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUBMITTAL CLASSIFICATION
A. Related Documents: Other requirements pertaining to submittals are included in:
1. The CONTRACT CLAUSES.
2. SECTION 01 33 00 – SUBMITTAL PROCEDURES.
B. Submittals required by the CONTRACT CLAUSES and other non-technical parts of the
Contract are not included in this Section.
C. The submittals described below are those required and further described in other sections of the specifications.
1. Submittal Description No. 1 (SD-01) – Data: Submittals that provide calculations, descriptions, or documentation regarding the Work.
2. Submittal Description No. 2 (SD-02) – Not Used.
3. Submittal Description No. 3 (SD-03) – Not Used.
4. Submittal Description No. 4 (SD-04) – Drawings: Submittals that graphically show:
a. Relationship of various components of the Work.
b. Schematic diagrams of systems.
c. Details of fabrication.
d. Layouts of particular elements.
e. Connections.
f. Other relational aspects of the work.
5. Submittal Description No. 5 (SD-05) – Not Used.
6. Submittal Description No. 6 (SD-06) – Instructions: Preprinted materials describing installation of a product, system, or material, including special notices and material safety data sheets, if any, concerning impedances, hazards, and safety precautions.
7. Submittal Description No. 7 (SD-07) – Schedules: Tabular lists showing location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the Work.
8. Submittal Description No. 8 (SD-08) – Statements: Documents, required of the Contractor, or through the Contractor from a Supplier, Installer, Manufacturer, or other lower tier Contractor, the purposes of which is to confirm the quality or orderly progression of a portion of the Work by:
Construct/Maintain/Repair Various Rooms
SUBMITTAL DESCRIPTIONS 01 30 01 – 2
a. Documenting procedures.
b. Acceptability of methods or personnel.
c. Qualifications.
d. Other verifications of quality.
9. Submittal Description No. 9 (SD-09) – Reports: Reports of inspections or tests, including analysis and interpretation of test results. Each report shall be properly identified, signed, and dated. Test methods used shall be identified and test results shall be recorded.
10. Submittal Description No. 10 (SD-10) – Not Used.
11. Submittal Description No. 11 (SD-11) – Not Used.
12. Submittal Description No. 12 (SD-12) – Not Used.
13. Submittal Description No. 13 (SD-13) – Certificates: Statements signed by an official authorized to certify on behalf of the Manufacturer of a product, system, or material, attesting that the product, system, or material meets specified requirements. The statement shall:
a. Be dated after the award of this Contract.
b. State the Contractor’s name and address.
c. Name the Project and its location.
d. List the specific requirements that are being certified.
14. Submittal Description No. 14 (SD-14) – Samples: Samples, including both fabricated and unfabricated physical examples of materials, products, and units of the Work – as complete units or as portions of units of the Work.
15. Submittal Description No. 15 (SD-015) – Not Used.
16. Submittal Description No. 16 (SD-16) – Not Used.
17. Submittal Description No. 17 (SD-17) – Not Used.
18. Submittal Description No. 18 (SD-18) – Records: Documentation required to record compliance with technical or administrative requirements.
19. Submittal Description No. 19 (SD-19) – Operation and Maintenance Manuals: Data that forms a part of an operation and maintenance manual.
PART 2 – PRODUCTS – Not Used
PART 3 – EXECUTION – Not Used
END OF SECTION 01 30 01
Construct/Maintain/Repair Various Rooms
SUBMITTAL PROCEDURES 01 33 00 – 1
SECTION 01 33 00 - SUBMITTAL PROCEDURES
PART 1 – GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section, including
– but not limited to – the following.
1. SECTION 01 00 00 – GENERAL REQUIREMENTS: Other required submittals:
a. The Waste Disposal Plan for the recycling and disposal of waste
Republic Waste resulting from the Work under this Contract.
b. A monthly accounting of the amount of waste disposed of – and all associated weight tickets.
c. A monthly accounting of the amount of material recycled – and all associated weight tickets.
d. Marked-up Contract Drawings.
e. The Manual of Information.
f. A Request-for-Photography Permit.
g. Copies of any and all photographs and/or video recordings.
2. SECTION 01 35 43 – ENVIRONMENTAL PROCEDURES: The required detailed proposal for implementing specified requirements for environmental pollution control, including a Sediment and Erosion Control Plan.
1.2 REFERENCES
A. United States Air Force (USAF or AF) Forms: The following documents can be found at the end of this Section.
1. Schedule of Material Submittals (AF Form 66) aka "Submittal Register."
2. The Material Approval Submittal Transmittal Form (AF Form 3000).
3. The Contract Progress Schedule (AF Form 3064).
1.3 DEFINITIONS
A. Submittals requiring "Government approval":
1. "Government approval" is required for:
a. Extensions of design.
b. Critical materials.
c. Deviations.
d. Equipment whose compatibility with the entire system is required to be checked.
e. Other items as designated by the Contracting Officer.
Construct/Maintain/Repair Various Rooms
SUBMITTAL PROCEDURES 01 33 00 – 2
2. Within the terms of the Contract, submittals requiring "Government approval" are considered to be “Shop Drawings.”
B. Approved Submittals:
1. The approval of submittals by the Contracting Officer shall not be construed as a complete check, but will indicate only that the general method of construction, materials, detailing and other information are satisfactory. Approval will not relieve the Contractor of the responsibility for any error that might exist. The Contractor remains responsible for the dimensions and the design of adequate connections, details, and satisfactory construction of the Work.
2. After submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be given consideration unless accompanied by an explanation as to why a substitution is necessary.
C. Disapproved Submittals: Make all corrections required by the Contracting Officer and furnish a corrected submittal within five calendar days in the form and number of copies as specified for the initial submittal.
1. If the Contractor considers any correction indicated on the submittals to constitute a change to the Contract, give prompt notice to the Contracting Officer as required by the terms of the Contract.
PART 2 – PRODUCTS – Not Used
PART 3 – EXECUTION
3.1 GENERAL
A. Submit two copies of all items listed on the Submittal Register or specified in the other sections of the Specifications.
B. The Contracting Officer may request submittals in addition to those listed when deemed necessary to adequately describe the work covered in the respective sections.
C. Units of weights and measures used on all submittals shall be the same used on the Contract Drawings.
D. Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with the requirements of the Contract.
E. Prior to submittal, all items shall be checked and approved by the Contractor.
F. Proposed deviations from the contract requirements shall be clearly identified.
Construct/Maintain/Repair Various Rooms
SUBMITTAL PROCEDURES 01 33 00 – 3
G. Submittals shall include items as:
1. The Contractor’s, manufacturer’s, or fabricator’s drawings.
2. Descriptive literature including – but not limited to:
a. Catalog cuts.
b. Diagrams.
c. Operating charts or curves.
3. Test reports.
4. Test cylinders.
5. Samples
6. Operations and maintenance manuals (including parts list).
7. Certifications.
8. Warranties.
9. Other similar required submittals.
H. Submittals requiring Government approval shall be scheduled and made prior to the acquisition of the material or equipment covered thereby.
3.2 SUBMITTAL REGISTER
A. At the end of this Section is a Submittal Register showing – at a minimum – which submittals are required by the Specifications.
3.3 SCHEDULING
A. Submittals covering component items forming a system or items that are interrelated shall be scheduled to be coordinated and submitted concurrently.
B. Certifications that are specified to be submitted with related Shop Drawings shall be so scheduled.
C. Allow adequate time for review and approval. No delays, damages or time extensions will be allowed for time lost due to late submittals.
3.4 SUBMITTAL FORM
A. Use AF Form 3000 for submitting Government-approved submittals in accordance with the instructions on the reverse side of the form. Copies of this form will be furnished to the Contractor.
B. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and/or sheet number of the Contract Drawings pertinent to the data submitted for each item.
Construct/Maintain/Repair Various Rooms
SUBMITTAL PROCEDURES 01 33 00 – 4
3.5 SUBMITTAL PROCEDURE
A. Submittals shall be made as follows:
1 Schedule:
a. Prepare and submit to the Contracting Officer for approval, three copies of the Submittal Register found at the end of this Section.
b. The proposed schedule shall reflect the Contractor’s practicable schedule of planned dates of submittal of AF Form 3000.
c. The Submittal Register shall be submitted concurrently with the
Contractor’s submittal of the required AF Form 3064.
d. The Contracting Officer will review and return submittals received, approved or disapproved, within ten calendar days after receipt.
e. Warranties and operating instructions are required at the completion of the Work, after final inspection.
2 Deviations: For submittals that include proposed deviations requested by the Contractor, set forth in writing the reason for any deviations and annotate such deviations on the submittal. The Government reserves the right to rescind inadvertent approval of submittals containing un-noted deviations.
3.6 NOT USED
3.7 GOVERNMENT - APPROVED SUBMITTALS
A. Upon completion of review of submittals, the submittals will be identified as having received approval by being signed and dated. Two copies of the submittal will be retained by the Contracting Officer and one copy of the submittal will be returned to the Contractor to be retained at the Site.
END OF SECTION 01 33 00
AF FORM 66, 19891001 (EF-V1) PREVIOUS EDITION WILL BE USED.
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
ZQEL 19- 0016
PROJECT TITLE
Construct / Maintain/ Various Rooms
SOLICITATION/CONTRACT NUMBER
TO BE COMPLETED BY CONTRACTOR -TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE
OF SUBMITTAL
NUMBER OF COPIES REQUIRED
PL
AN
N
ED
S U
BM
IS
SI
O
N
D
AT
E
E
R
EC
EI
VE
IN
C
N
TR
AC
TI
G
E
TO
C
IV
IL
EN
IN
EE
R
ET
U
R N
S U
SP
SE
SU
BM
IT
TA
L
N U
M
BE
S
DATE
CONTRACTOR
NOTIFIED
N
TR
AC
TO
ES
U
BM
IT
TA
L
FI
AL
A
PP
R O
VA
REMARKS
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R
AW
IN
G
S
SA
M
PL
LO
R
S
EL
EC
TI
M
AN
U
FA
C
TU
R
ER
EC
C
O M
M
EN
D
AT
IO
N
S M
AN
U
FA
C
TU
R
ER
W
AR
R
TY
AL
O
G D
AT
A
O
PE
R
AT
ST
R
U C
TI
O
APPROVED
DIS-
DIVISION 01 – Gen’l Rqmts Waste Disposal Plan 01000, 11.E QA/QC Procedure
Monthly Report of Construction Debris
– Disposed of
01000, 11.G QA/QC
Report
Monthly Report of Construction Debris
– Recycled 01000, 11.I
QA/QC Report
Marked-Up Contract Drawings 01000.
12.B.3 Closeout Submittal
Manual(s) of Information
01000, 12.C Closeout Submittal
Environmental Protection Plan 01570, 1.05.A
Informational Submittal
Sediment and Erosion Plan
01570, 3.01.A.1.b
Request to Use Laser Devices
01570, 3.06.C Action Submittal
Substitution Request (if req’d)
01732, 1.03.B
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
ZQEL 19-0016
PROJECT TITLE
Construct / Maintain Various Rooms
SOLICITATION/CONTRACT NUMBER
TO BE COMPLETED BY CONTRACTOR TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
OF SUBMITTAL
NUMBER OF COPIES REQUIRED
PL
AN
N
ED
S U
BM
IS
SI
E
R
EC
EI
VE
N
TR
AC
TI
E
TO
C
IN
EE
R
U
R N
S U
SP
IT
TA
L
N U
M
BE
N
TR
AC
U
BM
IT
AL
A
PP
R O
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R
AW
IN
G
S
SA
M
LO
R
S
EL
EC
TI
U
FA
C
TU
R
ER
C
O M
M
EN
D
AT
IO
N
S M
AN
U
FA
C
TU
R
ER
R
AL
O
G D
AT
A
O
PE
R
AT
R
U C
TI
O
Request for Cutting & Alteration
01732, 1.03.C.1
Notice of Times and Dates
01732, 1.03.C.2 Informational Submittals
Demolition Procedures and Operational Sequence
01736, 1.04.A
DIV’N 02 – Site Demolition Selective Demolition
024119 1.3
DIVISION 06 – Wood, Plastics, and Composites
PLAM Samples for Selection 061000, 12 A
Wood, Plastics, and Composites
Interior Architectural Woodwork 06 40 23-1, 1.4 Product Data
Wood, Plastics, and Composites Solid Surfacing 06 65 10-2, Wood, Plastics, and Composite Solid Surfacing 06 65 10-2, Shop Drawings
DIVISION 08 – Openings Hollow-Metal
Product Data & Shop Drawings 08 11 13-, 1.2 A,B,C
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
ZQEL 19-0016
PROJECT TITLE
Construct / Maintain Various Rooms
SOLICITATION/CONTRACT NUMBER
TO BE COMPLETED BY CONTRACTOR TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
OF SUBMITTAL
NUMBER OF COPIES REQUIRED
PL
AN
N
ED
S U
BM
IS
SI
E
R
EC
EI
VE
N
TR
AC
TI
E
TO
C
IN
EE
R
U
R N
S U
SP
IT
TA
L
N U
M
BE
N
TR
AC
U
BM
IT
AL
A
PP
R O
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R
AW
IN
G
S
SA
M
LO
R
S
EL
EC
TI
U
FA
C
TU
R
ER
C
O M
M
EN
D
AT
IO
N
S M
AN
U
FA
C
TU
R
ER
R
AL
O
G D
AT
A
O
PE
R
AT
R
U C
TI
O
Openings Hollow-Metal Product Data & Shop Drawings
08 14 16-, 1.2 A,B,C
Access Doors and Panelsl Product Data & Shop Drawings
08 31 00-, 1.4,B
Exterior Aluminum Windows Product Data & Shop Drawings
08 41 13-2, 1.3 A-G
Door Hardware Product Data & Schedule 08710, 1.3.A,B
Action Submittals
Glazing Data & Schedule 08 880 00-1, 1.5.A-F
Action Submittals
DIVISION 09 – Metal Studs Product Data 092216, 1.2 A
Metal Suspension Systems Product Data 092216,
2.4 A,B,C
Gypsum Board Product Data 092900,
1.3 AB Action Submittal
Tiling Product Data 09300, 1.50. A, B, SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
ZQEL 19-0016
PROJECT TITLE
Construct / Maintain Various Rooms
SOLICITATION/CONTRACT NUMBER
TO BE COMPLETED BY CONTRACTOR TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
OF SUBMITTAL
NUMBER OF COPIES REQUIRED
PL
AN
N
ED
S U
BM
IS
SI
E
R
EC
EI
VE
N
TR
AC
TI
E
TO
C
IN
EE
R
U
R N
S U
SP
IT
TA
L
N U
M
BE
N
TR
AC
U
BM
IT
AL
A
PP
R O
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R
AW
IN
G
S
SA
M
LO
R
S
EL
EC
TI
U
FA
C
TU
R
ER
C
O M
M
EN
D
AT
IO
N
S M
AN
U
FA
C
TU
R
ER
R
AL
O
G D
AT
A
O
PE
R
AT
R
U C
TI
O
Tiling Certificates 09300, 1.50.C.1
Acoustical Panel Ceilings Samples for Verification
095123, 1.3.A.B,C
Resilient Base Manufacturers Instructions
096513, 1.3 A
Tile Carpeting Product Data 096813, 1.40.A
Painting and Coating Product Data and Schedule 099100, 1.3.A, B, C
DIVISION 10 - Signage 101400, 1.30.A,B,C
Shop Drawings, Product Data, & Samples
DIVISION 12 – Roller Shades 122123, 1.50.A,B,C,D,E.F
Shop Drawings, Product Data, & Samples
DIVISION 23 – HVAC
2301001, 1.07.A,B,C
Shop Drawings
Pipe Hangers And Supports Section 15178, 1.04.A
Shop Drawings & Product Data Submittals
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
ZQEL 19 0016
PROJECT TITLE
Construct / Maintain Various Rooms
SOLICITATION/CONTRACT NUMBER
TO BE COMPLETED BY CONTRACTOR TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
OF SUBMITTAL
NUMBER OF COPIES REQUIRED
PL
AN
N
ED
S U
BM
IS
SI
E
R
EC
EI
VE
N
TR
AC
TI
E
TO
C
IN
EE
R
U
R N
S U
SP
IT
TA
L
N U
M
BE
N
TR
AC
U
BM
IT
AL
A
PP
R O
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R
AW
IN
G
S
SA
M
LO
R
S
EL
EC
TI
U
FA
C
TU
R
ER
C
O M
M
EN
D
AT
IO
N
S M
AN
U
FA
C
TU
R
ER
R
AL
O
G D
AT
A
O
PE
R
AT
R
U C
TI
O
DIVISION 26 – Electrical Interior & Exterior Ltg. Fixtures
16511, 1.04.A
Interior & Exterior Ltg. Fixtures 16511, 1.04.B
Operation and Maintenance Data
16511, 1.04.B
Operation and Maintenance Data
16511, 1.04.C
Warranties
Raceways and Boxes
Wiring Devices
DIVISION 27 Communications 270500, 1.2.A
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
ZQEL 19 0016
PROJECT TITLE
Construct / Maintain Various Rooms
SOLICITATION/CONTRACT NUMBER
TO BE COMPLETED BY CONTRACTOR TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
OF SUBMITTAL
NUMBER OF COPIES REQUIRED
PL
AN
N
ED
S U
BM
IS
SI
E
R
EC
EI
VE
N
TR
AC
TI
E
TO
C
IN
EE
R
U
R N
S U
SP
IT
TA
L
N U
M
BE
N
TR
AC
U
BM
IT
AL
A
PP
R O
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R
AW
IN
G
S
SA
M
LO
R
S
EL
EC
TI
U
FA
C
TU
R
ER
C
O M
M
EN
D
AT
IO
N
S M
AN
U
FA
C
TU
R
ER
R
AL
O
G D
AT
A
O
PE
R
AT
R
U C
TI
O
Construct/Maintain/Various Rooms
ENVIRONMENTAL PROCEDURES 01 35 43-1
SECTION 01 35 43 - ENVIRONMENTAL PROCEDURES
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Contractor Liabilities for Environmental Protection:
1. Government installations must comply with environmental protection laws including – but not limited to the following:
a. The Clean Water Act
b. The Clean Air Act
c. The Resource Conservation and Recovery Act.
d. The Federal Facilities Compliance Act.
2. The United States Environmental Protection Agency (USEPA) has granted inspection and enforcement authority to the State of Ohio Environmental Protection Agency (Ohio EPA).
a. Inspection by either agency might include questioning of the construction personnel who are working with or have contact with hazardous materials and waste.
b. Complete – and provide documentation of – environmental training required by federal, state, and local regulations.
1.3 REFERENCES
A. The publications listed below form a part of the requirements of this Section to the extent referenced. The publications are referenced in the text using the basic designation only.
1. United States Air Force (USAF or AF) Forms: The following documents can be found at the end of SECTION 01 33 00 – SUBMITTAL PROCEDURES.
a. Material Approval Submittal (AF Form 3000).
b. Contractors Progress Reports (AF Form 3065).
2. Code of Federal Regulations (CFR):
a. 40 CFR 261: Identification and Listing of Hazardous Waste (1999).
b. 40 CFR 262: Generators of Hazardous Waste (1999).
c. 40 CFR 263: Transporters of Hazardous Waste (1999).
d. 40 CFR 264: Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities (1999).
Construct/Maintain/Various Rooms
ENVIRONMENTAL PROCEDURES 01 35 43-2
e. 40 CFR 265: Interim Status Standard for Owners and Operators of
Hazardous Waste Treatment, Storage, and Disposal Facilities (1999).
f. 40 CFR 300: National Oil and Hazardous Substances Pollution
Contingency Plan (1999).
g. 40 CFR 355: Emergency Planning and Notification (2003)
1) Appendix A: The List of Extremely Hazardous Substances and Their Threshold Planning Quantities.
h. 49 CFR 171: General Information, Regulations, and Definitions (1999).
i. 49 CFR 172: Hazardous Materials, Tables, and Hazardous Materials
Communications Regulations (1999).
j. 49 CFR 178: Shipping Container Specification (1999).
3. Corps of Engineers (COE): Safety and Health Requirements Manual (COE
EM-385-1-1 (1996)).
4. Executive Orders: Greening the Government Through Leadership in Environmental Management, 21 April 2000 (13148).
5. NFPA International: Safeguarding Construction, Alteration, and Demolition operations (NFPA 241 (2000)).
6. United States Department of Defense (USDoD) Military Standard: Requirements for the Control of Electromagnetic Interference Characteristics of Subsystems and Equipment, Revision E (MIL-STD-461E, 20 August 1999).
1.4 DEFINITIONS
A. Sediment = Soil and other debris that have eroded and have been transported by runoff water or wind.
B. Solid Waste = Rubbish, debris, garbage, and other discarded solid materials (except hazardous waste as defined in paragraph entitled "Hazardous Waste") resulting from industrial, commercial, and agricultural operations and from community activities.
C. Sanitary Wastes = Wastes characterized as domestic sanitary sewage.
D. Rubbish = Combustible and noncombustible wastes such as paper, boxes, glass, crockery, metal, lumber, cans, and bones.
E. Debris = Combustible and noncombustible wastes such as ashes and waste materials resulting from construction or maintenance and repair work, leaves, and tree trimmings.
F. Chemical Wastes = This includes salts, acids, alkalis, herbicides, pesticides, and organic chemicals.
G. Garbage = Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.
H. Hazardous Waste = Hazardous substances as defined in 40 CFR 261 or as defined by applicable state and local regulations.
Construct/Maintain/Various Rooms
ENVIRONMENTAL PROCEDURES 01 35 43-3
I. Hazardous Materials = Hazardous materials as defined in 49 CFR 171 and listed in 49
CFR 172.
J. Landscape Features = Trees, plants, shrubs, and ground cover.
K. Lead Acid Battery Electrolyte = The electrolyte substance (liquid medium) within a battery cell.
L. Oily Waste = Petroleum products and bituminous materials.
M. Class I Ozone-Depleting Substance (ODS) = Class I ODS is defined in Section 602(a) of The Clean Air Act and includes the following chemicals:
1. Chlorofluorocarbon-11 (CFC-11).
2. Chlorofluorocarbon-12 (CFC-12).
3. Chlorofluorocarbon-13 (CFC-13).
4. Chlorofluorocarbon-111 (CFC-111).
5. Chlorofluorocarbon-112 (CFC-112).
6. Chlorofluorocarbon-113 (CFC-113).
7. Chlorofluorocarbon-114 (CFC-114).
8. Chlorofluorocarbon-115 (CFC-115).
9. Chlorofluorocarbon-211 (CFC-211).
10. Chlorofluorocarbon-212 (CFC-212).
11. Chlorofluorocarbon-1, 213 (CFC-213).
12. Chlorofluorocarbon-214 (CFC-214).
13. Chlorofluorocarbon-215 (CFC-215).
14. Chlorofluorocarbon-216 (CFC-216).
15. Chlorofluorocarbon-217 (CFC-217).
16. Halon-1211.
17. Halon-1301.
18. Halon-2402.
19. Carbon tetrachloride.
20. Methyl chloroform.
N. Industrial Hygienist = A hygienist certified by the American Board of Industrial Hygiene.
1.5 SUBMITTALS
A. Statements (SD-08): Within ten calendar days after Notice-to-Proceed – and prior to commencement of the Work at the Site – submit in writing (in accordance with SECTION 01 30 01 – SUBMITTAL PROCEDURES) a detailed proposal for an Environmental Protection Program to implement requirements for the environmental pollution controls specified herein, including a Sediment and Erosion Control Plan.
1.6 Quality Assurance
A. Regulatory Requirements:
Construct/Maintain/Various Rooms
ENVIRONMENTAL PROCEDURES 01 35 43-4
1. Hazardous Waste, Spills, and Asbestos:
a. Hazardous Waste/Spill Response:
1) Unless otherwise specified in this Contract, no hazardous waste as defined in 40 CFR 261 will be generated by the Contractor; however, should the Contractor cause a hazardous material release, the Contractor shall immediately take action to stop the release and clean up the material.
A. Notify the Base Fire Department immediately if a large spill occurs.
B. The Contractor shall verbally notify the Contracting Office as soon as the leak has been stopped and cleaned up – followed by a written notification/report of the incident to the Contracting Officer within one day.
C. The Contractor shall be responsible for having adequate spill response equipment and material at the Site to clean up any hazardous material release created by the Contractor.
D. The spill residue, which includes the hazardous material, absorbent used in the clean up action, and contaminated soil, if any, will be placed in an appropriate container.
E. Replace any excavated contaminated soil with suitable fill material and return the area to its original condition, all at the Contractor's expense.
F. It shall be the Contractor's responsibility to analyze the spill residue for hazardous waste characteristics – and to dispose of accordingly.
G. Clean-up actions, hazardous waste analysis, and disposal shall be at the Contractor's expense and shall be accomplished per all applicable USEPA and OSHA requirements.
2) The Contractor will be monitored for compliance with USEPA hazardous waste requirements. Any violations of said requirements will be made known to the Ohio EPA and/or the USEPA. The Contractor shall be responsible for any fines or penalties assessed by either agency.
b. Spill Containment:
1) The Contractor shall provide secondary containment for all hazardous material containers that have a capacity greater than 30 gallons. This shall include fuels, lubricants, chemical additives, and any other material that requires a Material Safety Data Sheet
(MSDS).
2) The secondary containment units may be dikes, containment pallets, overpacks, or similar equipment that will contain a release from the primary container. Secondary containment units shall be compatible with the hazardous material. The Contractor shall
Construct/Maintain/Various Rooms
ENVIRONMENTAL PROCEDURES 01 35 43-5
ensure that rainwater does not accumulate in the secondary containment units.
2 Environmental Protection:
a. Provide and maintain, during the life of the Contract, environmental protection as defined. Plan for – and provide – environmental protective measures to:
1) Control pollution that develops during normal construction practice.
2) Correct conditions that develop during the construction of permanent or temporary environmental features associated with the Project.
b. Comply with federal, state, and local regulations pertaining to the environment, including- but not limited to – those regulating water, air, and noise pollution.
c. Class I ODS Prohibition: Class I ODS as defined and identified herein shall not be used in the performance of this Contract – nor be provided as part of the equipment. This prohibition will be considered to prevail over any other provision, specification, drawing, or referenced document.
3. Safety Program:
a. Entry: Entry into a confined or enclosed space by personnel for any purpose, including hot work, shall be prohibited until the qualified person has conducted appropriate tests to ensure the confined or enclosed space is safe for the Work intended. The following definitions apply to this Subsubparagraph only:
1) Confined Spaces (first of two parts) = Refers to spaces that by design have one or more of the following characteristics:
A. Have limited openings for entry and exit.
B. Have unfavorable natural ventilation that could contain or produce dangerous air contaminants.
C. Are not intended for continuous employee occupancy.
2) Confined Spaces (second of two parts) = Include – but are not limited to – the following:
3) Qualified Person = A person designated by the Contractor, in writing, as capable (by education or specialized training) of anticipating, recognizing, and evaluating employee exposure to hazardous substances or other unsafe conditions in a confined space. This person shall be capable of specifying necessary control and protective action to ensure worker safety. Where work involves facilities that handle combustible and hazardous materials, this qualified person shall be an NFPA -certified marine chemist.
4) Entry Permit: The Contractor shall submit for review and approval a Daily Confined Space Entry Permit at any location deemed necessary by the Contracting Officer. Complete the permit at least
Construct/Maintain/Various Rooms
ENVIRONMENTAL PROCEDURES 01 35 43-6
24 hours prior to entering a designated confined space. The permit shall be posted in a conspicuous place close to the confined space entrance with a copy furnished to the Contracting Officer.
5) Letter of Certification: Submit to the Contracting Officer a letter of certification for the qualified person.