This document is a Request for Information (RFI) regarding the air compressor specifications for a hanger renovation project. The contractor requested clarification on the type of air compressor specified, noting that a rotary screw compressor would be more appropriate than the scroll compressor listed, providing higher CFM output at a lower cost. The government response confirmed that a rotary screw compressor will be selected, with a standard-sized receiver tank. The contractor was instructed to include the recycling dryer as part of the package quote.
The related federal contract opportunity is for the "Renovate Hangar B295" project, a 100% HUBZone small business set-aside with a magnitude between $500,000 and $1,000,000. The work consists of removing the concrete mezzanine, relocating HVAC and other infrastructure, and constructing new stairs and a catwalk. The contract will be a firm-fixed price award with a 240-calendar day period of performance. The solicitation will be available on SAM.gov on 29 April 2024, with offers due by 29 May 2024 at 10:00am EDT.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION REPORT (RFI)
RFI NO. PAGE NO.
Project Number Project Title PRIME CONTRACTOR
Contractor's Request for Information
REQUESTED BY: DATE REQUESTED: Response Needed By: Potential Cost Impact
Potential Schedule Impact
RFI SUBJECT:
DRAWINGS:
INFORMATION REQUESTED:
CONTRACTOR RECOMMENDATION:
ATTACHMENTS FROM CONTRACTOR: (X attachments)
Government Response
ANSWERED BY:
TITLE:
DATE RECEIVED: DATE ANSWERED:
GOVERNMENT RESPONSE TO CONTRACTOR:
NOTE: THE RFI SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT MECHANISM FOR RESPONDING TO CONTRACTOR'S REQUESTS FOR
INFORMATION. IT DOES NOT PROVIDE AUTHORITY TO PROCEED WITH ADDITIONAL WORK. IF THE CONTRACTOR CONSIDERS
THE RFI RESPONSE A CHANGED CONDITION, PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER'S REPRESENTATIVE
IN ACCORDANCE WITH CONTRACT PROVISIONS.
QA REVIEWER'S SIGNATURE DATE
RFI FORM
| RFI NO: 01 |
| PAGE NO Page 1 of 1: 1 of 1 |
| CONTRACT NO: 24-0005 |
| CONTRACT TITLE: Hanger Renovation for J model |
| PRIME CONTRACTOR: N/A |
| Contractors Request for Information: |
| REQUESTED BY: Unknown |
| RFI SUBJECT: Air Compressor |
| DRAWINGS: P400 |
| INFORMATION REQUESTEDRow1: In the description it lists a Rotary Screw Compressor but the manufacture make and model is a Scroll Compressor. There is a big difference in price between the two. A screw compressor makes more CFM and costs less. A scroll compressor is oil free and has seals that need changed every 10,000 hours. |
And the two pieces of equipment it lists are a recycling dryer which has a much higher maintenance cost and if you’re not running the compressor 24/7 it doesn’t save you much energy. And it lists a receiver tank but does not give the size of the receiver tank.
| CONTRACTOR RECOMMENDATIONRow1: N/A |
| ATTACHMENTS FROM CONTRACTOR X attachmentsRow1: N/A |
| ANSWERED BY TITLE: Brock Elsea |
| GOVERNMENT RESPONSE TO CONTRACTORRow1: 1) Rotary screw compressor will be selected for the project. |
2) No big air surges are expected (shop air tools only). Design packaged receiver tank size on 75SCFM (Per P400 drawing) standard sizing.
3) Please include recycling dryer as part of the package quote.
| Date1_af_date: 5/17/24 |
| Text3: No |
| Text4: No |
| Date5_af_date: 5/17/24 |
| Date6_af_date: 5/21/24 |
| Date7_af_date: 5/17/24 |
| Date8_af_date: 5/17/24 |