Amendment One ZQEL 24-0005 Specification Memo.pdf

PDF 221 KB Posted

Attached to
Renovate Hangar B295
Solicitation number
FA665624B0001
Issued by

About this file

This document is an amendment to the specifications for Project 24-0005 under Solicitation Number FA665624B0001 for the Renovation of Hangar B295 at the 910 Airlift Wing (AFRC), Youngstown Air Reserve Station.

The key changes to the specifications include the complete removal of four sections and the modification of one section to remove certain submittal requirements. The cover sheet date was also updated to reflect the new specification package. The overall project consists of removing the concrete mezzanine, relocating HVAC, piping, and electrical systems, and constructing new stairs and a catwalk. The contractor will also need to build concrete pads and masonry walls for equipment relocation. This is a 100% HUBZone Small Business set-aside with a Firm-Fixed Price contract. The magnitude of the project is between $500,000 and $1,000,000, and the total contract performance period is 240 calendar days from the notice to proceed. The solicitation is available on SAM.gov, and the closing date for submission of offers is May 29, 2024 at 10:00am EDT.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

AIR FORCE RESERVE COMMAND

MEMORANDUM FOR: 910 CONF/PK

FROM: 910 MSG CE

SUBJECT: Modification to Specification for Project 24-0005

Robert Woods Chief of Design and Construction

The Modification of Specifications to project 24-0005 submitted to Contracting go as follows:

1) a total of four Sections removed completely from the Submitted Specifications-

a) 01 42 00

b) 01 45 00.00 10

c) 01 45 00.00 20

d) 01 78 24.00 20

2) A total of 1 Section Modified as a result of the removed Sections

a) 01 33 00

i) In subsection 1.1.1 Submittal Descriptions the submittal requirements below were removed

1) Baseline Network Analysis Schedule (NAS)

2) Schedule of Prices or earned Value Report

3) Work Plan

4) Quality Control (QC) plan

5) Environmental protection plan explosibe safety submission ESS work plan

3) Cover Sheet Date Modified to reflect new Specification Package.

2024-05-09T11:15:44-0400
WOODS.ROBERT.P.1230103697

Date5_af_date: 9-May-2024