RFI answers for ZQEL 19-0014 Repair Various Sidewalks Ramps and Steps.doc
DOC document 86 KB Posted
- Attached to
- Repair Various Sidewalks, Ramps, and Steps
- Solicitation number
- FA665620B0002
About this file
This document contains a federal contract opportunity solicitation for repair work at Youngstown Air Reserve Station. The solicitation is designated as a 100% HUBZone small business set-aside to be awarded as a firm-fixed price contract for a performance period of 60 calendar days from notice to proceed. Work includes installing handrails on concrete steps and between buildings, replacing concrete steps and ramps, reducing sidewalk slopes, and modifying a door for handicap accessibility. The solicitation closing date is estimated to be July 7, 2020 at 10:00 AM EDT. Interested parties should register on the Interested Vendors List at beta.sam.gov and ensure active System for Award Management registration under NAICS code 236220 by the bid opening to be eligible for award. A pre-bid site visit is scheduled for June 17, 2020.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
AIR FORCE RESERVE COMMAND
THE SITE VISIT ALLOWED FOR DISCUSSIONS BETWEEN THE GOVERNMENT AND POTENTIAL CONTRACTORS. NOTHING DISCUSSED VERBALLY AT THE SITE VISIT REGARDING GOVERNMENT FURNISHED PROPERTY, OR ANY OTHER TOPICS, CHANGES ANYTHING IN THE DRAWINGS AND SPECIFICATIONS. BIDDERS SHOULD SUBMIT BIDS BASED ON THE DRAWINGS, SPECIFICATIONS, AND THE BELOW ANSWERS TO QUESTIONS SUBMITTED ON THE RFI DOCUMENT. NOTHING DISCUSSED VERBALLY AT THE SITE VISIT OR ANY OTHER TIME PRIOR TO BID OPENING IS BINDING OR MEANT TO CHANGE THE REQUIREMENTS.
Is concrete demolition going to be allowed during normal work hours? A hammer on an excavator or skid steer will be used and they make quite a bit of noise.
Answer: All work authorized during normal base work hours of 0700 to 1700 hrs.
(Base personnel can wear ear plugs)
Sec. 26 electrical
Specifications index lists section 26 electrical, but there is not a section 26 specification included. Should there be a electrical spec section?
Answer: Specification for Section 23 and 26 seem to have been omitted when printing.
Attached are those specifications for your use.
A8
Door 219 listed in the door schedule. Is this the door that is getting modified for the new ADA ramp or was the intent to replace the door on the non ADA side of the vestibule also?
Answer: The existing aluminum outer door where the new handicap ramp is to be constructed is to be removed/modified as well as the middle section of glass (recut to new size or replace). Existing aluminum door frame to be re-installed at proposed new door height. Refer to detail 3/A4 on A4.
A8
Also for door 219 it calls out as hollow metal in the schedule. In the site visit both doors to the 219 vestibule looked to be aluminum. Please advise as what type of material they are to replaced with.
Answer: Door/Frame is Aluminum and is to be reused.