FA6656-11-B-0003-0001 Construction Solicitation Amendment2.doc

DOC document 42 KB Posted

Attached to
Maintain/Renovate Medical/Surgical Squadron - Bldg. 217 Federal contract opportunity
Solicitation number
FA6656-11-B-0003
Issued by
Department of the Air Force Reserve Command

About this file

Solicitation Amendment 2 - FA6656-11-B-0003-0002

View the file

Other files for this federal contract opportunity

Other files attached to Maintain/Renovate Medical/Surgical Squadron - Bldg. 217, newest first.
File Type Posted
Phasing Plan.pdf PDF
Q A.doc DOC document
WagesAttachment1B217- 6.3.11.docx DOCX document
Memorandum for Record - Site Visit.doc DOC document
Site Visit Sign-In Roster.pdf PDF
FA6656-11-B-0003-0001 Construction Solicitation Amendment.doc DOC document
WagesAttachment1B217- 5.20.11.docx DOCX document
Architect PDF Drawings.zip ZIP file
Drawings.zip ZIP file
FA665611B0003Atch4ResQues.doc DOC document
FA6656-11-B-0003.doc DOC document
WagesAttachment1B217.docx DOCX document
Architect Specs.zip ZIP file
MEP Specs.zip ZIP file
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

Attachment 1 - WAGE DETERMINATION (See Section I, Contract Clause 52.222-6.)

General Decision OH100003 Dated 06/03/2011, with modifications through Modification 20 dated 06/03/2011.

Attachment 2 - SPECIFICATIONS FOR THE FOLLOWING PROJECT:

USAFR ZQEL 11-0004A/B Maintain/Renovate Medical/Surgical Squadron – Bldg. 217

Dated : 9 November 2010

Attachment 3 - DRAWINGS FOR THE FOLLOWING PROJECT:

ZQEL 11-0004A/B Maintain/Renovate Medical/Surgical Squadron – Bldg. 217

(See Section I, Contract Clause 252.236-7001)

Attachment 4 – RESPONSIBILITY QUESTIONNAIRE/FINANCIAL INSTITUTION REFERENCE SHEET.

MAKE THE FOLLOWING ADDITIONS TO THE SPECIFICATIONS:

01-00-00 General Requirements - Section 1.6 - Contractor Use of the premises.

H. Phasing Plan. There is a preferred phasing plan for the building for the contractor (see Phasing Plan attachment for illustrations)The areas in pink (number 4) have to be open during each UTA for their designated use. Therefore the contractor will have roughly 30 days to get those spaces ready for use after construction is started in that area assuming construction is started immediately after any given UTA weekend. Room 140 in Area 1 must be completed before Area 2 can be started as equipment from Area 2 will be moved to that room and will be expected to be ready for use upon movement of that equipment. Work in Room 132 and Room 131 may be accomplished during the timeframe that Area 4 (Pink area) is under construction or during the timeframe that Area 2 is under construction (Green area) depending on the Contractors preference. However, there are no changes to the phasing plan, but be advise it will be subject to change due to mission requirements.

07-41-13 Metal Roof Panels – Section 1.10 - Warranty B.2. Provide a no dollar limit (NDL) total system performane warranty from a single source for 20 years for insulation, membrane, flashing, and miscellaneous materials, including coverage for damage from winds up to 72 MPH.

(End of Summary of Changes)