Attach. 5 QJKL 24-9991D Submittal Register.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
AMXS Office Remodel, B821 Federal contract opportunity
Solicitation number
FA663324Q0001
Issued by
Department of the Air Force Headquarters Secretary of the Air Force

About this file

This document package includes a submittal register and request for quote for an AMXS office remodel project. The submittal register outlines required documentation for items like construction waste management plans, product data on materials, and closeout documentation. The RFQ seeks a firm-fixed price quote to maintain the AMXS Office Area B821 at the 934th Airlift Wing in Minneapolis, Minnesota in accordance with the statement of work, specifications, drawings, and solicitation terms. Quotes are due by the date specified in block 13 of the SF1442 and must be submitted using that form along with applicable fill-in clauses. The award will be made to the lowest price technically acceptable offer. The period of performance is 120 days from notice to proceed. The wage determination is for Hennepin County, Minnesota.

View the file

Other files for this federal contract opportunity

Other files attached to AMXS Office Remodel, B821, newest first.
File Type Posted
QandA for RFQ B821 AMXS.docx DOCX document
Attach. 4 2024026 Wage Determination.pdf PDF
Attach. 1 QJKL 24-9991D SOW.pdf PDF
Attach. 2 QJKL 24-9991D Specifications.pdf PDF
Attach. 3 QJKL 24-9991D Design Drawings.pdf PDF
Solicitation - FA663324Q0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
AMXS OfficeCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A G R A P HCLASSIFICATION
GOVERNMENT OR A/E REVIEWCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
01 11 00SD-01 Preconstruction Submittals
Entry Authorization Request1.4FIO
01 14 00SD-01 Preconstruction Submittals
List of Contact Personnel1.2.1.1FIO
01 32 16.00 20SD-01 Preconstruction Submittals
Initial Project Schedule1.1.3G
Periodic Schedule Update1.1.4G
01 33 00SD-01 Preconstruction Submittals
Submittal Register1.7G
01 74 19SD-01 Preconstruction Submittals
Construction Waste Management1.6G
Plan
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
AMXS OfficeCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
01 74 19SD-11 Closeout Submittals
Final Construction Waste1.9G
Diversion Report
01 78 00SD-03 Product Data
Warranty Management Plan1.4.1FIO
SD-08 Manufacturer’s Instructions
Instructions1.4.1FIO
SD-11 Closeout Submittals
As-Built Drawings3.1G
09 29 00SD-03 Product Data
Gypsum Board2.1.1FIO
Asbestos Free Materials2.1FIO
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
AMXS OfficeCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
09 68 00SD-04 Samples
Carpet2.1G
SD-11 Closeout Submittals
Warranty1.4FIO
09 90 00SD-03 Product Data
Coating2.1G
Product Data Sheets2.1FIO
SD-04 Samples
Color2.2G
SD-07 Certificates
Indoor Air Quality for Paints and1.5.4FIO
Primers
Manufacturer's Safety Data1.7.1FIO
Sheets
26 05 00.00 40SD-03 Product Data
Conduits and Raceways2.1.1G
Wire and Cable2.2.1G
Splices and Connectors3.1.5G
Switches2.2.3G
Receptacles2.2.4G
Outlet Boxes, Pull Boxes and2.1.3G
Junction Boxes
SUBMITTAL REGISTERCONTRACT NO.
TITLE AND LOCATION
AMXS OfficeCONTRACTOR
A C T I V I T Y
N OT R A N S M I T T A L
N OS P E C
S E C TDESCRIPTION ITEM SUBMITTEDP A R A

G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W

N RCONTRACTOR: SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITYMAILED TO CONTR/
DATE RCD FRM APPR AUTHREMARKS
SUBMITAPPROVAL NEEDED BYMATERIAL NEEDED BYA C T I O N
C O D EDATE OF ACTIONDATE FWD TO APPR AUTH/
DATE RCD FROM CONTRDATE FWD TO OTHER REVIEWERDATE RCD FROM OTH REVIEWERA C T I O N
C O D EDATE OF ACTION
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
26 05 00.00 40Device Plates2.2.2G
SD-06 Test Reports
Continuity Test3.2G
Ground-Fault Receptacle Test3.2G
27 10 00SD-03 Product Data
Telecommunications cabling2.3G
Telecommunications2.5G
outlet/connector assemblies
Connector blocks2.4.1G