RFI 1 BEFORE AWARD - Government Response.pdf
PDF 251 KB Posted
- Attached to
- Repair Barrel Roof, Hangar 9
- Solicitation number
- FA660625R0005
About this file
This document is a Request for Information (RFI) report for a roofing repair project at Hangar 3 & 9, with contract number FA660625R0002/0005, issued by RBT Roofing on 31 July 2025. The RFI contains five key technical clarification questions and corresponding government responses regarding roof specifications, including: 1) confirmation of existing concrete deck slope (assumed 1/4" per foot), 2) insulation system requirements (sloped insulation at crickets, saddles, and drain sumps), 3) fall protection system manufacturer (Guardian is the only approved brand), 4) roof drain assembly (full roof drains are required), and 5) stair tower access (two separate stairs are mandatory, one on each side of the building for government access to flat roofs).
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION REPORT (RFI)
RFI NO. PAGE NO.
Page 1 of
CONTRACT NO. CONTRACT TITLE PRIME CONTRACTOR
Contractor's Request for Information
REQUESTED BY: DATE REQUESTED Potential Cost Impact
[No] Potential Schedule
Impact [No]SUBCONTRACTOR
RFI
SUBJECT:
DRAWINGS
INFORMATION REQUESTED:
ATTACHMENTS FROM CONTRACTOR: (1 attachment)
Question:
Response:
NOTE: THE RFI SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT MECHANISM FOR RESPONDING TO CONTRACTOR'S REQUESTS FOR
INFORMATION. IT DOES NOT PROVIDE AUTHORITY TO PROCEED WITH ADDITIONAL WORK. IF THE CONTRACTOR CONSIDERS
THE RFI RESPONSE A CHANGED CONDITION, PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER'S REPRESENTATIVE
IN ACCORDANCE WITH CONTRACT PROVISIONS.
QA REVIEWER'S SIGNATURE DATE
RFI FORM
FA660625R0002/0005 Repair Roof, Hangar 3 & 9
RBT Roofing 31 July 2025
Question:
Question:
Question:
Question:
Response:
Response:
Response:
Response:
1 BEFORE AWARD
What is the existing slope of the structural concrete deck on the lower adjacent roofs, if there is any slope?
Existing concrete deck is believed to be sloped. The slope is assumed at 1/4" per foot.
A fully tapered insulation system is not required for the lower concrete deck roofs, correct?
Just crickets, saddles, and drain sumps?
A fully tapered insulation system is not required. Sloped insulation is required at crickets, saddles and drain sumps - see A-101.
Is Guardian the only brand we can utilize for the fall protection system or is the government open to an approved equal manufacturer/ installer?
Yes, Guardian is the required manufacturer. The Government is not open to an approved equal.
Can retrofit roof drains be an acceptable alternative to full roof drain assembly requested or is the government set on full drain assembly replacements?
Full roof drains are required.
Are two separate stair towers required for access or can one tower be utilized and dismantled and reassembled as needed?
Two separate stairs are required. One on each side of the building for Government access to the flat roofs.
| 2025-08-04T14:13:05-0400 | |
| RUSSELL.KRISTIN.ELIZABETH.1363331170 |
File details come from the government source that posted it. Updated .