RFI 01_Repair Chiller_2025.06.18.pdf
PDF 258 KB Posted
- Attached to
- Repair Chiller, Bldg. 1850
- Solicitation number
- FA660625B0001
About this file
This document is a Request for Information (RFI) for the Repair Chiller, Bldg. 1850 project, with solicitation number FA660625B0001 issued by the Department of the Air Force Reserve Command. The RFI focuses on clarifying technical specifications for a chiller repair project, specifically addressing the operational status of ball valves for shutoff and isolation at each chiller outside in the enclosure. The RFI contains one specific question from the contractor regarding whether the ball valves are to be motorized or manually operated, to which the government response clearly states that all shutoff valves are to be manual operation. The document is dated 06.18.2025 and is designed to provide an efficient mechanism for responding to contractor information requests, with a note emphasizing that the RFI does not authorize additional work without proper contract provisions.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION REPORT (RFI)
RFI NO. PAGE NO.
SOLICITATION TITLE
Contractor's Request for Information
REQUESTED BY: DATE REQUESTED: Potential Cost Impact
[No] Potential Schedule
Impact [No]SUBCONTRACTOR
RFI
SUBJECT:
DRAWINGS
INFORMATION REQUESTED:
ATTACHMENTS FROM CONTRACTOR: (1 attachment)
NOTE: THE RFI SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT MECHANISM FOR RESPONDING TO CONTRACTOR'S REQUESTS FOR
INFORMATION. IT DOES NOT PROVIDE AUTHORITY TO PROCEED WITH ADDITIONAL WORK. IF THE CONTRACTOR CONSIDERS
THE RFI RESPONSE A CHANGED CONDITION, PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER'S REPRESENTATIVE
IN ACCORDANCE WITH CONTRACT PROVISIONS.
QA REVIEWER'S SIGNATURE DATE
RFI FORM
SOLICITATION NO.
FA660625B0001 REPAIR CHILLER, BLDG. 1850
06.18.2025
QUESTION 01:
Please clarify if the “ball valves for shutoff and isolation at each chiller outside in the enclosure” are to be motorized or manual operation.
WARB RESPONSE 01:
All shutoff valves are manual operation.
| 2025-06-18T08:42:25-0400 | |
| BOISCLAIR.DANIEL.F.1390586686 |