Westover ARB James Street Gate 10153G

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 62 35 RECYCLED / RECOVERED MATERIALS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 40 00 COLD-FORMED METAL FRAMING

05 50 14 STRUCTURAL METAL FABRICATIONS

05 72 00 DECORATIVE METAL SPECIALTIES

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 31 13 ASPHALT SHINGLES

07 60 00 FLASHING AND SHEET METAL

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 34 02 BULLET-RESISTANT COMPONENTS

08 71 00 DOOR HARDWARE

08 91 00 METAL WALLANDDOOR LOUVERS

DIVISION 09 - FINISHES

09 29 00 GYPSUM BOARD

09 65 00 RESILIENT FLOORING

PROJECT TABLE OF CONTENTS Page 1

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 12 - FURNISHINGS

12 36 00 COUNTERTOPS

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 23 00 REFRIGERANT PIPING

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 32 14.00 10 DIESEL-GENERATOR SET, STATIONARY 15-300 KW, STANDBY

APPLICATIONS

26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH

26 41 00.00 20 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 31 16 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 23.00 20 PAVEMENT MARKINGS

32 31 13 CHAIN LINK FENCES AND GATES

DIVISION 33 - UTILITIES

33 11 00 WATER DISTRIBUTION

33 40 00 STORM DRAINAGE UTILITIES

33 71 02.00 20 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 26 PAGES

Westover ARB James Street Gate

01 11 00 SD-01 Preconstruction Submittals 1.10.1Utility Outage Requests 1.10.1Utility Connection Requests

01 30 00 SD-01 Preconstruction Submittals

1.4.1 GList of contact personnel

SD-04 Samples

1.2 GColor boards

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals 1.6Accident Prevention Plan (APP)

SD-06 Test Reports 1.10Reports 1.10.1Accident Reports

SD-07 Certificates 1.7Confined Space Entry Permit 1.7Hot work permit

01 57 20.00 10 SD-01 Preconstruction Submittals

1.7 GEnvironmental Protection Plan

01 74 19 SD-01 Preconstruction Submittals

1.6 G ROWaste Management Plan

SD-11 Closeout Submittals 1.7Records

01 78 00 SD-03 Product Data 1.3.2As-Built Record of Equipment and Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 26 PAGES

01 78 00 1.7.1Warranty Management Plan 1.7.5Warranty Tags 1.9Final Cleaning 1.4Spare Parts Data

SD-08 Manufacturer’s Instructions 1.5Preventative Maintenance 1.5Condition Monitoring (Predictive

Testing) 1.5Inspection 1.7.1Instructions

SD-10 Operation and Maintenance Data

1.8Operation and Maintenance Manuals

SD-11 Closeout Submittals 1.3.1Record Drawings

02 41 00 SD-01 Preconstruction Submittals

1.7 GExisting Conditions

SD-07 Certificates

1.2.1 GDemolition Plan

03 30 00 SD-03 Product Data 2.4.7Materials for curing concrete 2.4.10Joint sealants 2.4.9Joint filler 2.4.1Cement 2.4.1.4Portland Cement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 26 PAGES

03 30 00 2.3.2Ready-Mix Concrete 2.4.6Vapor retarder and Vapor barrier 2.6Bonding Materials 2.7Floor Finish Materials 2.5Reinforcement

SD-05 Design Data 2.3.1mix design

SD-06 Test Reports 1.6.1.1Concrete mix design 1.6.1.2Fly ash 1.6.1.2Pozzolan 1.6.1.3Ground granulated blast-furnace slag 3.10.2.3Compressive strength tests 3.10.2.4Air Content 2.8.4Slump 2.8.1Air Entrainment

SD-08 Manufacturer’s Instructions 1.6.1.2Fly ash 1.6.1.3Ground granulated blast-furnace slag 1.9Welding Procedures 1.9Welding Procedures 2.5.6Steel Bar 1.9Welder Qualifications

04 20 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 26 PAGES

04 20 00 1.4.4 GDetail Drawings SD-05 Design Data

1.2.1.1 GUnit Strength Method

SD-06 Test Reports

3.23.3 GEfflorescence Test

3.23.1 GField Testing of Mortar

3.23.2 GField Testing of Grout

SD-07 Certificates 2.2Clay or Shale Brick 2.7Anchors, Ties, and Bar

Positioners 2.11Expansion-Joint Materials 2.8Joint Reinforcement 2.5.3Masonry Cement 2.5.1Admixtures for Masonry Mortar 2.6.1Admixtures for Grout 1.4.2Contamination

SD-08 Manufacturer’s Instructions 2.5.3Masonry Cement

05 12 00 SD-02 Shop Drawings 1.4.1Fabrication drawings

SD-03 Product Data 2.4Shop primer 2.3.1Welding electrodes and rods 2.3.2Non-Shrink Grout

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 26 PAGES

05 12 00 2.4Class B coating 2.2Bolts, nuts, and washers

SD-07 Certificates 2.1Steel 2.2Bolts, nuts, and washers 2.5Galvanizing 1.4.2.1Welding procedures and qualifications 05 40 00 SD-02 Shop Drawings

1.6.1Framing Components SD-03 Product Data

2.1studs, joists SD-07 Certificates

1.4Load-bearing cold-formed metal framing

3.1.1Welds 05 50 14 SD-02 Shop Drawings

1.3.2Detail Drawings SD-03 Product Data

2.2.2.1Welding of Structural Steel 2.3.4Structural Steel Welding Repairs 2.1.2Materials Orders 2.1.3Materials List 2.1.4Shipping Bill

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 26 PAGES

05 50 14 2.3Tests, Inspections, and Verifications

SD-07 Certificates 1.3.1Qualification of Welders and

Welding Operators 2.2.2.3Application Qualification for Steel

Studs 06 20 00 SD-02 Shop Drawings

1.3Detail Drawings SD-07 Certificates

1.4Certificates of grade 1.4Certificates of compliance

06 61 16 SD-02 Shop Drawings

3.1 GInstallation

SD-03 Product Data 2.1Solid polymer material 1.4.1Qualifications 2.3Fabrications

SD-04 Samples

2.1 GMaterial

SD-06 Test Reports 2.1Solid polymer material

SD-07 Certificates 2.3Fabrications 1.4.1Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 26 PAGES

06 61 16 SD-10 Operation and Maintenance Data

3.2Clean-up 07 21 16 SD-03 Product Data

2.1Blanket insulation SD-08 Manufacturer’s Instructions

3.3.1Insulation 07 31 13 SD-03 Product Data

2.1.1Shingles SD-04 Samples

2.1.1 GShingles

SD-08 Manufacturer’s Instructions

3.3Application 07 60 00 SD-02 Shop Drawings

3.1.4 GGutters

3.1.5 GDownspouts

2.1.1 GSoffit Panels

07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops

SD-07 Certificates 3.3.6Sealant

08 11 13 SD-02 Shop Drawings

2.1 GDoors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 26 PAGES

08 11 13 2.1 GDoors

2.4 GFrames

2.4 GFrames

SD-03 Product Data

2.1 GDoors

2.4 GFrames

08 34 02 SD-02 Shop Drawings

3.3 GInstallation

SD-03 Product Data 1.4Bullet-resistant Components

SD-07 Certificates 1.4Bullet resistant Components

SD-10 Operation and Maintenance Data

1.4 GBullet Resistant Components

08 71 00 SD-02 Shop Drawings

1.2Hardware schedule SD-10 Operation and Maintenance Data

1.2Hardware Schedule 08 91 00 SD-02 Shop Drawings

1.4Wall louvers 1.5Wall louvers 2.2Wall louvers

09 29 00 SD-03 Product Data 2.1.3Cementitious backer units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 26 PAGES

09 29 00 2.1.2Impact Resistant Gypsum Board 2.2Fiberglass Reinforced Panels 2.1.6Accessories

SD-07 Certificates

2.1 GAsbestos Free Materials

09 65 00 SD-02 Shop Drawings

2.7 GResilient Flooring and

Accessories SD-03 Product Data

2.7 GResilient Flooring and

Accessories

2.3Adhesives SD-04 Samples

2.7 GResilient Flooring and

Accessories

SD-06 Test Reports

3.3 GMoisture, Alkalinity and Bond

Tests SD-08 Manufacturer’s Instructions

3.2 GSurface Preparation

3.1 GInstallation

SD-10 Operation and Maintenance Data

2.7 GResilient Flooring and

Accessories

09 90 00 SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 26 PAGES

09 90 00 1.3Applicator's qualifications SD-08 Manufacturer’s Instructions

3.8.2Mixing 1.6.2Manufacturer's Material Safety

Data Sheets 10 28 13 SD-03 Product Data

2.1.2 GFinishes

2.2 GAccessory Items

SD-04 Samples

2.1.2 GFinishes

2.2 GAccessory Items

SD-07 Certificates 2.2Accessory Items

10 44 16 SD-01 Preconstruction Submittals 2.1Manufacturer's Data

SD-02 Shop Drawings 2.1Fire Extinguishers 2.4Accessories 2.5Wall Brackets

SD-03 Product Data 2.1Fire Extinguishers 2.4Accessories 2.5Wall Brackets 3.2.1Replacement Parts

SD-07 Certificates 2.1Fire Extinguishers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 26 PAGES

10 44 16 2.1Manufacturer's Warranty with Inspection Tag

12 36 00 SD-02 Shop Drawings 2.3Fabrication 3.1Installation Drawings

SD-03 Product Data 2.3Synthetic resin 2.2Fasteners 2.5Accessories and Hardware

SD-04 Samples 2.3Countertop 2.3Backsplash, 2.5Accessories and Hardware 2.1Manufacturer's Standard Color

Charts SD-07 Certificates

2.2Fasteners 2.5Accessories and Hardware

SD-08 Manufacturer’s Instructions 2.1Manufacturer's Instructions

22 00 00 SD-02 Shop Drawings 3.8.1Plumbing System

SD-03 Product Data 2.4Fixtures 2.4.2Flush tank water closets 2.4.3Wall hung lavatories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 26 PAGES

22 00 00 2.8Water heaters 3.8.1.1Backflow prevention assemblies 1.5.1Welding 3.4Vibration-Absorbing Features 3.8.1Plumbing System

SD-06 Test Reports 3.8Tests, Flushing and Disinfection 3.8.1.1Test of Backflow Prevention

Assemblies SD-07 Certificates

1.3Materials and Equipment 2.1.1Bolts

SD-10 Operation and Maintenance Data

3.8.1Plumbing System 23 00 00 SD-02 Shop Drawings

1.4.5Detail Drawings SD-03 Product Data

2.9.1.1Ceiling Exhaust Fans 1.4.6Test Procedures 1.2.1.2Diagrams

SD-06 Test Reports 3.9Performance Tests

SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation

Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 26 PAGES

23 00 00 3.11.2Operation and Maintenance Training

SD-10 Operation and Maintenance Data

3.11.1Operation and Maintenance Manuals

2.9.1.1Ceiling Exhaust Fans 23 05 93 SD-01 Preconstruction Submittals

1.2TAB team field leader 1.2TAB team engineer 1.2TAB team assistants 1.5.1Independent TAB Agency and

Personnel Qualifications SD-06 Test Reports

3.5.1TAB Work Execution Schedule 3.5.1TAB Procedures Summary 3.5.1Design Review Report 3.5.1TAB Report for Season 1

SD-07 Certificates 3.5.1Completed season 1 Pre-TAB

Work Checklist 23 07 00 SD-02 Shop Drawings

3.2.2.4MICA Plates 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 26 PAGES

23 07 00 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems

SD-04 Samples 2.2.1.3Thermal Insulation

SD-08 Manufacturer’s Instructions 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems

23 23 00 SD-02 Shop Drawings 2.3Refrigerant Piping System

SD-03 Product Data 2.3Refrigerant Piping System 1.3.1Qualifications 3.4Refrigerant Piping Tests 3.1Verification of Dimensions

SD-06 Test Reports 3.4Refrigerant Piping Tests

SD-07 Certificates 2.1Service Organization

SD-10 Operation and Maintenance Data

1.5Maintenance 3.2.4.3Operation and Maintenance

Manuals 23 82 02.00 10 SD-02 Shop Drawings

1.4Drawings SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 26 PAGES

23 82 02.00 10 2.1Materials and Equipment 1.6Spare Parts 3.4Posted Instructions 3.1Verification of Dimensions 2.7.1.1Coil Corrosion Protection 3.6System Performance Tests 3.4Demonstrations

SD-06 Test Reports 3.5Refrigerant Tests, Charging, and

Start-Up 3.6System Performance Tests

SD-07 Certificates 2.1Materials and Equipment 2.1.1Service Organization

SD-10 Operation and Maintenance Data

3.4Operation and Maintenance Manuals

26 20 00 SD-02 Shop Drawings

2.12 GPanelboards

SD-03 Product Data

2.11 GReceptacles

2.12.3 GCircuit breakers

2.9 GSwitches

2.18 GSurge protective devices

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 26 PAGES

26 20 00 3.4.2 G600-volt wiring test

3.4.4 GGrounding system test

3.4.3 GGround-fault receptacle test

SD-07 Certificates

2.10 GFuses

26 32 14.00 10 SD-02 Shop Drawings

1.4.4 GDetailed Drawings

3.10 GAcceptance

SD-03 Product Data 2.4Manufacturer's Catalog 1.4.2Experience 1.4.3Field Engineer 3.2General Installation 3.1Site Visit

SD-05 Design Data

2.8 GSound Limitations

2.14Generator 2.5.4Integral Main Fuel Storage Tank 3.6.2.2Power Factor 2.7.2Heat Exchanger 2.18.5Time-Delay on Alarms 2.7Cooling System 1.2.5Vibration Isolation

SD-06 Test Reports 3.6.6Performance Tests

3.6 GOnsite Inspection and Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 26 PAGES

26 32 14.00 10 SD-07 Certificates 1.2.5Vibration Isolation 3.4Prototype Tests 1.2.6Reliability and Durability 2.11Emissions 2.8Sound limitations 2.14.1Current Balance 2.3Materials and Equipment 2.27Factory Inspection and Tests 3.6.4Inspections 2.7Cooling System

SD-10 Operation and Maintenance Data

1.6.1Operation Manual 1.6.2Maintenance Manual 1.6.3Extra Materials

26 36 00.00 10 SD-02 Shop Drawings 1.3.1Detail Drawings 2.1Equipment 3.1Installation

SD-03 Product Data 2.1Material 2.1Equipment

SD-06 Test Reports

2.5 GTesting

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 26 PAGES

26 36 00.00 10 2.1Equipment 2.1Material 1.3.2Switching Equipment

SD-10 Operation and Maintenance Data

1.3.2Switching Equipment 3.2Instructions

26 41 00.00 20 SD-02 Shop Drawings

1.4.1 GOverall lightning protection

system

1.4.1 GEach major component

SD-06 Test Reports

3.4.1 GGrounding system test

3.4.2 GLightning protection system

inspection SD-07 Certificates

1.4.2 GUL listing or label

26 51 00 SD-03 Product Data

2.1Fluorescent lighting fixtures 1.5.1Fluorescent Electronic Ballasts 2.1.2Fluorescent Lamps

2.5EMERGENCY LIGHTING

EQUIPMENT

26 56 00 SD-02 Shop Drawings

1.4.1.1 GLuminaire drawings

1.4.1.2 GPoles

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 26 PAGES

26 56 00 SD-03 Product Data

2.2 GLuminaires

2.3 GLighting contactor

2.4 GTime switch

2.5 GPhotocell switch

2.6.1 GAluminum poles

2.7Brackets 1.6.2Energy Efficiency

SD-05 Design Data

1.4.2 GDesign Data for luminaires

31 00 00 SD-01 Preconstruction Submittals 3.4Shoring 1.7Dewatering Work Plan

SD-06 Test Reports 3.16Testing

SD-07 Certificates 3.16Testing 3.16Testing 3.16Testing

31 31 16 SD-03 Product Data 2.1Termiticides 3.1Verification of Measurement 3.4.1Application Equipment 1.5Warranty

SD-04 Samples 2.1Termiticides

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 26 PAGES

31 31 16 SD-06 Test Reports 3.4.1Equipment Calibration and Tank

Measurement 1.4.1Soil Moisture 1.2Quality Assurance 1.2.1Qualifications

32 11 23 SD-03 Product Data 1.6Plant, Equipment, and Tools 1.7Waybills and Delivery Tickets

SD-06 Test Reports 1.4Sampling and Testing 1.4.2.4Field Density Tests

32 12 10 SD-06 Test Reports 3.7Sampling and Testing

32 12 16 SD-03 Product Data 2.3Mix Design 3.10Contractor Quality Control 3.11Material Acceptance and Percent

Payment SD-04 Samples

2.2Asphalt Cement Binder 2.1Aggregates

SD-06 Test Reports 2.1Aggregates 3.10.3.10QC Monitoring

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 26 PAGES

32 12 16 2.2Asphalt Cement Binder 3.6Testing Laboratory

32 16 13 SD-03 Product Data 2.1Concrete

SD-06 Test Reports 3.8Field Quality Control

32 17 23.00 20 SD-03 Product Data 2.1.2Reflective media for roads and streets 2.1.1Paints for roads and streets 2.1.3Thermoplastic compound 3.2.2.3Thermoplastic compound 1.5Equipment 1.8Qualifications

SD-06 Test Reports 2.1.2Reflective media for roads and streets 2.1.1Paints for roads and streets 2.1.3Thermoplastic compound 3.2.2.3Thermoplastic compound

SD-07 Certificates 2.1.2Reflective media for roads and streets 2.1.1Paints for roads and streets 3.5.2Volatile Organic Compound 2.1.3Thermoplastic compound

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 26 PAGES

32 17 23.00 20 3.2.2.3Thermoplastic compound 1.5Construction equipment list

SD-08 Manufacturer’s Instructions 2.1.1Paints for roads and streets 2.1.3Thermoplastic compound 3.2.2.3Thermoplastic compound

32 31 13 SD-02 Shop Drawings 1.3Erection/Installation Drawings 1.3Fence Assembly 3.14.1location of corner, end, 3.14.1pull posts 1.3Accessories 1.3Accessories

SD-03 Product Data 1.3Fence Assembly

SD-04 Samples 2.3Fabric 2.4Fabric 3.7Fabric 2.5Posts 2.5Braces 2.6Line Posts 2.8Sleeves 2.10Bottom Rail 2.12Tension Wire 3.14.2Tension Wire

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 26 PAGES

32 31 13 2.13Stretcher Bars 1.3Accessories 1.3Accessories 2.17Wire Ties

SD-07 Certificates 1.5.1Zinc Coating 2.2Zinc Coating 2.12Zinc Coating 2.3Fabric 2.4Fabric 3.7Fabric 2.13Stretcher Bars 1.3Accessories 1.3Accessories 2.18Concrete 3.4Concrete

SD-08 Manufacturer’s Instructions 1.3Fence Assembly 1.3Hardware Assembly 1.3Accessories 1.3Accessories

33 11 00 SD-03 Product Data 2.1.1Piping Materials 2.1Water distribution main 2.2Water service line 2.1.2.4Hydrants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 26 PAGES

33 11 00 2.1.2.5Indicator posts 2.2.2.1Corporation stops 2.1.2.6Valve boxes 2.2.2.9Valve boxes

SD-06 Test Reports 2.2.2.12Disinfection

SD-07 Certificates 2.1Water distribution main 2.2Water service line 2.1.1.1Lining 2.1.1.2Lining 2.1.2.4hydrants 2.2.2.11Displacement Type Meters

SD-08 Manufacturer’s Instructions 1.4Delivery, storage, and handling 3.1.1Installation

33 40 00 SD-03 Product Data 3.3Placing Pipe

SD-04 Samples 2.1Pipe for Culverts and Storm

Drains SD-07 Certificates

2.1.3Resin Certification 3.8Pipeline Testing 2.7Hydrostatic Test on Watertight

Joints

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 26 PAGES

33 40 00 3.7.5Determination of Density 2.3.6Frame and Cover for Gratings

33 82 00 SD-02 Shop Drawings

1.5.1.1 GTelecommunications Outside

Plant

1.5.1.2 GTelecommunications Entrance

Facility Drawings SD-03 Product Data

2.7 GWire and cable

2.2.1 GBuilding protector assemblies

SD-06 Test Reports

3.4.1 GPre-installation tests

3.4.2 GAcceptance tests

1.5.3 GOutside Plant Test Plan

SD-07 Certificates

1.5.2.1 GTelecommunications Contractor

1.5.2.2 GKey Personnel

1.5.2.3 GManufacturer's Qualifications

SD-08 Manufacturer’s Instructions

2.2.1 GBuilding protector assembly

installation

3.1.5.1 GCable tensions

3.1.6.2 GFiber Optic Splices

SD-09 Manufacturer’s Field Reports

2.12.1 GFactory Reel Test Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 26 PAGES

33 82 00 SD-10 Operation and Maintenance Data

1.5.1.1 GTelecommunications outside

plant (OSP)

SD-11 Closeout Submittals

1.7.1 GRecord Documentation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SECTION 01 11 00

SUMMARY OF WORK

08/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E2114 (2008) Standard Terminology for Sustainability Relative to the Performance of Buildings

1.2 DEFINITIONS

Definitions pertaining to sustainable development are as defined in ASTM E2114, Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION, and as specified.

a. "Environmentally preferable products" have a lesser or reduced effect on the environment in comparison to conventional products and services. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.

b. "Indoor environmental quality" is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal comfort, daylighting, and views.

c. "Operational performance" is the functional behavior of the building as a whole or of the building components.

d. "Sustainability" is the balance of environmental, economic, and societal considerations.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Upon receipt of Government Furnished Equipment, the Contractor shall submit records in accordance with paragraph entitled, "Government Furnished Property," of this section.

Submit the following items to the Contracting Officer:

SECTION 01 11 00 Page 1

Utility Outage Requests Utility Connection Requests

1.4 WORK COVERED BY CONTRACT DOCUMENTS

1.4.1 Project Description

The work includes the demolition of the existing gatehouse at the James Street Entrance and construction of a new gatehouse of similar size and new entry canopy. The new gatehouse structure will have a similar footprint as the existing structure being replaced. The new gatehouse will be configured so that it meets all applicable Air Force security and force protection standards and requirements to protect assigned personnel and resources. The entry complex requires a gate properly sited within a controlled area of the base with a support facility capable of withstanding attack or ballistic impact by vehicle or small arms fire. Access roads must be capable of controlling peak traffic flows while safely rejecting non-authorized vehicles. An area for searching vehicles is required with adequate area lighting and suitable protection from the elements.

1.4.2 Location

The work shall be located on James Street on the Westover Air Reserve Base, Chicopee, Massachusetts. The exact location will be shown by the Contracting Officer.

1.5 CONTRACT DRAWINGS

The following drawings accompany this specification and are a part thereof.

General, Civil, Architectural, Structural, Mechanical, Plumbing,and Electrical Drawings.

Two sets of full size contract drawings, maps, and specifications will be furnished to the Contractor without charge. Reference publications will not be furnished.

Contractor shall immediately check furnished drawings and notify the Government of any discrepancies.

1.6 WORK RESCHEDULING

Contractor shall allow for a maximum of 7 calendar days where construction activity is prohibitive. Further allowance for 5 calendar days of excavation and subsurface activity abeyance shall be imposed where other construction activities are permitted. Government will provide 24 hour notification each time the restrictions are invoked.

Normal duty hours for work shall be from 7:30 a.m. to 4:15 p.m., Monday through Friday. Requests for additional work shall require written approval from the Contracting Officer 7 days in advance of the proposed work period.

SECTION 01 11 00 Page 2

1.7 PROJECT ENVIRONMENTAL GOALS

Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, construction, and operation is to produce a building that meets the functional program needs and incorporates the principles of sustainability. Specifically:

a. Preserve and restore the site ecosystem and biodiversity; avoid site degradation and erosion. Minimize offsite environmental impact.

b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.

c. Use environmentally preferable products and decrease toxicity level of materials used.

d. Use renewable energy and material resources.

e. Optimize operational performance (through commissioning efforts) in order to ensure energy efficient equipment operates as intended.

Consider the durability, maintainability, and flexibility of building systems.

f. Manage construction site and storage of materials to ensure no negative impact on the indoor environmental quality of the building.

g. Reduce construction waste through reuse, recycling, and supplier take-back.

1.8 OCCUPANCY OF PREMISES

Before work is started, the Contractor shall arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.9 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.

1.10 ON-SITE PERMITS

1.10.1 Utility Outage Requests and Utility Connection Requests

Submit Air Force Land Disturbance Form 103 to the Contracting Officer at least 30 days prior to starting excavation work. Contractor is responsible for marking and verifying all utilities not marked.

SECTION 01 11 00 Page 3

The Contractor shall verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated or specified to be removed. But indicated in locations to be transversed by piping, ducts, and other work to be installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

Work shall be scheduled to hold outages to a minimum.

Utility outages and connections required during the prosecution of work that affect existing systems shall be arranged for at the convenience of the Government and shall be scheduled outside the regular working hours or on weekends.

Requests for utility outages and connections shall be made in writing to the Contracting Officer at least 30 calendar days in advance of the time required. Each request shall state the system involved, area involved, approximate duration of outage, and the nature of work involved.

1.10.2 Borrow, Excavation, Welding, and Burning Permits

Permits shall be posted at a conspicuous location in the construction area.

Burning of trash or rubbish is not permitted.

1.11 LOCATION OF UNDERGROUND FACILITIES

Obtain digging permits prior to start of excavation by contacting the Contracting Officer 30 calendar days in advance. Scan the construction site with Ground Penetrating Radar and electromagnetic or sonic equipment, and mark the surface of the ground, pier deck or paved surface where existing underground utilities or utilities encased in pier structures are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated to be specified or removed but indicated or discovered during scanning in locations to be traversed by piping, ducts, and other work to be conducted or installed.

Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.11.1 Notification Prior to Excavation

Notify the Contracting Officer at least 30 days prior to starting excavation work.

1.12 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT

Pursuant to Contract Clause "FAR 52.245-2, Government Property (Fixed Price Contracts)", the Government will furnish no materials or equipment for installation by the Contractor.

1.13 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged shall remain the property of the Government.

The salvaged property shall be segregated, itemized, delivered, and off-loaded at the Government designated storage area.

SECTION 01 11 00 Page 4

Contractor shall maintain property control records for material or equipment designated as salvage. Contractor's system of property control may be used if approved by the Contracting Officer. Contractor shall be responsible for storage and protection of salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 5

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

02/10

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List of contact personnel; G

SD-04 Samples

Color boards; G

1.2 COLOR BOARDS FOR AIR FORCE PROJECTS

Submit five sets of color boards within 90 calendar days after Contract Award. Each set of boards shall include samples of colors and finishes of interior surfaces, such as walls, floors, and ceilings. The samples shall be presented on 8 by 10-1/2 inches boards (modules) with a maximum spread of 24 by 31-1/2 inches for foldouts. Modules shall be designed to fit in a standard loose-leaf, three-ring binder. Where special finishes such as architectural concrete, carpet, or prefinished textured metal panels are required, samples not less than 12 inches square shall be submitted with the board. If more space is needed, more than one board per set may be submitted. The Contractor shall certify that he has reviewed the color samples in detail and that the color samples are in strict accordance with contract drawings and specifications, except as may be otherwise explicitly stated. Submittal of color samples shall not relieve the Contractor of the responsibility to submit samples required elsewhere herein.

1.3 MINIMUM INSURANCE REQUIREMENTS

Procure and maintain during the entire period of performance under this contract the following minimum insurance coverage:

a. Comprehensive general liability: $500,000 per occurrence

b. Automobile liability: $200,000 per person, $500,000 per occurrence for bodily injury, $20,000 per occurrence for property damage

c. Workmen's compensation as required by Federal and State workers' compensation and occupational disease laws.

d. Employer's liability coverage of $100,000, except in States where workers compensation may not be written by private carriers,

e. Others as required by Massachusetts law.

SECTION 01 30 00 Page 1

1.4 CONTRACTOR PERSONNEL REQUIREMENTS

1.4.1 Subcontractors and Personnel

Furnish a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.4.2 Identification Badges

Identification badges, if required, will be furnished without charge.

Application for and use of badges will be as directed. Immediately report instances of lost or stolen badges to the Contracting Officer.

1.4.3 Subcontractor Special Requirements

1.4.3.1 Asbestos Containing Material

All contract requirements of Asbestos Containing Materials" assigned to the Private Qualified Person (PQP) shall be accomplished directly by a first tier subcontractor.

1.4.4 Contractor Personnel Requirements

Failure to obtain entry approval will not affect the contract price or time of completion.

1.4.5 Personnel List

Submit for approval, at least 15 days prior to the desired date of entry, an original alphabetical list of personnel who require entry into Government property to perform work on the project. Furnish for each person:

a. Name

b. Date and place of birth

c. Citizenship

d. Home address

e. Social security number

f. Naturalization number

The request for personnel passes shall be accompanied with the following certification:

"I hereby certify that all personnel on this list are either born U.S.

citizens, naturalized U.S. citizens with the naturalization number shown , or legal aliens with the alien registration number indicated."

Signature/Firm Name

1.4.6 Citizenship Requirements

Will not be admitted to the work site without approval. Aliens are not

SECTION 01 30 00 Page 2 allowed on the project site.

1.4.7 Documents Acceptable for Proof of Citizenship

a. Birth registration card

b. Certificate of live birth, birth certificate

c. Certificate of Naturalization

d. Certificate of registration

e. DD-214 (Must Cite Birthplace)

f. DD Form 4 (Contract for Enlistment and Must Cite Birthplace)

g. DD 1966 (Application for Enlistment)

h. Military discharge papers (must cite birthplace)

i. Delayed birth certificate

j. Hawaii certificate of foreign birth

k. Hospital birth certificate

l. Marriage license certificate

m. Merchant marine certificate

n. Military officer ID card

o. Notification of birth registration

p. State of Hawaii ID card

q. USA passport

r. Verbal inquiry with State of Hawaii Vital Statistics Office

1.4.8 Passes

Submit request for personnel and vehicle passes together. Include the Certificate of Insurance for Contractor and Subcontractor(s) and the Statement of Acknowledgement Form SF 1413 with the submittal. Passes will normally be issued within 21 days.

1.4.9 Control

Maintain strict accountability over passes. Immediately report to the source of issue, passes missing or lost and the circumstances. If the Contractor has another active contract or one commencing immediately, employees' names may be transferred from one contract to the other. Final payment will not be effected until employees are transferred to another contract or the records are cleared. Furnish a signed letter, countersigned by the source of issue, stating that passes have been turned in.

SECTION 01 30 00 Page 3

1.5 SUPERVISION

Have at least one qualified supervisor capable of reading, writing, and conversing fluently in the English language on the job site during working hours. In addition, if a Quality Control (QC) representative is required on the contract, then that individual shall also have fluent English communication skills.

1.6 PRECONSTRUCTION CONFERENCE

After award of the contract but prior to commencement of any work at the site, meet with the Contracting Officer to discuss and develop a mutual understanding relative to the administration of the value engineering and safety program, preparation of the schedule prices, shop drawings, and other submittals, scheduling programming, prosecution of the work, and clear expections of the "Interim DD Form 1354" Submittal. Major subcontractors who will engage in the work shall also attend.

1.7 ELECTRONIC MAIL (E-MAIL) ADDRESS

The Contractor shall establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments in Microsoft, Adobe Acrobat, and other similar formats. Within 10 days after contract award, the Contractor shall provide the Contracting Officer a single (only one) e-mail address for electronic communications from the Contracting Officer related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The Contracting Officer may also use email to notify the Contractor of base access conditions when emergency conditions warrant, such as hurricanes, terrorist threats, etc. Multiple email address will not allowed.

It is the Contractor's responsibility to make timely distribution of all Contracting Officer initiated e-mail with its own organization including field office(s). The Contractor shall promptly notify the Contracting Officer, in writing, of any changes to this email address.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 30 00 Page 4

SECTION 01 33 00

SUBMITTAL PROCEDURES

05/11

PART 1 GENERAL

1.1 DEFINITIONS

1.1.1 Submittal Descriptions (SD)

Submittals requirements are specified in the technical sections.

Submittals are identified by Submittal Description (SD) numbers and titles as follows:

SD-01 Preconstruction Submittals

Submittals which are required prior to or commencing work on site.

Certificates of insurance

Surety bonds

List of proposed Subcontractors

List of proposed products

Construction Progress Schedule

Network Analysis Schedule (NAS)

Submittal register

Schedule of prices

Health and safety plan

Work plan

Quality Control(QC) plan

Environmental protection plan

SD-02 Shop Drawings

Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.

Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.

Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.

SD-03 Product Data

Catalog cuts, illustrations, schedules, diagrams, performance charts, SECTION 01 33 00 Page 1 instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.

Samples of warranty language when the contract requires extended product warranties.

SD-04 Samples

Fabricated or…