Attachment 2 - Ali Al Salem AB General Paving Standards Specs
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Airfield & Base Pavement
Specifications for
ALI AL SALEM AIR BASE
KUWAIT
Prepared by:
386 ECES/CEC
November 2011
Ali Al Salem AB Paving
Attachment 2 FA5703-13-R-0004
TABLE OF CONTENTS
DIVISION 01 GENERAL REQUIREMENTS Page No.
01 11 00 Summary of Work 6
01 31 13 Project Coordination 8
01 32 19 Submittals Schedule 10
01 35 43 Environmental Procedures 15
01 42 19 Reference Standards 18
01 45 00 Quality Control 21
01 52 00 Construction Facilities 22
01 55 26 Traffic Control 23
01 77 00 Contract Closeout 25
Appendices: A. AF Form 3000 (required by sec. 1.02.B) 26
B. Schedule of Material Submittals, AF Form 66 28
DIVISION 02 SITE WORK Page No.
02 41 00 Demolition 31
DIVISION 31 EARTHWORK Page No.
31 23 01 Excavation and Subgrade Preparation 35
31 23 23.33 Controlled Low Strength Material (flowable fill) 47
DIVISION 32 EXTERIOR IMPROVEMENTS Page No.
32 01 16.71 Cold-milling of Asphalt Pavement 50
32 01 19.62 Patching of Rigid Pavement 52
32 11 23 Aggregate Base Course 62
SECTION 01 31 13
PROJECT COORDINATION
32 12 00.01 Flexible Paving (roads) 65
32 12 00.02 Flexible Paving (airfield) 72
32 12 36.01 Asphalt Slurry Seal Coat 88
32 12 36.02 Asphalt Sealer / Rejuvenator 93
32 12 36.03 Preservative Seal for Asphalt Concrete 95
32 12 36.04 Crack Sealing Bituminous Pavement 98
32 12 36.19 Coal Tar Seal Coat with Unvulcanized Rubber 104
32 12 36.20 Coal Tar Sealer / Rejuvenator 108
32 12 74 Flexible Pavement Reinforcement Fabric 110
32 13 00.01 Rigid Paving (roads) 112
32 13 00.02 Rigid Paving (airfield) 120
32 13 73.01 Sealing and Resealing Joints for Concrete Pavements 140
Attachment 2 FA5703-13-R-0004
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 6
01 31 13 Project Coordination 8
01 32 19 Submittals Schedule 10
01 35 43 Environmental Procedures 15
01 42 19 Reference Standards 18
01 45 00 Quality Control 21
01 52 00 Construction Facilities 22
01 55 26 Traffic Control 23
01 77 00 Contract Closeout 25
Appendices: A. AF Form 3000 (required by sec. 1.02.B) 26
B. Schedule of Material Submittals, AF Form 66 28
Ali Al Salem AB
SECTION 01 11 00
SUMMARY OF WORK
SUMMARY OF WORK
PART 1 - GENERAL
1.01 SECTION INCLUDES:
A. Work covered by contract documents.
B. Use of premises.
C. Utilities.
D. “As-Built” Drawings (Record Drawings).
1.02 WORK COVERED BY CONTRACT DOCUMENTS:
A. The following is a summary of work at Ali Al Salem AB, Kuwait. The project shall include, but is not limited to furnishing of all design, labor, equipment and related materials for site preparation, excavation, and backfill.
B. The above description of work is for the purpose of general information only and is not intended to include and describe every feature or item of work or to define the scope of work.
1.03 USE OF PREMISES:
A. During the entire Contract performance period, the installation and facilities will be occupied. Coordinate and cooperate with the using personnel in scheduling operations to minimize conflict and to facilitate government usage.
B. All job sites and work areas shall be kept clean and orderly throughout the performance of the Contract. All materials shall be secured to prevent damage to surrounding areas in the event of inclement weather, especially high winds.
1.04 UTILITIES:
A. Water, gas, and electricity will be furnished to the Contractor by the Government from the Government's existing system outlets. Utilities will be furnished at no cost to the
Contractor, except for telephone.
1.05 RECORD DRAWINGS
A. Government Provided Drawings. The contractor shall maintain records regarding “as-built” conditions. Upon completion of each Contract, where drawing files (electronic or paper) were provided to the Contractor, the Contractor shall provide “as-built” drawing files to the Contracting Officer. The drawing files shall be provided in the same format as originally provided (electronic files accepted when available).
Ali Al Salem AB
SUMMARY OF WORK
B. Contractor Provided Drawings. Digital design files developed by the Contractor as a bid item shall be maintained in an “as-built” condition during the life of the Contract. Upon completion of the Contract, the Contractor shall provide both paper copies and the digital
“as-built” drawing files to 386 ECES/CEC in the specified file format.
C. Maintain at the job site at least one set of full size contract drawings, marking in red to show all variations between the construction actually provided and the requirements indicated or specified in the contract documents, including buried or concealed construction.
END OF SECTION
PROJECT COORDINATION
A. Coordination
B. Administrative and Supervisor Personnel
C. General Installation Provisions
D. Call Response Time
1.02 COORDINATION:
Coordinate construction activities included under various sections to assure efficient and orderly installation of each component. Coordinate operations included under different sections that are dependent on each other for proper installation and operation.
A. Where installation of one component depends on installation of other components, before or after its own installation, schedule activities in the sequence required to obtain the best results.
B Where space is limited, coordinate installation of different components to assure maximum accessibility for maintenance, service, and repair.
C. Make provisions to accommodate items scheduled for later installation.
D. Prepare memoranda for the Contracting Officer and separate Contractors where coordination of their work is required.
1.03 ADMINISTRATIVE PROCEDURES
Coordinate scheduling and timing of administrative procedures with other construction activities to avoid conflicts and ensure orderly progress of work. Such administrative activities include the following:
A. Preparation of Schedules B. Coordinating Ali Al Salem AB military escort availability C. Installation and Removal of Temporary Facilities D. Delivery and Processing of Submittals E. Project Close-out Activities
1.04.1 WORK SCHEDULE:
Working hours for the contractor will normally be between the hours of 8:00 a.m. and
5:00 p.m. excluding Sundays. If the contractor desires to work during periods other than above, additional government inspections and escort forces will be required. The contractor must make his/her request to the contracting officer four days in advance of his/her intention to work during other periods to allow for assignment of additional inspection and escort forces. The Contracting Officer shall determine, at his/her discretion, whether such inspection and escort forces are available and whether work will be allowed on a non-scheduled day. The Contracting Officer may authorize the
Contractor to perform work during periods other than normal duty days/hours; however, it will be the contractor’s responsibility to procure temporary base passes for the periods of work outside of normal operating hours and, if inspectors or escorts are required to perform in excess of their normal duty solely for the benefit of the Contractor, the actual cost of inspection at overtime rates may be charged to the contractor. These adjustments to the contract price may be made periodically as directed by the Contracting Officer. In addition to the above requirements, the contractor is required to provide the construction inspector with a weekly schedule and report indicating the elements of work that are scheduled for the following week. This schedule will be used by the inspector for arranging escorts and for any coordination with the using agency. This weekly schedule and report will be provided at least 5 days prior to implementation.
1.04.2 CONSTRUCTION PERMITS: BASE CIVIL ENGINEER WORK CLEARANCE
REQUEST (AF FORM 103), “DIGGING PERMIT.”
A. PERMITS:
The 386 ECES/CEC will complete work clearances (AF Form 103) approvals for paving projects prior to the contractor starting any work.
B. UTILITY STAKING REQUIREMENTS:
The contractor shall layout and mark his intended utility routing before calling for field coordination by utility personnel. This shall be done a minimum of five working days in advance of when digging is expected to begin. Once all responsible utility representatives have field located crossover and/or interference points between the new utility route and existing utilities, they will sign off on the digging permit to signify completion of the field coordination of the digging permit. The permit must then be presented to Civil Engineering Construction Inspector for final coordination before digging in the area represented by the digging permit may begin.
Any utility service markers or markings established by the utility representatives must be maintained by the contractor through the completion of the digging operations. Contractor shall remove all flags incidental to work when complete.
C. DIGGING OPERATIONS:
Digging near established interference or crossover points shall be done by hand, five (5) feet either side of the point along the intended route, in order to prevent disturbing the existing utility.
If the existing utility is uncovered in the new excavation, it shall be protected from damage and movement while in the open excavation and during backfill. The contractor shall be responsible for the repairs and associated costs for repairs of any utility damaged by construction, whose location was made known to the contractor.
D. UTILITY OUTAGES:
1. Any utility outages (gas, electricity, and water) requested by the Contractor shall be submitted in writing no less than fifteen (10) calendar days prior to the proposed outage.
2. The Government reserves the right to reschedule the Contractor's proposed outage if deemed necessary.
3. In the event utility outages cannot be performed on any facility due to critical operation impact, the utility outages and any related work shall be performed on non-duty hours.
4. The Contractor shall notify the Base Fire Department prior to shutdown of any utilities to a facility.
1.05 CALL RESPONSE TIME: Calls being made against this CONTRACT will be categorized by the severity of the work that is required. The categories and response times are as follows:
A. CONTRACT: Response time for a Contract shall be determined by the QAP before the call is made. The time allowed will be based on design requirements and perceived call cost. If after reviewing the Contract, the contractor feels the prescribed time is not adequate, the contractor has two business days to contact the QAP and request a response time adjustment;
B. WARRANTY CALL: Calls placed against discrepancies that occur during the warranty period of a call shall be resolved within three business days;
C. EMERGENCY CALL: Calls declared as emergencies shall be responded to within 24 hours and resolved within 48 hours.
SECTION 01 32 19
SUBMITTALS SCHEDULE
A. Submittal Procedures.
B. Proposed “Or Equal” Products and Materials
C. Samples
D. Certificates
E. Equipment Data Submittals
F. Material Furnished Under Standard Specifications.
1.02 SUBMITTAL PROCEDURES
A. The Contractor shall fill in the REQUIRED SUBMISSION DATE column on the attached
AF Form 66, Schedule of Material Submittals provide schedule to the Contracting Officer not later than 7 calendar days after the Notice to Proceed. Update the required submission date column as the project progresses. Prior to incorporating a particular item into the work, the submittal for that item must be approved.
B. Submittal Preparation: Place each submittal on an AF Form 3000 for identification.
Submittals are to be provided in at least 4 copies, signed by the prime contractor. The
Government will retain 2 copies and return the others.
1. Submittal Transmittal: Package each submittal appropriately for transmittal and handling. Transmit each submittal from the Contractor to Contracting Officer using an
AF Form 3000. The Contracting Officer will not accept submittals received from sources other than the Contractor.
2. On the transmittal, record relevant information and requests for data. On the form, or separate sheet, record deviations from Contract Document requirements, including variations and limitations. Include Contractor's certification that information complies with Contract Document requirements.
C. Processing: To avoid the need to delay installation as a result of the time required to process submittals, allow sufficient time for submittal review, including time for resubmittals.
1. Allow 2 weeks for initial review. Allow additional time if the Contracting Officer must delay processing to permit coordination with subsequent submittals.
2. Allow 2 weeks for reprocessing each submittal.
3. No extension of Contract Time will be authorized because of failure to transmit submittals to the Contracting Officer sufficiently in advance of the Work to permit processing.
D. Government’s review will be limited to determination if submittals are in conformance with design concept and general requirements of the project. Approval by the Government shall not absolve the Contractor from his/her responsibilities for specific performance of the item or items submitted.
E. Submittals shall be accepted only from the Contractor (not sub-contractor or material supplier), who shall check submittals for completeness, accuracy for construction purposes, and conformance with contract requirements and shall indicate his/her concurrence on each submittal.
F. Unless otherwise specified, submittals for a specific product/material make, model, formula, etc., will be required only upon first use under the provisions of the contract, not for each subsequent Contract issued. In addition to the above requirements, the contractor is required to provide the construction inspector with a weekly schedule and report indicating the elements of work that are scheduled for the following week. This schedule will be used by the inspector for arranging escorts and for any coordination with the using agency. This weekly schedule and report will be provided at least 5 days prior to implementation.
1.03 PROPOSED “OR EQUALS” PRODUCTS/MATERIALS:
A. Submit proposed “Or Equals” Products/Materials to the Contracting Officer within 20 calendar days after the date of Notice to Proceed is issued.
B. Submit proposed “Or Equals” Products/Materials relating to a particular subcontract or trade at one time.
C. List the following information:
1. Proposed item(s).
2. Product Data, and all information required to determine suitability of the proposed product.
3. Impact on other work.
4. Additional information as requested by the Contracting Officer.
D. Approval or rejection of “Or Equals” Products/Materials is at the Contracting Officer's discretion, whose judgment will be final. Factors for acceptability of proposed substitutions are as follows:
1. Cost difference.
2. Quality of materials, structural strength, and details of construction or fabrication.
3. Performance and function.
4. Appearance and finish.
5. Impact on other work shall be identified.
E. Do not resubmit any previously rejected proposed “Or Equal Product/Material.
F. Use of approved “Or Equals” Products/Materials does not relieve the Contractor from compliance with the Contract Documents.
G. If “Or Equals” Products/Materials are installed without prior approval, the Contractor may be required to remove the unauthorized materials and install those indicated or specified, at no additional cost to the Government. Product data includes standard printed information on materials, products and systems: not specially prepared for each Contract, other than the designation of selections from available choices printed therein. Including, but not limited to printed information such as manufacturer’s installation instructions, catalog cuts, assembly details and standard color samples. Include the following information: Manufacturer’s printed recommendations, Compliance with recognized trade association standards, Compliance with recognized testing agency standards, Notation of dimensions verified by field measurement.
1.04 SAMPLES:
A. Field Samples specified in individual Sections are special types of Samples. Field Samples are full-size examples erected on site to illustrate finishes, coatings, or finish materials and to establish the standard by which the Work will be judged.
B. Comply with submittal requirements to the fullest extent possible. Process transmittal forms to provide a record of activity. Include the following:
1. Sample source
2. Product name or name of manufacturer
3. Compliance with recognized standards
C. Preliminary Submittals: Where samples are for selection of color, pattern, texture, or similar characteristics from a range of standard choices, submit a full set of choices for the material or product. Mark each copy to show applicable choices and options.
D. Where printed Product Data includes information on several products, some of which is not required, mark copies to indicate the applicable information.
1.05 SHOP DRAWINGS:
A. When required by individual specification sections, submit the number of opaque reproductions, which the Contractor requires, plus three (3) copies, which will be retained by the Government.
B. Shop drawings shall be prepared by persons competent and experienced in the trade involved.
Drafting skill is not a requirement but accuracy and completeness of Drawings shall reflect field measurements and conditions and shall show the relationship of the item to adjacent materials.
C. “Shop Drawings” are defined as drawings, diagrams, illustrations, schedules, performance charts, brochures and other data prepared by the Contractor or any subcontractor, manufacturer, supplier, or distributor, which illustrates how specific portions of the work shall be fabricated and/or installed.
D. Shop drawings are not part of the contract documents. Contract documents are prepared under the guidance of the design professional. Shop drawings by long standing tradition in the construction industry are usually prepared by trades’ people who are not registered architects or engineers.
E. The purpose of shop drawings is not to depict or define design but it is to show how the construction document or requirements are to be implemented.
1.06 CERTIFICATES:
A. Each certificate required by the Contract Documents shall be signed by an officer, agent, or individual lawfully authorized to execute the certificate and such authority shall be cited in the certificate by description, title, or other acceptable evidence.
B. Certificates shall be sworn and notarized as to correctness and validity of the contents, and copies shall be notarized to be true copies. Deliver all certificates to the Contracting
Officer.
1.07 EQUIPMENT DATA SUBMITTALS:
A. Equipment data submittals, including complete technical, performance, and catalog data, are required for every mechanical and electrical equipment item proposed for the Work, each submittal bound, indexed, and containing information and data as specified in
Section 01300.
B. Each submittal shall include information covering performance and operating curves, ratings, capacities, characteristics, power efficiency, each manufacturer's standard guarantees and warranties with the terms and conditions fully described, and all other information to fully illustrate and describe the items as may be specified or required for approval.
C. Submit in sets, which cover complete systems of functioning units.
1.08 MATERIALS FURNISHED UNDER STANDARD SPECIFICATIONS: For various materials specified by reference to standard or reference type specifications, prepare and submit a list of such materials stating manufacturer's name and identifications to extent requested by the
Contracting Officer.
PART 2 – PRODUCTS – NOT USED
PART 3 - EXECUTION
3.01 SUBMITTALS AND TECHNICAL DATA:
A. Unless otherwise specified, furnish submittals in four (4) copies. The Contracting Officer will return One (1) signed and dated copy to the Contractor after approval or disapproval.
B. Materials incorporated into the work prior to approval from the Contracting Officer are at the Contractor’s risk. He/she may be required to remove and replace them with approved materials at his/her own expense.
C. Data for operational test reports and commercial warranty and/or guarantee shall be furnished in one (1) copy only.
D. Submittals requested on Air Force Form 66: C, E, F, G, H, I
a. Procedures (D.O. Specific)
b. Proposed "Or Equal" Products/Materials (D.O. Specific)
c. Samples (One approval for all D.O.’s)
d. Construction Progress Schedules (D.O. Specific)
e. Shop Drawings (D.O. Specific)
f. Product Data (One approval for all D.O.’s)
g. Certificates (One approval for all D.O.’s)
h. Manufacturers' Detailed Instructions (One approval for all D.O.’s)
i. Materials Furnished under Standard Specifications (One approval for all D.O.’s)
SECTION 01 35 43
ENVIRONMENTAL PROCEDURES
ENVIRONMENTAL PROCEDURES
A. Applicable Regulations
B. Protection of Land Resources
C. Restoration of Landscape Damage
D. Post-Construction Cleanup or Obliteration
E. Spillage
F. Disposal
G. Protection of Fish and Wildlife
H. Hazardous Materials
I. Permits
1.02 APPLICABLE REGULATIONS:
In order to prevent and to provide for abatement and control of any environmental pollution arising from the construction activities of the Contractor and his subcontractors in the performance of this contract, they shall comply with the applicable Federal, State, and local laws and regulations concerning environmental pollution control and abatement in effect on the date.
1.03 PROTECTION OF LAND RESOURCES:
It is intended the land resources within the project boundaries of work performed under this contract be preserved in their present condition or be restored to a condition after completion of construction that will appear to be natural and not detract from the appearance of the project.
Insofar as possible, the Contractor shall confine his activities to areas defined by the plans and specifications.
1.04 RESTORATION OF LANDSCAPE DAMAGE
Any trees or other landscape feature scarred or damaged by the Contractor’s equipment or operations shall be restored as nearly as possible to its original condition at the Contractor’s expense. The Contracting Officer will decide what method of restoration shall be used and whether damaged trees shall be treated and healed or removed and replaced.
1.05 POST-CONSTRUCTION CLEANUP OR OBLITERATION
A. The Contractor shall obliterate all signs of temporary construction facilities such as haul roads, work areas, structures, foundations of temporary structures, stockpiles of excess or
ENVIRONMENTAL PROCEDURES
waste materials, or any vestiges of construction resulting from this contract as directed by the Contracting Officer.
B. Protection of Natural Resources. The Contractor shall not pollute the air, streams, lakes, wetlands, or reservoirs with fuels, oils, bitumen, calcium chloride, painting materials, acids, or other harmful materials. It is the responsibility of the Contractor to investigate and comply with all applicable Federal, State, county, and municipal laws concerning pollution of rivers and streams. All work under this contract shall be performed in such a manner that objectionable conditions will not be created in the air or water systems through or adjacent to the project area.
1.06 SPILLAGE:
At all times of the year, special measures shall be taken to prevent paints, chemicals, fuels, oils, grease, etc., from being spilled and particularly from entering surface or groundwater. In the event of a paint, fuel, oil, or chemical spill the Contractor shall immediately take containment measures to prevent the spill from migrating and/or entering the base drainage system. The
Contractor must contact the Base Environmental Management Division immediately after initial containment is started. Spill residue shall be disposed of in areas designated by the Contracting
Officer or his Contracting Officer representative.
1.07 DISPOSAL:
Under no circumstances shall excavated soil or other materials be removed from base property.
Where materials have been excavated but will not be reused, the contractor shall coordinate with
386 ECES/CEC for authorized disposal locations. If excavated materials have been deemed contaminated, containment and disposal shall be in accordance with procedures determined by the Base Environmental Management Division. Disposal (such as discharge, deposit, dumping, spilling, leaking, or placing) of an materials, wastes, effluent, trash, garbage, oil, grease, paints, chemicals, etc., in areas other than designated disposal sites is prohibited. If any waste material is dumped in unauthorized areas, the Contractor shall remove the material and restore the area to the conditions of the adjacent undisturbed area. Contaminated ground shall be excavated, disposed of as directed by the Contracting Officer or 386 ECES/CEC, and replaced with suitable fill material, compacted and finished with topsoil all at the expense of the Contractor.
1.08 PROTECTION OF FISH AND WILDLIFE:
The Contractor shall perform all work and take such steps required to prevent any interference or disturbance to fish and wildlife. The Contractor shall not be permitted to alter water flow or otherwise disturb native habitat adjacent to the project area which in the opinion of the
Contracting Officer are critical to fish and wildlife. Fouling or pollution of water shall not be permitted. Wash waters and wastes shall be processed, filtered, ponded, or effectively treated prior to their release into any body of water.
1.09 HAZARDOUS MATERIAL:
The Contractor shall comply with all local, State, and Federal laws pertaining to the protection of the environmental and emission of hazardous pollutants in the performance of this contract. The
Contractor shall also provide a copy to 386 ECES/CEC and the Base Environmental Management
ENVIRONMENTAL PROCEDURES
Division of all correspondence with Kuwait and US Air Force, pollution control authorities relative to this contract.
1.10 HAZARDOUS MATERIAL HANDLING:
The contractor shall store, handle, use and manage hazardous and potentially hazardous materials in accordance with the following regulations, manuals, instructions and Executive
Orders: Air Force Joint Manual (AFMAN) 23-210, Executive Order (EO) 12856.
1.11 PERMITS:
A. The Contractor shall apply for and obtain the following permits as applicable:
1. Earth Moving.
2. Disposal of Hazardous Materials.
3. Welding. (contact Ali Al Salem Fire Department @ 9938-9713 to obtain AF form 592)
4. Digging. (attachment 1)
B. The Contractor shall be responsible for payment of any fees associated with acquiring the required permits and should reflect those costs in his/her bid proposal.
SECTION 01 42 19
REFERENCE STANDARDS
REFERENCE STANDARDS
A. Applicability of Reference Standards.
B. Provision of Reference Standards at site.
C Source and acronyms used for Reference Standards in Contract Documents.
1.02 APPLICABILITY OF REFERENCE STANDARDS:
A. For products or workmanship specified by association, trade, or Federal Standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.
B. The publications listed in the various specification sections form a part of the specification to the extent referenced. The publications are referred to in the text by basic designation only.
C. Use the latest standard, except when a specific date is specified.
D. Disregard payment provisions contained in any portion of the referenced specifications and standards.
1.03 PROVISION OF REFERENCE STANDARDS AT SITE: When required by individual
Specifications sections, maintain a copy of the standard. When requested by the government, the contractor shall provide a copy of applicable standards to a Contract within 24 hours.
1.04 SOURCE FOR REFERENCE STANDARDS:
ACI American Concrete Institute
Box 19150
Detroit, MI 48219
Corps of Engineers Safety and Health Requirement Manual, EM385-1-1
AISC American Institute of Steel Construction
One E. Wacker Dr., Suite 3100
Chicago, IL 60601
AITC American Institute of Timber Construction
11818 SE Mill Plain Blvd., Suite 407
Vancouver, WA 98684
REFERENCE STANDARDS
ANSI American National Standards Institute
11 West 42nd St.
New York, NY 10036
APA American Plywood Association
S7011 South 19th Street
P.O. Box 11700
Tacoma, WA 98411-0700
ASME American Society of Mechanical Engineers
22 Law Dr., Box 2300
Fairfield, NJ 07007-2300
ASTM American Society of Testing and Materials
1916 Race Street
Philadelphia, PA 19103
CRSI Concrete Reinforcing Steel Institute
933 No. Plum Grove Rd.
Schaumburg, IL 60173-4758
Washington, DC 20590
FS Federal Specification
Order from:
Standardization Documents Order Desk
Build 4, Section D
700 Robbins Ave.
Philadelphia, PA 1911-5094
MS Military Specifications (MILSPEC)
MIL-STD Order from:
Or Standardization Documents Order Desk
TM- Build 4, Section D
700 Robbins Ave.
Military Standardization Documents
US Dod World Publications and Forms Center
5801 Tabor Ave
Philadelphia, PA 19120
NBS National Bureau of Standards
(U.S. Department of Commerce)
Gaithersburg, MD 20234
NFPA National Fire Protection Association
P.O. Box 9146
Quincy, MA 02269
REFERENCE STANDARDS
OSHA Occupational Safety and Health Administration
(U.S. Department of Labor)
Order From:
Superintendent of Documents
U.S. Government Printing Officer
Washington, DC 20402-9371
PCA Portland Cement Association
5420 Old Orchard Road
Skokie, IL 60077
UBC Uniform Building Code
International Conference of Building Officials
5360 South Workman Mill Road
Whittier, CA 90601
UL Underwriters' Laboratories, Inc.
333 Pfingston Road
Northbrook, IL 60062
UPC Uniform Plumbing Code
International Conference of Building Officials
5360 South Workman Mill Road
Whittier, CA 90601
SECTION 01 45 00
QUALITY CONTROL
SECTION 01 45 00
QUALITY CONTROL
PART 1 - GENERAL:
A. Workmanship.
B. Manufacturers’ Instructions and Certificates.
C. Quality Control Plan
1.02 WORKMANSHIP:
A. Comply with industry standards except when more restrictive tolerances or specified requirements indicate more rigid standards or more precise workmanship.
B. Work shall be performed by a company whose primary business is the specified trade with a minimum of three continuous years documented experience for the specified trade.
C. Where specific instruction in these Specifications require that a particular product and/or materials be installed and/or applied by “approved applicator” of the manufacturer, it shall be the Contractor’s responsibility to ensure that any subcontractors used for such work be approved applicators in accordance with manufacturer’s recommendations.
D. Secure products in place with positive anchorage devices designed and sized to withstand appropriate stresses, vibration, and racking.
1.03 MANUFACTURERS’ INSTRUCTIONS AND CERTIFICATES:
A. When required by individual Specifications section, submit manufacturer’s printed instructions, in accordance with Section 01300, for product data, assembly, installation, adjusting, and finishing.
B. Comply with instructions in full details including each step in sequence. Should instructions conflict with Contract Documents, request clarification from the Contracting Officer before proceeding.
C. When required by individual Specifications section, submit manufacturers’ certificate, in duplicate, that products meet specified requirements.
1.04 QUALITY CONTROL PLAN: Contractor shall provide a Quality Control Plan showing steps taken to ensure compliance with this specification. The QCP shall be submitted as outlined in
Section 01300-Submittals.
TESTING LABORATORY SERVICES: NOT USED
PART 2 - PRODUCTS: NOT USED
PART 3 - EXECUTION: NOT USED
SECTION 01 52 00
CONSTRUCTION FACILITIES
SECTION 01 52 00
CONSTRUCTION FACILITIES
A. Sanitary facilities.
B. Barriers and barricades.
C. Removal.
1.02 SANITARY FACILITIES: Provide proper sanitary and adequate toilet facilities for the use of all workers employed on the Project, located where directed, and enforce their use by all personnel on the Project. Enclose and weatherproof toilets and keep in a sanitary condition at all times.
The Contractor shall be responsible to maintain the facility in sanitary condition.
1.03 BARRIERS AND BARRICADES:
A. The Contractor shall be solely responsible for furnishing, erecting, maintaining, and removing all protective barriers, signs, temporary lighting, etc., required for protection of persons and property.
B. Provide barriers as-required to prevent public entry to construction areas and to protect existing facilities and adjacent properties from damage from construction operations.
1.04 REMOVAL:
A. Remove temporary materials, equipment, services, and construction at the time of contract completion.
B. Clean and repair damage caused by installation or use of temporary facilities and restore existing facilities used during construction to original or specified condition. This will include cleaning streets where soil has been tracked.
SECTION 01 55 26
TRAFFIC CONTROL
TRAFFIC CONTROL
A. Traffic control equipment.
B. Construction parking control.
C. Flag persons.
D. Flares and Lights.
E. Haul Routes.
F. Traffic Signs and Signals.
G. Removal.
1.02 TRAFFIC CONTROL EQUIPMENT: Signs, signals, and devices including traffic control signals, cones, drums, flares, lights, and flag person equipment shall be as approved by local jurisdictions. (AFI 31-204, EAFB Supplement to 31-204, Manual of Uniform Traffic Devices)
1.03 CONSTRUCTION PARKING CONTROL:
A. Control vehicular parking to prevent interference with public traffic and parking, access by emergency vehicles, and the Government’s operations.
B. Monitor parking of construction personnel's vehicles. Maintain vehicular access to and through parking areas.
C. Prevent parking on or adjacent to access roads or in non-designated areas.
1.04 FLAG PERSONS: Provide trained and equipped flag persons to regulate traffic when construction operations or traffic encroach on public traffic lanes.
1.05 FLARES AND LIGHTS: Use flares and lights during hours of low visibility to delineate traffic lanes and to guide traffic.
1.06 HAUL ROUTES:
A. Unless otherwise directed, contractor shall use the specified haul route to access Ali Al
Salem AB and use the most direct route to the construction site. Construction traffic shall be confined to these designated routes.
B. Provide traffic control at critical areas of haul routes to regulate traffic, to minimize interference with public traffic.
TRAFFIC CONTROL
C. Drawings provided by the government will indicate pre-designated haul routes when applicable.
1.07 TRAFFIC SIGNS AND SIGNALS:
A. At approaches to site and on site, install at crossroads, detours, parking areas, and elsewhere as needed to direct construction and affected public traffic.
B. Install and operate traffic control signals to direct and maintain orderly flow of traffic in areas under Contractor's control, and areas affected by Contractor's operations.
C. Relocate as Work progresses to maintain effective traffic control.
1.08 REMOVAL:
A. Unless otherwise directed, remove all equipment and devices in their entirety when no longer required.
B. Repair damage caused by installation (rutted areas caused by equipment, debris on roads, trash, etc).
SECTION 01 77 00
CONTRACT CLOSEOUT
CONTRACT CLOSEOUT
A. Close-out Procedures.
B. Final Cleaning.
C. Warranties.
1.02 CLOSE-OUT PROCEDURES:
A. Provide the Contracting Officer with a requested date for final inspection on each
Contract, in writing, not less than 5 working days prior to the proposed date of final inspection. The Contracting Officer will coordinate with members of the inspection party and establish the final inspection date. If construction deficiencies are identified, a request for re-inspection must be given upon correction of the deficiencies. The 100%
Final Payment Request for a Contract will not be accepted until after final inspection and all punch list items are complete.
1.03 FINAL CLEANING:
A. Execute prior to final inspection.
B. Clean site; sweep paved areas, rake clean other surfaces.
C. Remove waste and surplus materials, rubbish, and construction facilities from the project and from the site.
1.04 WARRANTIES:
A. Provide all manufacturer's warranty documents required by individual sections.
B. Submit the documents with a Table of Contents and assemble in a binder with a durable plastic cover. Upon completion the Contractor shall provide “as-built” drawing files to the Contracting Officer. The digital drawing files shall be provided in the same format as originally provided.
DIVISION 02 – SITE WORK
DIVISION 02 – SITE WORK
02 41 00 Demolition 31
SECTION 02 41 00
DEMOLITION
DEMOLITION
1.01 SUMMARY:
A. Principal work in this section includes, but is not limited to the following:
1. Protection of existing work to remain.
2. Sawcut existing pavement.
3. Removal of existing construction as necessary to provide for new construction.
4. Debris removal.
5. Dust and FOD (Foreign Object Damage) Control.
1.02 MEASUREMENT AND PAYMENT
A. Measurement and payment of work performed under this contract shall be by surface area of the material demolished or removed, as measured in square yards. Sawcuts of existing pavement shall be measured and payment made by the linear foot, as designated by the type of material being cut and the depth of the cut (see bid schedule). Incidental work including but not limited to: erection of barricades and soil erosion barriers, traffic control, FOD prevention, administrative expenses, re-work, etc, shall be included in the base items listed in the bid schedule and no separate payment will be made for these items or any other item not listed in the bid schedule.
1.03 GENERAL PROVISIONS
A. Field Conditions: Take into consideration all obvious existing conditions on the site.
Accept the site of the work as it exists and clear obstructions to the work shown.
B. Examine the site and all conditions and limitations thereon and thereabouts. Take into account all such existing conditions and limitations whether or not the same are specifically shown or mentioned in any of the Contract Documents and include whatever is needed to complete the work in every part as shown, described of reasonably required or implied to attain the completed condition intended by the Contract.
C. Include the reworking of abutting surfaces to make new work join and match existing surfaces to remain.
D. Safety
1. Provide protection of persons and property throughout the progress of work. The work shall proceed in such a manner as to minimize the spread of dust and flying particles and to provide safe working conditions.
2. Furnish and install any necessary barricades to protect the public and workmen during demolition. Barricades to keep aircraft out of demolition areas shall be left in place until they are no longer required. Reference ETL 94-01.
DEMOLITION
3. Provide shoring or bracing required to support and protect work during demolition. Damage to existing facilities and/or adjoining property shall be the responsibility of the Contractor. Should any damage occur, such facilities or property shall be restored to its original condition at no additional cost to the
Government.
E. Existing Work to Remain: Provide such forms of protection as may be necessary to prevent damage to existing work to remain. Precautions shall be taken to insure demolition operations do not damage taxiing aircraft and/or cause flying particles to land on adjacent taxiway and aircraft parking apron.
F. Dust Control: Contractor shall provide dust control to prevent damage to adjacent aircraft. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as ice, flooding or pollution.
G. Submit proposed demolition and removal procedures to the Contracting Officer for approval before work is started. Procedures shall provide for coordination with other work in progress, a disconnection schedule for utility services, a detailed description of methods and equipment to be used for each operation, and sequence of operations.
PART 2 - PRODUCTS
2.01 MATERIALS:
A. Provide tools and equipment, as necessary for proper completion of this work.
3.01 GENERAL DEMOLITION AND REMOVAL:
A. Check drawings thoroughly and investigate existing construction.
B. Submit procedures proposed for demolition and removal of materials for approval. The procedures shall provide for safe conduct of the work, careful removal and disposition of materials, and protection of existing construction which is to remain undisturbed. The procedures shall include a detailed description of the methods and equipment to be used for each operation and the sequence of operations. A barricading plan shall be submitted by the Contractor to the Contracting Officer for approval 3 weeks prior to start of work.
3.02 PATCHING:
A. Unless otherwise shown, patch and finish surfaces as necessary to matching existing, and in accord with the requirements of the various specification sections.
3.03 REMOVED MATERIAL AND DEBRIS:
A. All materials resulting from demolition work, including existing Portland cement concrete pavement, shall become the property of the contractor and shall be removed from the limits of Government property. Rubbish and debris shall be removed from the
DEMOLITION
project daily. Materials that cannot be removed daily shall be stored in areas specified by the Contracting Officer.
B. Pavement adjacent to the project shall be maintained free of debris and dust at all times.
3.04 PROTECTIVE MEASURES:
A. Protection of Existing Underground Utilities. Active subsurface pipeline and conduits known to exist will be located during execution of the digging permit. Any lines encountered that are not located shall be called to the Contracting Officer's attention, who will issue instructions for proceeding with the work. Should old lines be encountered which prove to be "out of service", they shall be removed as part of excavating, or, if sufficiently below finish grades, as determined by the Contracting Officer, may be capped and left in place.
B. Protection of Existing Construction: Protect existing construction noted to remain. Any existing construction noted to be saved, that becomes damaged, will be restored or repaired to original condition or better.
DIVISION 31 - EARTHWORK
DIVISION 31 – EARTHWORK
31 23 01 Excavation and Subgrade Preparation 35
31 23 23.33 Controlled Low Strength Material (flowable fill) 47
SECTION 31 23 01
EXCAVATION AND SUBGRADE PREPARATION
EXCAVATION AND SUBGRADE PREPARATION
1.1 DESCRIPTION OF WORK:
This section includes excavations and subgrade preparations for all work within this contract.
1.2 QUALITY ASSURANCE:
1.2.1 Testing and Inspection Service:
1.2.2.1 The Contractor will employ an approved independent commercial testing laboratory to perform soil testing and inspection service for quality control testing during earthwork operations.
1.3 SUBMITTALS:
1.3.1 Test Reports-Excavating: Submit following reports directly to Contracting Officer from the testing services, with copy to Contractor:
1.3.1.1 Field density test reports.
1.3.1.2 One optimum moisture-maximum density curve for each type of soil encountered.
1.4 JOB CONDITIONS:
1.4.1 Site Examination: The Contractor shall examine the site and drawings to familiarize himself with the work to be done and conditions to be encountered.
For all projects requiring excavation, the Contractor’s proposal shall acknowledge that the soil conditions on Ali Al Salem Air Base are primarily rock. The
Contractor’s proposal shall include all necessary equipment, labor, and materials required to excavate through rock, remove surplus material and provide CO approved backfill material as directed.
1.4.2 Protection of Existing Utilities: The Contractor shall be responsible for having all utilities located prior to beginning construction. The Contractor shall be liable for all damages done to such existing facilities and structures as herein provided, and he shall save the Government harmless from any liability or expense for injuries, damages, or repair to such facilities.
1.4.3 Should uncharted, or incorrectly charted, piping or other utilities be encountered during excavation, consult Contracting Officer immediately for directions. Repair damaged utilities to satisfaction of the Contracting Officer if directed to do so.
1.4.4 Use of Explosives: The use of explosives is not permitted.
1.4.5 For work areas on streets or in parking lots, the Contractor shall furnish, install, and use traffic control signing and devices per the requirements of the Manual on Uniform Traffic
Control Devices for Streets and Highways.
1.4.6 Prior to the Contractor beginning construction, a detailed traffic control plan shall be furnished to the Contracting Officer for review and comment. The Contracting Officer may reject the above traffic control plan and may require a resubmission.
1.4.7 Protection of Persons and Property: Barricade open excavations occurring as part of this work and post with warning lights in accordance with the Manual of Uniform Traffic
Control Devices and Occupational Safety and Health Administration.
1.4.8 Operate warning lights as recommended by authorities having jurisdiction.
PART 2 - PRODUCTS
2.1 SOIL MATERIALS:
2.1.1 Definitions:
2.1.1.1 Satisfactory soil materials are defined as those complying with ASTM
D2487 soil classification groups GW, GP, GM, SM, SW, SP, ML, MH, CL, and CH.
2.1.1.2 Unsatisfactory soil materials are those soils not meeting the requirements of Satisfactory soil materials in 2.1.1.1 Unsatisfactory materials also include landfills, refuse, or debris from previous construction.
2.1.1.3 Backfill and Fill Materials: Satisfactory soil materials free of rock or gravel larger than 2" in any dimension, debris, waste, frozen materials, vegetable and other deleterious matter.
2.1.1.4 Bedding for the Reinforced Concrete Pipe storm sewer pipe shall consist of an earth or gravel cradle of uniform density shaped to fit the lower part of the pipe for at least 10% of its overall height.
Bedding for the water main and other types of pipe shall be materials free of cinder, ashes, refuse organic material and other unsuitable material and shall meet the following gradation requirements by dry weight.
Percent passing a 1-inch sieve
Percent passing a 3/4-inch sieve......................... 90-100
Percent passing a 3/8-inch sieve........................... 20-55
Percent passing a No. 4 sieve................................ 0-10
Percent passing a No. 8 sieve.................................. 0-8
2.1.1.5 Select granular material for utility work shall consist of well-graded sand, gravel, crushed gravel, crushed stone or crushed slag composed of
EXCAVATION AND SUBGRADE PREPARATION
hard, tough and durable particles, and shall not contain more than 10 percent by weight of material passing the No. 200 sieve and no less than
95 percent by weight passing the 1-inch sieve, with a maximum allowable aggregate size of l inch or the maximum size recommended by the pipe manufacturer, whichever is smaller, unless otherwise specified.
2.1.1.6 Unstable material shall consist of materials too wet to properly support the utility pipe, conduit or appurtenant structure.
2.1.1.7 Foundation Bedding Material for digouts, storm sewers and utility work shall be used when unstable material unable to support the utility pipe, conduit or appurtenant structure, or when soft subgrade material is encountered. The unstable material shall be excavated and replaced with foundation bedding material. The foundation material shall consist of 1" to 3" clean rock.
2.1.1.8 Sugar Rock: Sugar rock for digouts shall be made from crushed limestone ledge rock and shall conform to the following gradation.
Size Percent Passing
7" 100
6" 95-100
3" 0-10
2" 0-5
2.2 FILTER FABRIC:
2.2.1 Filter fabric: Drainage fabric for use with the digouts shall be a woven or non-woven fabric consisting of long chain polymeric filaments or yarns, such as polypropylene, polyethylene, polyester, polyamide or polyvinylid-chloride. The fabric shall be formed into a stable network insuring that the filaments or yarns retain their relative position to each other. The fabric shall be inert to commonly encountered chemicals and shall meet the following requirements:
Minimum
Test Test Method Avg. Roll Value
Grab Tensile Strength ASTM D 4632 200 lbs
Elongation ASTM D 4632 50%
Mullen Burst Strength ASTM D 3786 350 psi
Puncture Strength ASTM D 3787 90 lbs.
EOS (Equivalent Opening Size) ASTM D 4751 70 to 140
U.S. Std Sieve
Certification that the drainage fabric meet specification requirements shall be furnished.
2.3 SUBGRADE STABILIZATION MATERIAL
The subgrade stabilization material shall be Tensar SS1, or approved equal. Fabric shall be installed flat over subgrade materials as directed by the Contracting Officer. The Fabric shall be placed in accordance with recommended installation procedures furnished by the manufacturer.
EXCAVATION AND SUBGRADE PREPARATION
Minimum overlap shall be one foot (1') or as recommended by the fabric manufacturer. The
Contracting Officer may direct additional overlap up to three feet (3') in areas.
Material certification and installation instructions shall be submitted prior to installation.
3.1 EXCAVATION:
3.1.1 Excavation for the grading and trenching is Unclassified, and includes excavation to subgrade elevations indicated, regardless of character of materials and obstructions encountered. Material excavated at the site may be considered usable for grading and backfill purposes subject to the requirements of Part 2, Paragraph 2.1 of these specifications. The Contractor shall furnish any additional fill required to complete the grading or dispose of excess excavated material at his expense.
3.1.2 Unauthorized excavation consists of removal of materials beyond indicated subgrade elevations or dimensions without specific direction of Contracting Officer. Unauthorized excavation, as well as remedial work directed by Contracting Officer shall be at
Contractor's expense.
3.1.3 Compact unauthorized excavations as specified for authorized excavations of same classification, unless otherwise directed by Contracting Officer.
3.1.4 Excess Material Disposal: All unsatisfactory materials removed from excavations shall be disposed of in designated waste disposal or spoil areas.