Answers to questions posed on 19 March 2015
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Shall the contractor provide the chlorine and PH tests mentioned in Attachment 5, Opening and Closing Procedures?
ANSWER: The chlorine and PH test are provided by the Civil Engineering Squadron.
2. What is the total area of the pool, surroundings, toilets, etc. to be cleaned by the contractor?
ANSWER: The total area to be cleaned by the contractor, to include pools, pool deck, bathhouses is 19913 sq. ft. (1850 m2). To clarify,the measurement of 19913 sq ft does not include the fifty (50) feet outside pool perimeter that require cleaning as per PWS paragraph 1.1.8.1.
3. How many toilets and showers are there in the facility?
ANSWER: There are a total of two (2) lavatories, one (1) male; one (1) female with a combined total of seven (7) toilets, three (3) urinals and five (5) showers. Male facility has four (4) toilets, three (3) urinals and two (2) showers. Female facility has three (3) toilets and three (3) showers.
4. Are the contractor lifeguards required to teach swimming lessons?
ANSWER: No, the lifeguards are not required to give swimming lessons.
5. Shall contractor provide a lead lifeguard in addition to numbers listed in staffing levels?
ANSWER: Yes, but only as required in paragraph 1.1.3.
6. Is the NAFI providing the equipment required to perform the requirements in PWS paragraph 1.1.8.5.?
ANSWER: Yes, the NAFI will provide all required equipment.
7. Does the the contractor have to provide specialized personnel to perform the requirements in PWS paragraph 1.1.8.5.
ANSWER: No.