INC-1101FINAL08-1012UT.xls
XLS spreadsheet 58 KB Posted
- Attached to
- RPR/replace Automatic transfer Switch SOC2 Federal contract opportunity
- Solicitation number
- FA5685-10-R-0014
About this file
INC-1101
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Other than full & open competition.pdf | ||
| 08-1012SPEC.pdf | ||
| C2.pdf | ||
| Site Visit Reservation Form.doc | DOC document | |
| E2.pdf | ||
| M3.pdf | ||
| E9.pdf | ||
| E8.pdf | ||
| E4.pdf | ||
| QPL_Apr_2010.xls | XLS spreadsheet | |
| E7 .pdf | ||
| E6 .pdf | ||
| E5.pdf | ||
| M1.pdf | ||
| C1.pdf | ||
| M2.pdf | ||
| E3.pdf | ||
| FA5685-10-R-0014 Solicitation.doc | DOC document | |
| FORM INC-1106.xls | XLS spreadsheet | |
| E1.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INC-1101 (Front)
| CONTRACTOR | ADDRESS | ||||||||||
| 39 CES/CECED | |||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | ||||||||||
| REPLACE AUTO TRANSFER SWITCH, SOC2 | 0.00 | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | |||||||||
| LJYC 08-1012 | 39th AIR BASE WING, INCIRLIK, ADANA, TURKEY | ||||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | |||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | ||
| NO | UNIT | TOTAL | MANDAYS | AVERAGE | TOTAL | DIRECT | TOTAL | ||||
| RATE | COSTS | ||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| R E C A P I T U L A T I O N | |||||||||||
| 1 | CIVIL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| 0.00 | 0.00 | 0.00 | |||||||||
| 2 | MECHANICAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| 0.00 | |||||||||||
| 3 | ELECTRICAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| 0 | 0.00 | ||||||||||
| T O T A L | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | |||||
| CIVIL | 0.00 | 0.00 | 0.00 | ||||||||
| 1 | ELECTRICAL MANHOLE C/W ALL ACESSORIES (CABLE RACKS, GROUNDING, LADDER, DRAINAGE C/W GRILL, PULL IRON, ETC.) | EA | 2,844.00 | ||||||||
| 2 | HEAVY DUTY ELECTRIC MANHOLE COVER | EA | 2,300.00 | ||||||||
| 3 | 2X4" CONCRETE ENCASED PVC DUCTLINE INCLUDING EXCAVATION BY HAND & MACHINE, CONCRETE, SUPPORTS, PVC PIPE, DETECTABLE TAPE, BACKFILL AND COMPACTION | LM | 1,124.00 | ||||||||
| 4 | TRENCH FOR GROUNDING CONDUCTOR (50X60 CM) | LM | 390.00 | ||||||||
| 5 | TRENCH FOR 4" RGSC (50X60 CM) INCLUDING EXCAVATION, SAND, DETECTABLE TAPE, CABLE MARKER, BACKFILLING AND COMPACTION | LM | 432.00 | ||||||||
| 6 | CONSTRUCT NEW METAL SUPPORT FOR DAY TANK | LS | 2,734.00 | ||||||||
| 7 | 0.00 | 0.00 | 0.00 | 10,039.04 | |||||||
| 8 | 0.00 | 0.00 | 0.00 | 50.10 | |||||||
| 9 | 0.00 | 0.00 | 0.00 | 43.00 | |||||||
| 10 | 0.00 | 0.00 | 0.00 | 1,551.20 | |||||||
| 11 | 0.00 | 0.00 | 0.00 | 346.80 | |||||||
| 12 | 0.00 | 0.00 | 0.00 | 344.00 | |||||||
| 16 | 0.00 | 11,700.00 | |||||||||
| 17 | 0.00 | 420.00 | |||||||||
| 18 | 0.00 | 2,090.00 | |||||||||
| TOTAL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 430.12 | |||||
| MECHANICAL | |||||||||||
| 1 | REMOVAL OF EXISTING TANK, PIPING AND ACCESSORIES | LS | |||||||||
| 2 | CONFINED SPACE ENTRY REQUIREMENTS | LS | |||||||||
| 3 | PROVIDE AND INSTALL NEW 1500 LITERS FUEL STORAGE DAY TANK C/W FITTINGS, CONNECTIONS AND ALL RELATED ACCESSORIES, | EA | |||||||||
| 4 | PROVIDE AND INSTALL LEVEL GAUGE C/W CONTROL PANEL, GAUGING CHART, FITTINGS AND ACCESSORIES | EA | |||||||||
| 5 | PROVIDE AND INSTALL LEAK DETECTION SYSTEM C/W CONTROL PANEL, FITTINGS AND ACCESSORIES | LS | |||||||||
| 6 | PROVIDE AND INSTALL STAINLESS STEEL GATE VALVES, CHECK VALVES, DRAIN VALVES, FILTERS ETC. | EA | |||||||||
| 7 | PROVIDE AND INSTALL FUEL TRANSFER PUMP | EA | 1,000.00 | ||||||||
| 8 | PROVIDE AND INSTALL MANUEL FUEL TRANSFER HAND PUMP | EA | 5.20 | ||||||||
| 9 | PROVIDE AND INSTALL BLACK STEEL PIPING, VARIOUS SIZE | LS | 210.00 | ||||||||
| 10 | 0.00 | 0.00 | 0.00 | 4.00 | |||||||
| 11 | 0.00 | 0.00 | 0.00 | 140.00 | |||||||
| 12 | 0.00 | 0.00 | 0.00 | 150.00 | |||||||
| 13 | 0.00 | 0.00 | 0.00 | 12.00 | |||||||
| 14 | 0.00 | 0.00 | 0.00 | 15.00 | |||||||
| 15 | 0.00 | 0.00 | 0.00 | 60.00 | |||||||
| 19 | 0.00 | 0.00 | 0.00 | ||||||||
| T O T A L | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| ELECTRICAL | |||||||||||
| 1 | DEMOLITION OF EXISTING WIRING AND EQUIPMENTS | LS | |||||||||
| 2 | GENERATOR CONTROL PANEL C/W CONTROL UNIT | EA | |||||||||
| 3 | BATTERY CHARGER | EA | |||||||||
| 4 | MANUAL TRANSFER SWITCH | EA | |||||||||
| 5 | BY PASS ISOLATED AUTOMATIC TRANSFER SWITCH | EA | |||||||||
| 6 | SPD 160 KA | EA | |||||||||
| 7 | MDP1 | EA | 1,000.00 | ||||||||
| 8 | WP BUSBAR BOX | EA | 5.20 | ||||||||
| 9 | 3X400A COMPACT CB IN WP ENCLOSURE | EA | 210.00 | ||||||||
| 10 | 3X240/120 SQMM NYY CABLE | LM | 4.00 | ||||||||
| 11 | 3X150/95 SQMM NYY CABLE | LM | 140.00 | ||||||||
| 12 | 4X16+16 SQMM NYY CABLE | LM | 150.00 | ||||||||
| 13 | CABLE TRAY C/W ACCESSORIES | LM | 12.00 | ||||||||
| 14 | 4X1,5 SQMM NYY CABLE | LM | 15.00 | ||||||||
| 15 | 10X1,5 SQMM NYY CABLE | LM | 60.00 | ||||||||
| 16 | GROUNDING PIT C/W GROUNDING ROD | EA | 30.00 | ||||||||
| 17 | 50 SQMM STRANDED BARE COPPER | LM | 20.00 | ||||||||
| 18 | 4" GRSC | LM | |||||||||
| 19 | 4" EMT | LM | |||||||||
| 20 | GASTIGHT FITTING 6" | EA | 50.00 | ||||||||
| 21 | GASTIGHT FITTING 4" | EA | 600.00 | ||||||||
| 1,400.00 | |||||||||||
| T O T A L | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| G R A N D T O T A L | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
&L&"Arial,Italic"&8
Engineer's Final &"Arial,Bold"&10CONSTRUCTION COST ESTIMATE BREAKDOWN&R&"Arial,Bold"FOR OFFICIAL USE ONLY
SHEET NO. &P OF &N
&L&"Times New Roman,Bold"Form INC-1101, Construction Cost Estimate Breakdown. (Rev 0, May 2008)&R&"Arial,Bold"FOR OFFICIAL USE ONLY
INC-1101 (Back)
| INSTRUCTIONS FOR COMPLETING Form INC-1101 | |||||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to | |||||
| permit itemizing of all direct costs. | |||||
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square | |||||
| feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB). | |||||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be | |||||
| funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract | |||||
| will be issued. Otherwise, the contractor is responsible for determining quantity estimates. | |||||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1. | |||||
| Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | |||||
| Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost. | |||||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract | |||||
| and of significant dollar value. | |||||
| Col 10 Line Total. Self-explanatory. | |||||
| NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | |||||
| page as follows. | |||||
| TOTAL MATERIAL COSTS | $ | 0.00 | |||
| ------------------------------- | |||||
| TOTAL LABOR COSTS | $ | 0.00 | |||
| ------------------------------- | |||||
| TOTAL OTHER DIRECT COSTS | $ | 0.00 | |||
| ------------------------------- | |||||
| TOTAL COSTS | $ | 0.00 | |||
| ------------------------------- | |||||
| OVERHEAD | % | $ | 0.00 | ||
| ------------------------------- | |||||
| SUBTOTAL | $ | 0.00 | |||
| ------------------------------- | |||||
| PROFIT | % | $ | 0.00 | ||
| ------------------------------- | |||||
| TOTAL PRICE | $ | 0.00 | |||
| DATE : | FIRM NAME | ||||
| ----------------------------------------------------------------- | |||||
| TITLE: | BY | ||||
| ---------------------------------------------------------- | ----------------------------------------------------------------- | ||||
| INSTRUCTIONS TO OFFERORS | |||||
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | |||||
| estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from | |||||
| this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data | |||||
| (see ASPR 3-807.3(e) and 3-807.4). | |||||
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this | |||||
| form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and | |||||
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of | |||||
| a. The existing, verifiable data. | |||||
| b. The judgmental factors applied in projecting from known data to the estimate, and | |||||
| c. The contingencies used by the offeror in his proposed price. | |||||
| In short, the offeror's estimating process itself needs to be disclosed. | |||||
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | |||||
| and made available to the contracting officer or his authorized representative upon request. | |||||
| 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | |||||
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate | |||||
| evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection | |||||
| with any negotiations prior to contract award. | |||||
| (Reverse of INC-1101., MAY 08) |
File details come from the government source that posted it. Updated .