FORM INC-1106.xls
XLS spreadsheet 71 KB Posted
- Attached to
- RPR/replace Automatic transfer Switch SOC2 Federal contract opportunity
- Solicitation number
- FA5685-10-R-0014
About this file
INC-1106
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Other than full & open competition.pdf | ||
| FA5685-10-R-0014 Solicitation.doc | DOC document | |
| E1.pdf | ||
| E4.pdf | ||
| QPL_Apr_2010.xls | XLS spreadsheet | |
| E7 .pdf | ||
| E6 .pdf | ||
| E5.pdf | ||
| M1.pdf | ||
| 08-1012SPEC.pdf | ||
| C2.pdf | ||
| Site Visit Reservation Form.doc | DOC document | |
| E2.pdf | ||
| INC-1101FINAL08-1012UT.xls | XLS spreadsheet | |
| M3.pdf | ||
| E9.pdf | ||
| E8.pdf | ||
| C1.pdf | ||
| M2.pdf | ||
| E3.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 08-1012 | REPLACE AUTO TRANSFER SWITCH, SOC2 | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| GENERAL | ||||||||||||||||||||||
| 1 | SUBMITTAL SCHEDULE (SPEC SEC 01 33 00) | 3 CP | NTP+ 10 D | |||||||||||||||||||
| 2 | SAFETY PLAN (SPEC SEC 01 35 30) | 3 CP | ||||||||||||||||||||
| 3 | QUALITY CONTROL PLAN (SPEC SEC 01 45 00. 00 20 & 01 45 04. 00 10)) | 3 CP | ||||||||||||||||||||
| 4 | KEY PERSONNEL LIST (SPEC SEC 01 45 00. 00 20) | 3 CP | ||||||||||||||||||||
| 5 | PROGRESS SCHEDULE (SPEC SEC 01 32 01) | 3 CP | ||||||||||||||||||||
| 6 | EQUIPMENT DELIVERY SCHEDULE (SPEC SEC 01 32 01) | 3 CP | ||||||||||||||||||||
| 7 | NOTICES FOR PROJECT COMPLETION AND FINAL INSPECTION (SPEC SEC 01 77 00) | 3 CP | ||||||||||||||||||||
| 8 | OPERATION AND MAINTENANCE MANUALS (SPEC SEC 01 78 23) | 3 CP | ||||||||||||||||||||
| 9 | AS BUILT DATA (1 Original, 1 Red Line) (SPEC SEC 01 77 00) | 3 CP | 0 CP + CD | |||||||||||||||||||
| 10 | HAZARDOUS MATERIAL LIST IN AF FORM 3952 (SPEC SEC 01 57 20) | 3 CP | ||||||||||||||||||||
| 11 | PHASING PLAN (SPEC SEC 01 32 01) | 3 CP |
&CATTACHMENT 4
&L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT SUB: MATERIAL SUBMITTAL&R&6COMPUTER GENERATED INC-1106, NOV 08
ELECTRICAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 08-1012 | REPLACE AUTO TRANSFER SWITCH, SOC2 | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| ELECTRICAL | ||||||||||||||||||||||
| 1 | SHOP DRAWING FOR LOAD BANK CONNECTION BOX | 3 | ||||||||||||||||||||
| 2 | SHOP DRAWING FOR BUSBAR CONNECTION BOX | 3 | ||||||||||||||||||||
| 3 | SHOP DRAWING FOR NEW ELECTRICAL PLAN AND SINGLE LINE DIAGRAMS | 3 | ||||||||||||||||||||
| 4 | SHOP DRAWING FOR NEW CABLE TRAY INSTALLATION | 3 | ||||||||||||||||||||
| 5 | SHOP DRAWING FOR NEW ELECTRICAL MANHOLES & DUCTLINES | 3 | ||||||||||||||||||||
| 6 | SHOP DRAWING FOR NEW GENERATOR CONTROL PANEL | 3 | ||||||||||||||||||||
| 7 | SHOP DRAWING FOR NEW GROUNDING PLAN | 3 | ||||||||||||||||||||
| 8 | BYPASS ISOLATED TRANSFER SWITCH (SPEC 26 36 00) | 3 | 3 | 3 | 3 | |||||||||||||||||
| 9 | MANUAL TRANSFER SWITCH (SPEC 26 36 00) | 3 | 3 | 3 | 3 | |||||||||||||||||
| 10 | SURGE PROTECTION DEVICE, 160 KA (SPEC 26 20 00) | 3 | 3 | 3 | ||||||||||||||||||
| 11 | CABLE TRAY & ACCESSORIES (SPEC 26 20 00) | 3 | 3 | |||||||||||||||||||
| 12 | CONDUITS & FITTINGS (SPEC 26 20 00) | 3 | 3 | |||||||||||||||||||
| 13 | CABLES (SPEC 26 05 19) | 3 | 3 | |||||||||||||||||||
| 14 | MDP1 PANEL (SPEC 26 20 00 & 26 24 16) | 3 | 3 | |||||||||||||||||||
| 15 | GAS-TIGHT FITTINGS (SPEC 26 20 00) | 3 | 3 | |||||||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 08-1012 | REPLACE AUTO TRANSFER SWITCH, SOC2 | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| ELECTRICAL | ||||||||||||||||||||||
| 16 | COMPACT CIRCUIT BREAKERS (SPEC 26 20 00) | 3 | 3 | |||||||||||||||||||
| 17 | BATTERY CHARGER (SPEC 26 32 14) | 3 | 3 | |||||||||||||||||||
| 18 | GENERATOR CONTROL UNIT (SPEC 26 32 14) | 3 | 3 | 3 | 3 | 3 | ||||||||||||||||
| 19 | NON METALLIC HEAVY DUTY CABLE RACK (SPEC 33 70 02) | 3 | 3 | |||||||||||||||||||
| 20 | SHOP DRAWING FOR NEW GENERATOR CONTROL PANEL | 3 | ||||||||||||||||||||
| 20 | DETECTABLE TAPE | 3 | 3 | |||||||||||||||||||
| 20 | PULLING IRON | 1 |
&CATTACHMENT 4
&L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT SUB: MATERIAL SUBMITTAL&R&6COMPUTER GENERATED INC-1106, NOV 08
MECHANICAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 08-1012 | REPLACE AUTO TRANSFER SWITCH, SOC2 | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| ELECTRICAL | ||||||||||||||||||||||
| 1 | DOUBLE WALLED FUEL STORAGE TANK (SPEC 33 56 13) | 3CP | 3CP | 3CP | 3CP | |||||||||||||||||
| 2 | LEAK DETECTION SYSTEM (SPEC 33 56 13) | 3CP | 3CP | 3CP | ||||||||||||||||||
| 3 | LEVEL SENSING ELEMENT (SPEC 40 05 13) | 3CP | 3CP | 3CP | ||||||||||||||||||
| 4 | VALVES (SPEC 40 05 13) | 3CP | 3CP | 3CP | ||||||||||||||||||
| 5 | FUEL FILTERS (26 32 14.00 10) | 3CP | 3CP | 3CP | ||||||||||||||||||
| 6 | BLACK STEEL PIPES (SPEC 33 52 13) | 3CP | 3CP | 3CP | ||||||||||||||||||
| 7 | SHOP DRAWINGS | 3CP |
&CATTACHMENT 4
&L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT SUB: MATERIAL SUBMITTAL&R&6COMPUTER GENERATED INC-1106, NOV 08
CIVIL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 08-1012 | REPLACE AUTO TRANSFER SWITCH, SOC2 | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| ELECTRICAL | ||||||||||||||||||||||
| 1 | SHOP DRAWING FOR LOCKABLE HEAVY DUTY ELECTRICAL MANHOLE COVER & FRAME (DWG E9) | 3 | ||||||||||||||||||||
| 2 | SHOP DRAWING FOR LOCKABLE HEAVY DUTY GROUNDING MANHOLE COVER & FRAME(DWG E8) | 3 | ||||||||||||||||||||
| 3 | LOCKABLE HEAVY DUTY ELECTRICAL MANHOLE COVER & FRAME(DWG E9) | 3 | 3 | 3 | ||||||||||||||||||
| 4 | LOCKABLE HEAVY DUTY GROUNDING MANHOLE COVER & FRAME (DWG E8) | 3 | 3 | 3 | ||||||||||||||||||
| 5 | BASE COURSE AGREGA (SPEC 32 11 24) | 3 | 3 | |||||||||||||||||||
| 6 | CONCRETE (SPEC 03 30 00.00 20) | 3 | 3 | |||||||||||||||||||
| 7 | REINFORCEMENT (SPEC 03 20 01.00 10) | 3 | 3 | |||||||||||||||||||
| 8 | SHOP DRAWING FOR HOT DIP GALVANAIZED LADDER (DWG E9) | 3 |
&CATTACHMENT 4
&L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT SUB: MATERIAL SUBMITTAL&R&6COMPUTER GENERATED INC-1106, NOV 08