FA5685-10-R-0014 Solicitation.doc

DOC document 200 KB Posted

Attached to
RPR/replace Automatic transfer Switch SOC2 Federal contract opportunity
Solicitation number
FA5685-10-R-0014
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Solicitation Document

View the file

Other files for this federal contract opportunity

Other files attached to RPR/replace Automatic transfer Switch SOC2, newest first.
File Type Posted
Other than full & open competition.pdf PDF
FORM INC-1106.xls XLS spreadsheet
E1.pdf PDF
C1.pdf PDF
M2.pdf PDF
E3.pdf PDF
08-1012SPEC.pdf PDF
C2.pdf PDF
Site Visit Reservation Form.doc DOC document
E2.pdf PDF
INC-1101FINAL08-1012UT.xls XLS spreadsheet
M3.pdf PDF
E9.pdf PDF
E8.pdf PDF
E4.pdf PDF
QPL_Apr_2010.xls XLS spreadsheet
E7 .pdf PDF
E6 .pdf PDF
E5.pdf PDF
M1.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lump Sum

RPR/Replace Auto Transfer Switch SOC2

FFP

SERVICES NON-PERSONAL: Provide all labor, equipment, materials, tools, parts and transportation to and from job site to complete RPR/Replace Automatic Transfer Switch SOC2 (Project No: LJYC 08-1012) in accordance with (IAW) the Specifications and Drawings. Period of Performance is 220 days after Contracting officer issues CNTP.

FOB: Destination

NSN: Z299-98-029-A008

SIGNAL CODE: A

NET AMT

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
0001
220 dys. ADC
1
F2G3C2 39 CES/CECEP BASE CIVIL ENG

DURMUS ZANAPA

39CES/CECEP BLDG 444 UNIT 7065

APO AE 09824

676-3433

FOB: Destination F2G3C2

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.203-3
Gratuities
APR 1984
52.203-5
Covenant Against Contingent Fees
APR 1984
52.203-7
Anti-Kickback Procedures
JUL 1995
52.203-8
Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
JAN 1997
52.203-10
Price Or Fee Adjustment For Illegal Or Improper Activity
JAN 1997
52.203-11
Certification And Disclosure Regarding Payments To Influence Certain Federal Transactions
SEP 2007
52.203-12
Limitation On Payments To Influence Certain Federal Transactions
SEP 2007
52.204-4
Printed or Copied Double-Sided on Recycled Paper
AUG 2000
52.204-9
Personal Identity Verification of Contractor Personnel
SEP 2007
52.209-5
Certification Regarding Responsibility Matters
APR 2010
52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
SEP 2006
52.215-2
Audit and Records--Negotiation
MAR 2009
52.215-8
Order of Precedence--Uniform Contract Format
OCT 1997
52.215-21
Requirements for Cost or Pricing Data or Information Other Than Cost or Pricing Data--Modifications
OCT 1997
52.222-21
Prohibition Of Segregated Facilities
FEB 1999
52.222-22
Previous Contracts And Compliance Reports
FEB 1999
52.222-23
Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction
FEB 1999
52.222-27
Affirmative Action Compliance Requirements for Construction
FEB 1999
52.222-50
Combating Trafficking in Persons
FEB 2009
52.223-5
Pollution Prevention and Right-to-Know Information
AUG 2003
52.223-13
Certification of Toxic Chemical Release Reporting
AUG 2003
52.223-14
Toxic Chemical Release Reporting
AUG 2003
52.225-13
Restrictions on Certain Foreign Purchases
JUN 2008
52.225-14
Inconsistency Between English Version And Translation Of Contract
FEB 2000
52.226-5
Restrictions on Subcontracting Outisde Disaster or Emergency Area
NOV 2007
52.228-4
Workers' Compensation and War-Hazard Insurance Overseas
APR 1984
52.229-6
Taxes--Foreign Fixed-Price Contracts
JUN 2003
52.232-5
Payments under Fixed-Price Construction Contracts
SEP 2002
52.232-27
Prompt Payment for Construction Contracts
OCT 2008
52.232-34
Payment By Electronic Funds Transfer--Other Than Central Contractor Registration
MAY 1999
52.233-1
Disputes
JUL 2002
52.233-3
Protest After Award
AUG 1996
52.233-4
Applicable Law for Breach of Contract Claim
OCT 2004
52.236-1
Performance of Work by the Contractor
APR 1984
52.236-2
Differing Site Conditions
APR 1984
52.236-3
Site Investigation and Conditions Affecting the Work
APR 1984
52.236-5
Material and Workmanship
APR 1984
52.236-6
Superintendence by the Contractor
APR 1984
52.236-7
Permits and Responsibilities
NOV 1991
52.236-8
Other Contracts
APR 1984
52.236-9
Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10
Operations and Storage Areas
APR 1984
52.236-11
Use and Possession Prior to Completion
APR 1984
52.236-12
Cleaning Up
APR 1984
52.236-13
Accident Prevention
NOV 1991
52.236-14
Availability and Use of Utility Services
APR 1984
52.236-15
Schedules for Construction Contracts
APR 1984
52.236-17
Layout of Work
APR 1984
52.236-21
Specifications and Drawings for Construction
FEB 1997
52.236-26
Preconstruction Conference
FEB 1995
52.236-27
Site Visit (Construction)
FEB 1995
52.236-28
Preparation of Proposals--Construction
OCT 1997
52.242-13
Bankruptcy
JUL 1995
52.242-14
Suspension of Work
APR 1984
52.243-1
Changes--Fixed Price
AUG 1987
52.243-4
Changes
JUN 2007
52.243-5
Changes and Changed Conditions
APR 1984
52.244-5
Competition In Subcontracting
DEC 1996
52.244-6
Subcontracts for Commercial Items
APR 2010
52.246-21
Warranty of Construction
MAR 1994
52.248-3
Value Engineering-Construction
SEP 2006
52.249-2 Alt I
Termination for Convenience of the Government (Fixed-Price) (May 2004) - Alternate I
SEP 1996
52.249-10
Default (Fixed-Price Construction)
APR 1984
52.253-1
Computer Generated Forms
JAN 1991
252.203-7000
Requirements Relating to Compensation of Former DoD Officials
JAN 2009
252.203-7001
Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies
DEC 2008
252.203-7002
Requirement to Inform Employees of Whistleblower Rights
JAN 2009
252.204-7003
Control Of Government Personnel Work Product
APR 1992
252.204-7004 Alt A
Central Contractor Registration (52.204-7) Alternate A
SEP 2007
252.204-7006
Billing Instructions
OCT 2005
252.209-7001
Disclosure of Ownership or Control by the Government of a Terrorist Country
JAN 2009
252.209-7004
Subcontracting With Firms That Are Owned or Controlled By The Government of a Terrorist Country
DEC 2006
252.222-7002
Compliance With Local Labor Laws (Overseas)
JUN 1997
252.223-7006
Prohibition On Storage And Disposal Of Toxic And Hazardous Materials
APR 1993
252.229-7000
Invoices Exclusive of Taxes or Duties
JUN 1997
252.232-7008
Assignment of Claims (Overseas)
JUN 1997
252.232-7010
Levies on Contract Payments
DEC 2006
252.233-7001
Choice of Law (Overseas)
JUN 1997
252.236-7000
Modification Proposals-Price Breakdown
DEC 1991
252.243-7001
Pricing Of Contract Modifications
DEC 1991
252.243-7002
Requests for Equitable Adjustment
MAR 1998
252.247-7022
Representation Of Extent Of Transportation Of Supplies By Sea
AUG 1992
252.247-7023
Transportation of Supplies by Sea
MAY 2002
252.247-7024
Notification Of Transportation Of Supplies By Sea
MAR 2000

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 220 days after CNTP. The time stated for completion shall include final cleanup of the premises.

*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

CLAUSES INCORPORATED BY FULL TEXT

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $287.11 for the first day and $176.96 for each calendar day thereafter until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

CLAUSES INCORPORATED BY FULL TEXT

52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JULY 2000)

(a) The Contractor shall submit one of the following payment protections:

Bank Letter of Guarantee

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within 10 days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

(End of clause)

CLAUSES INCORPORATED BY FULL TEXT

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil (End of clause)

252.225-7041 CORRESPONDENCE IN ENGLISH (JUNE 1997)

The Contractor shall ensure that all contract correspondence that is addressed to the United States Government is submitted in English or with an English translation.

(End of clause)

252.229-7001 TAX RELIEF (JUN 1997)

(a) Prices set forth in this contract are exclusive of all taxes and duties from which the United States Government is exempt by virtue of tax agreements between the United States Government and the Contractor's government. The following taxes or duties have been excluded from the contract price:

NAME OF TAX: (Offeror Insert) RATE (PERCENTAGE): (Offeror Insert)

(b) The Contractor's invoice shall list separately the gross price, amount of tax deducted, and net price charged.

(c) When items manufactured to United States Government specifications are being acquired, the Contractor shall identify the materials or components intended to be imported in order to ensure that relief from import duties is obtained. If the Contractor intends to use imported products from inventories on hand, the price of which includes a factor for import duties, the Contractor shall ensure the United States Government's exemption from these taxes. The Contractor may obtain a refund of the import duties from its government or request the duty-free import of an amount of supplies or components corresponding to that used from inventory for this contract.

(End of clause)

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (MAR 2008)

(a) Definitions. As used in this clause--

(1) Contract financing payment and invoice payment have the meanings given in section 32.001 of the Federal Acquisition Regulation.

(2) Electronic form means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting Officer.

(3) Payment request means any request for contract financing payment or invoice payment submitted by the Contractor under this contract.

(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/.

(c) The Contractor may submit a payment request and receiving report using other than WAWF only when--

(1) The Contracting Officer authorizes use of another electronic form. With such an authorization, the Contractor and the Contracting Officer shall agree to a plan, which shall include a timeline, specifying when the Contractor will transfer to WAWF;

(2) DoD is unable to receive a payment request or provide acceptance in electronic form;

(3) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer's determination with each request for payment; or

(4) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System).

(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.

(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payments requests.

(End of clause)

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified.

(End of clause)

5352.201-9101 Ombudsman. OMBUDSMAN (APR 2010)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) If resolution cannot be made by the contracting officer, concerned parties may contact the Center/MAJCOM ombudsmen:

Primary:

David Jones

HQ USAFE/A7K, UNIT 3050, Box 10, APO AE 09094-0110

HQ USAFE/A7K, Flugplatz Ramstein, 66877 Ramstein Germany

E-mail: david.jones@ramstein.af.mil Tel: 0049-637-147-2209, Fax: (49)-6731-47-2025

Alternate:

Heidi Hoehn

HQ USAFE/A7K, UNIT 3050, Box 10, APO AE 09094-0110

HQ USAFE/A7K, Flugplatz Ramstein, 66877 Ramstein Germany

E-mail: heidi.hoehn@ramstein.af.mil

Tel: 0049-637-147-9330, Fax: (49)-6731-47-2025

Concerns, issues, disagreements, and recommendations that cannot be resolved at the MAJCOM/DRU level, may be brought by the concerned party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (703) 588-7004, facsimile number (703) 588-1067.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.

(End of clause)

5352.242-9000 Contractor access to Air Force installations.

CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (JUN 2002)

(a) The contractor shall obtain base identification and vehicle passes for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or security police for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, and valid vehicle insurance certificate to obtain a vehicle pass.

(c) Our office will certify applications for gate passes for Turkish pass and ID. The Turkish Air Force will coordinate with contractors to attain the necessary documents and information to grant access to the installation. The U.S. government will not be held liable for any delays or breach of contract caused by refusal of the Turkish Air Force to grant a gate pass to a contractor. If a gate pass is not granted to a contractor allowing the delivery of goods, execution of warranty support, or performance of services please contact the contracting officer immediately. Below is a number to the Turkish Air Force Pass and ID for all gate pass issues: 322-316-4184 or 322-316-4186

(d) Performance of this contract is located on a Turkish Air Force installation, and all access to the installation is controlled and granted by the Turkish Air Force (TAF) Security Battalion.

(e) Prior to commencing work the Contractor shall furnish a complete list of all vehicles and personnel involved in the accomplishment of the contract work to the Turkish Air Force Pass and ID or designated representative to ensure access to the respective installations. The following information must be furnished on this list:

Vehicles: Make, model, year of manufacture, capacity, type, license number, and insurance policy number. Personnel: First and last name, date of birth, place of birth, passport or identification card number, place of residence and any such other information, as required, to satisfy individual air base or army security regulations governing access to granting of passes to the particular military establishment.

(f) All passes may be obtained from the Turkish Air Force Pass and ID or designated representative approximately 10 days after the aforementioned lists have been submitted. The contractor shall inform all assigned workers that they may be subject to search, at the discretion of the installation commander, when entering or leaving the installation.

(g) Installation passes will be returned immediately to the Issuing Officer when:

(1) Pass has expired.

(2) Pass holder is no longer employed by the Contractor.

(3) Contract is completed.

(4) Issuing Officer so directs.

(h) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

(1) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101, Volume 1, The Air Force Installation Security Program, and AFI 31-501, Personnel Security Program Management, as applicable.

(j) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

(k) Failure to comply with these requirements may result in withholding of final payment.

(End of clause)

Section J - List of Documents, Exhibits and Other Attachments

SECTION J

DOCUMENT TYPE

DESCRIPTION

PAGES

DATE

Attachment 1

Specifications

JULY 2010

Attachment 2

Drawings

JULY 2010

Attachment 3

AF Form 66 / INC 1106

Undated

Attachment 4

AF Form 3052 / INC 1101

Undated

Attachment 5

Past Performance Questionnaire

Undated

Attachment 6

QPL

Undated

The above attachments will be provided to each offeror on a CD-ROM prior to or at a time of the scheduled Pre-Proposal Conference/Site Visit.

Section K - Representations, Certifications and Other Statements of Offerors

CLAUSES INCORPORATED BY FULL TEXT

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2009)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238210.

(2) The small business size standard is N/A.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the clause at 52.204-7, Central Contractor Registration, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the clause at 52.204-7 is not included in this solicitation, and the offeror is currently registered in CCR, and has completed the ORCA electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

(__) Paragraph (d) applies.

(__) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in ORCA are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless--

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $100,000.

(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the clause at 52.204-7, Central Contractor Registration.

(iv) 52.204-5, Women-Owned Business (Other Than Small Business).This provision applies to solicitations that--

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(v) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(vi) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(vii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(viii) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(ix) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(x) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xi) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xii) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xiii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xiv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA-designated items.

(xv) 52.225-2, Buy American Act Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xvi) 52.225-4, Buy American Act--Free Trade Agreements—Israeli Trade Act Certificate. (Basic, Alternate I, and Alternate II) This provision applies to solicitations containing the clause at 52.225-3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $67,826, the provision with its Alternate II applies.

(xvii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xviii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification.

(xix) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to--

(A) Solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions; and

(B) For DoD, NASA, and Coast Guard acquisitions, solicitations that contain the clause at 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns.

(2) The following certifications are applicable as indicated by the Contracting Officer:

(Contracting Officer check as appropriate.)

----(i) 52.219-19, Small Business Concern Representation for the Small Business Competitiveness Demonstration Program.

------(ii) 52.219-21, Small Business Size Representation for Targeted Industry Categories Under the Small Business Competitiveness Demonstration Program.

------(iii) 52.219-22, Small Disadvantaged Business Status.

------(A) Basic.

------(B) Alternate I.

------(iv) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

------(v) 52.222-48, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Certification.

------(vi) 52.222-52 Exemption from Application of the Service Contract Act to Contracts for Certain Services--Certification.

------(vii) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA-Designated Products (Alternate I only).

------(viii) 52.223-13, Certification of Toxic Chemical Release Reporting.

------(ix) 52.227-6, Royalty Information.

------ (A) Basic.

------ (B) Alternate I.

------(x) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The offeror has completed the annual representations and certifications electronically via the Online Representations and Certifications Application (ORCA) website at http://orca.bpn.gov. After reviewing the ORCA database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below (offeror to insert changes, identifyingchange by clause number, title, date). These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on ORCA.

(End of Provision)

Section L - Instructions, Conditions and Notices to Bidders

SECTION L

L-01.

PROPOSAL PREPARATION INSTRUCTIONS

A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The response shall consist of three (3) separate parts; Part I - Price Proposal, Part II - Technical Proposal, and Part III - Past Performance Information.

B. The Contracting Officer (CO) has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the CO will review this determination and if, in the CO’s opinion, adequate price competition exists, no additional cost information will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the CO determines that adequate price competition no longer exists; offerors may be required to submit information to the extent necessary for the CO to determine the reasonableness and affordability of the price.

C. Specific Instructions:

1. PART I – PRICE PROPOSAL - Submit original and one (1) copy

(a) Complete blocks 14, 15, 17, 18, 19 and 20 of the SF 1442.

(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN).

(c) Complete the necessary fill-ins and certifications in Sections F through K. Section K shall be returned in its entirety. For Sections F through J, the offeror shall submit only those pages that require a fill-in.

(d) Each offeror shall be responsible for estimating and conforming the individual quantities required by Technical Specifications & Drawings. These quantities shall be included on the INC Form 1101(old Form 3052, Cost Breakdown), and will be used during the evaluation of offeror and negotiations, if required. The INC 1101 SHALL NOT be a part of the resultant contract (see Section J, Attachment 4).

(e) Acknowledgement of all amendments to the solicitation in accordance with the instructions on the SF 30 (amendment form)

2. PART II – TECHNICAL PROPOSAL - Limited to no more than 35 pages. Submit original plus one (1) copy.

1. (Quality Control: Contractor shall provide information that effectively represents their quality control program and methodology. The offeror’s quality control plan and methodology shall meet or exceed commercial standards routinely used by the construction industry for same or similar projects. Any innovative procedures or methods shall be explained in detail. This information shall provide the Government with no doubt of the offeror’s contract management and process improvement abilities.

2. Technical Capabilities: The offeror shall provide information that effectively represents their technical expertise and project management capabilities. All techniques and resources shall meet or exceed commercial standards routinely used by the construction industry for same or similar projects. Any innovative procedures or methods shall be explained in detail. As a minimum, offerors shall include:

a. A narrative to demonstrate a sound approach and methodology for accomplishing work requirements identified in the solicitation with the appropriate skills, equipment, and materials, in the appropriate quantities, and at the appropriate time to meet the Government’s desired outcomes. Each offeror shall also submit their proposed materials and procedures for the major elements of the project as listed below. The narrative and materials submittal shall provide the Government with no doubt of the offeror’s abilities to manage all resources required to perform the requirements outlined in this solicitation. The offeror’s proposed material listing shall be incorporated into any resultant contract.

(1) Electrical Works

b. A progress schedule for all major construction elements of this project based upon the offeror’s proposed performance period. Offerors shall use the attached AF Form 3064 or equivalent. All milestones shall be annotated with actual dates and a line graph. The offeror’s proposed performance period shall not exceed the performance period outlined in SF 1442, block 11. The progress schedule shall demonstrate the offeror’s technical capabilities and expertise. The Government shall be confident and have no doubt in the offeror’s ability to manage and complete all requirements within the proposed performance period.

c. A detailed shop drawing of the new generator protection and control system installation to be installed in accordance with the specifications of this project. The drawing shall include all dimensions and parts. The drawings shall represent the offerors technical capabilities and expertise to stand-by generators required in this solicitation. The narrative and materials submittal shall provide the Government with no doubt of the Contractor’s abilities to effectively plan and manage the installation of the all new electrical system.

d. Documentation (Resume, references), indicating that electrical engineer assigned to this project has a minimum of five years experience on LV electrical distribution systems , by-pass isolated automatic transfer switches and stand-by generators This engineer must be able to speak English and will be required to be present at the job site at all times when work is in progress.

e. Submit signed copy of QPL

3. PART III – PAST PERFORMANCE INFORMATION - Limited to no more than 1 page. Only references for same or similar type contract desired. Submit original plus one (1) copy Performance Surveys: The USG will seek relevant performance information on the lowest priced offerors rated technically acceptable. Information will be based on no more than two (2) past/present efforts provided by the offeror and data independently obtained from other USG or commercial sources.

D. Copies/Page Limit: Copies of each volume shall be submitted in accordance with the below:

Volume
Volume Title
Number of Proposal
Max No. of Pages
I
SF 1442 Proposal
1 Original + 1 Copy
N/A
II
Technical Proposal

a. Quality Control Plan

b. Narrative and Materials

c. Project Schedule

d. Key Personnel 1 Original + 1 Copy

1 Original + 1 Copy

1 Original + 1 Copy

1 Original + 1 Copy

III
Past Performance Information
1 Original + 1 copy
1

L-02.

GENERAL INFORMATION

A. Contractors should be aware that this is a Turkish Installation and that all access to this installation is granted by the Turkish Air Force (TuAF). Therefore SOME DELAYS SHOULD BE ANTICIPATED WHEN HAND CARRYING PROPOSALS. Offeror should allow sufficient time to arrive and submit the proposals to Contracting Office PRIOR to the set closing time. Late proposals will be processed in accordance with the provisions “Late Submission, Modifications, and Withdrawals of Proposals”. If a gate access is not granted please contact the CO immediately. The contractors are responsible for coordinating and processing gate pass requests in a timely manner. The USG shall not be held accountable. Furthermore, contractors must consider that although the duty day is Monday through Friday from 07:30 to 16:30, contractors may not get to the job site at 07:30 due to TuAF gate entrance procedures. Also, contractors need to exit the base by 16:30. This may require contractors to stop work, prepare to leave the base, and clean up prior to 16:30. Contractors are encouraged to take this into consideration when proposing a delivery or performance time. The USG shall not be responsible for delays due to in processing or out-processing the base.

B. YOUR COMPANY MUST BE CENTRAL CONTRACTOR REGISTRATION (CCR) REGISTERED IN ORDER TO BE CONSIDERED FOR AWARDS.

THE WEBSITE FOR CCR REGISTRATION: http://www.ccr.gov/

1. YOU NEED TO HAVE DUNS AND NGACE CODE (NATO CAGE CODE) TO BE

REGISTERED ON CCR.

a. NATO CAGE CODE: ________________________________

b. If you do not have a NATO Cage Code, you must contact:

http://www.msb.mil.tr/prgs/tekhizweb/TEKMURACAT/NCAGE/default.asp or MLLI SAVUNMA BAKANLIGI

TEK.HIZ.D. BSK.LIGI

(TURK MILLI KODLANDIRMA BUROSU)

06100 Bakanliklar, ANKARA

2. Telephone NCAGE ASSIGNMENT: 0312-4106184

a. YOUR COMPANY’S “DUNS” NUMBER: ___________________________

b. If you do not have a DUNS number, you must contact “DUNS and BRADSTREET”, at the numbers below to have one assigned, before your quotation will be considered:

U.S.A. OFFICE:

ISTANBUL OFFICE (Ms. Demet Kulik):

Phone: 001 610-882-7741

Phone: 0-212-327-2238 ext 122

FAX: 001 610-882-7140

FAX: 0-212-327-2243

WEBSITE: http://www.dbis/customer/custlist.htm or http://www.finar.com.tr C. Proposal Characteristics:

(1) All text must be legible and easily read. All text shall be typed single-spaced. Margins (1-inch) shall be clean and clear. Each volume shall be contained within a separate 3 or 2-ring binder (no heat or spiral bound volumes). Quality Control Plan shall be submitted in separate 2 or 3 ring binders. Project Schedule shall be developed and submitted in Microsoft Project format sufficiently sized for clear readability and separately bound.

(2) All proposals shall contain the requirements stated herein and the volume number and name, address, and telephone number of the prime on the cover shall identify every volume. Each volume shall also contain a Table of Contents, List of Tables, List of Figures, List of Appendices, and List of Acronyms and at the bottom left side of each page the volume number shall be included. The list of acronyms should include all acronyms appearing in the volume. The offeror's name, address, signature, and telephone number shall appear on any document to be evaluated.

(3) Proposal clarity, organization (as requested in this solicitation) and cross-referencing are mandatory. No material shall be incorporated by reference. General cross-references or cross-referencing guides will not be considered as appropriate cross-reference. In order for the proposal to receive an in-depth evaluation, it is necessary that the proposal be presented in a manner, which will provide clarity, organization and cross referencing as required.

(4) Each evaluation factor shall be described in a separate section, appropriately tabbed in a report form. The information in all volumes shall be concise. Elaborate presentations are not necessary or desirable.

D. Proposal Content:

(1) The USG may award a contract based on initial proposals received, without discussion of such proposals, to the offeror providing the best value to the USG as evaluated using applicable factors. Accordingly, each initial proposal should be submitted on the most favorable terms from a price and technical standpoint that the offeror can submit to the USG. However, the USG may request additional information from offerors of proposals, which clarifies, supplements and/or changes, any proposal as submitted.

(2) If the offeror submits proposal revisions, during or after negotiations, the offeror shall provide a summary of changes that includes the appropriate volume, page number and paragraph where the change is located. Each proposal-changed page shall annotate the revision number (use sequential order) and date. All printed changed pages shall be submitted on a color of paper other than previously used for the original proposal and previous revisions. All printed and electronic proposal revision submissions shall clearly mark all changes by using the track changes feature within Microsoft Word, Microsoft Project and/or Microsoft Excel. The offeror shall clearly mark or highlight all changes. All electronic proposal revision submissions shall be conformed copies of the proposals. All proposal revision submissions shall be submitted to the CO in the same amount of copies as outlined above.

(3) The offeror shall, upon request from the USG, submit its final proposal without the changed page markings on white paper and mark all pages with “Final Proposal” and the submission date. The intent of the final proposal is to incorporate all previous changes, not to incorporate additional changes. All proposal revisions shall be represented as outlined in paragraph above.

CLAUSES INCORPORATED BY FULL TEXT

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

27 July 2010 @ 1000

(c) Participants will meet at--

Incirlik AB Turkey Bldg 485 (End of provision) Section M - Evaluation Factors for Award

SECTION M

M-01. BASIS FOR CONTRACT AWARD: The government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation is determined to be the lowest priced technically acceptable offeror with satisfactory performance. All technically acceptable offers shall be treated equally except for their prices and performance records. Failure to meet a requirement may result in an offer being determined technically unacceptable. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The evaluation process shall proceed as follows:

Technical Evaluation. Technical evaluation shall be rated on a Acceptable, Reasonably Susceptible of Being Made Acceptable, or Unacceptable basis, and determined based on submittal of acceptable documentation, certifications, and past performance. The proposals shall be evaluated against the following subfactors:

3. Quality Control: Contractor shall provide information that effectively represents their quality control program and methodology. The offeror’s quality control plan and methodology shall meet or exceed commercial standards routinely used by the construction industry for same or similar projects. Any innovative procedures or methods shall be explained in detail. This information shall provide the Government with no doubt of the offeror’s contract management and process improvement abilities.

4. Technical Capabilities: The offeror shall provide information that effectively represents their technical expertise and project management capabilities. All techniques and resources shall meet or exceed commercial standards routinely used by the construction industry for same or similar projects. Any innovative procedures or methods shall be explained in detail. As a minimum, offerors shall include:

a. A narrative to demonstrate a sound approach and methodology for accomplishing work requirements identified in the solicitation with the appropriate skills, equipment, and materials, in the appropriate quantities, and at the appropriate time to meet the Government’s desired outcomes. Each offeror shall also submit their proposed materials and procedures for the major elements of the project as listed below. The narrative and materials submittal shall provide the Government with no doubt of the offeror’s abilities to manage all resources required to perform the requirements outlined in this solicitation. The offeror’s proposed material listing shall be incorporated into any resultant contract.

(1) Electrical Works

b. A progress schedule for all major construction elements of this project based upon the offeror’s proposed performance period. Offerors shall use the attached AF Form 3064 or equivalent. All milestones shall be annotated with actual dates and a line graph. The offeror’s proposed performance period shall not exceed the performance period outlined in SF 1442, block 11. The progress schedule shall demonstrate the offeror’s technical capabilities and expertise. The Government shall be confident and have no doubt in the offeror’s ability to manage and complete all requirements within the proposed performance period.

c. A detailed shop drawing of the new generator protection and control system installation to be installed in accordance with the specifications of this project. The drawing shall include all dimensions and parts. The drawings shall represent the offerors technical capabilities and expertise to stand-by generators required in this solicitation. The narrative and materials submittal shall provide the Government with no doubt of the Contractor’s abilities to effectively plan and manage the installation of the all new electrical system.

d. Documentation (Resume, references), indicating that electrical engineer assigned to this project has a minimum of five years experience on LV electrical distribution systems , by-pass isolated automatic transfer switches and stand-by generators This engineer must be able to speak English and will be required to be present at the job site at all times when work is in progress.

e. Submit signed copy of QPL

Past Performance – Past performance shall be rated as satisfactory/unsatisfactory and evaluated based upon contractor-provided evidence of performance of contracts for work which is similar in type, scope, magnitude, and complexity to the work described in this solicitation. The Government reserves the right to seek past performance information from other sources, such as the Contraction Contractor Appraisal System (CCAS), Past Performance Information Retrieval System (PPIRS) or other sources known to the Government. Any additional information will be evaluated in the same manner as offeror supplied references.

The Government will rate the offerors past performance as follows:

Satisfactory:

The contractor has provided evidence, in the form of two (2) references, of successful contract performance within the last 3 years where the contractor is/was responsible for performing work similar in type, scope, magnitude and complexity to the work described in this solicitation.

Unsatisfactory:

The offeror has failed to provide evidence, in the form of two (2) references, of successful contract performance within the last 3 years where the contractor is/was responsible for performing work similar in type, scope, magnitude and complexity to the work described in this solicitation; or the past performance information sought and obtained by the Government reflects other than satisfactory performance by the offeror.

The standard for past performance is met when the offeror is determined to have satisfactory past performance.

Price – The offer will be evaluated on the total price of all Contract Line Item Numbers (CLINS) contained in the schedule. Failure to include all prices may exclude the offeror from further consideration for award, as the Government may award without discussions. However, the Government does reserve the right to conduct discussions. The standard for price is met when the price is determined fair and reasonable.

Successful offeror will be determined on the basis of best value resulting from the total assessment of the price and technical evaluation

File details come from the government source that posted it. Updated .