Specs_Carpet_IDIQ.pdf
PDF 1 MB Posted
- Attached to
- Carpet/Flooring IDIQ
- Solicitation number
- FA5685-10-R-0005
About this file
Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Carpet_IDIQ bid schedule.xls | XLS spreadsheet | |
| Request for Proposal FA5685-10-R-0005.pdf | ||
| Attach 6 - Bank Letter Guarantee | — | |
| Attachment 7 - Vendor Instructions for WAWF.doc | DOC document | |
| Pre-Proposal Reservation Form | — | |
| Pre-proposal Site Visit Announcement | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
FOR
REPAIR / MAINTAIN CARPET &
FLOORING, ID/IQ
INCIRLIK AIR BASE, TURKIYE
APRIL 2009
APPROVED
BY:__________________________________________________________________________
KENNETH J. COX, P.E. Chief of Engineering Design DATE
APPROVED
BY:__________________________________________________________________________
Contracting Officer DATE
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01110N SUMMARY OF WORK
01320A PROJECT SCHEDULE
01320N CONSTRUCTION PROGRESS DOCUMENTATION
01330 SUBMITTAL PROCEDURES
01351A SAFETY, HEALTH, AND EMERGENCY RESPONSE (HTRW/UST)
01355A ENVIRONMENTAL PROTECTION
01450A CHEMICAL DATA QUALITY CONTROL
01450N CONSTRUCTION QUALITY CONTROL
01451A CONTRACTOR QUALITY CONTROL
01500A TEMPORARY CONSTRUCTION FACILITIES
01525 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
01572 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01575N TEMPORARY ENVIRONMENTAL CONTROLS
01770N CLOSEOUT PROCEDURES
01780A CLOSEOUT SUBMITTALS
DIVISION 09 - FINISHES
09310 CERAMIC TILE, QUARRY TILE, AND PAVER TILE
09421A TERRAZZO TILE
09445A RESINOUS TERRAZZO FLOORING
09612N EPOXY MORTAR FLOORING SYSTEM FOR AIRCRAFT MAINTENANCE
FACILITIES
09640A WOOD STRIP FLOORING
09650 RESILIENT FLOORING
09670 FLUID-APPLIED FLOORING
09680A CARPET
DIVISION 13 - SPECIAL CONSTRUCTION
13280A ASBESTOS ABATEMENT
-- End of Project Table of Contents --
SECTION 01110N
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
Removal
1. Remove existing carpet and/or carpet tiles.
2. Remove existing floor tiles and/or PVC flooring.
3.
A. Remove and reinstall existing baseboards.
B. Replace damaged baseboards c/w paint or varnish.
C. Remove & apply paint or varnish and reinstall existing baseboards.
D. Remove existing baseboards.
4. Remove Asbestos flooring tiles. Provide all necessary equipment and disposal bags or boxes, to dispose of the materials.
5. Move furniture / equipment as required removing / installing flooring materials.
Provide & Install
6. Provide and install 7.5cm high laminated wood baseboards. (Alfa or approved equal - http://www.al-fa.com)
7. Provide and install 7.5cm high wood baseboards. (Serifoglu or approved equal - http://www.serifoglu.com.tr)
8. Provide and install brass or aluminum carpet edge strips. (MET-IS aluminum or approved equal - http://www.prometmetis.com.tr)
9. Provide and install ceramic baseboards.(7.5cm high, width depends on the selected ceramic)
10. Provide and install high quality ceramic baseboards. (7.5cm high, width depends on the selected ceramic)
11. Provide and install fire rated 100% nylon carpet. (Lees, Emerging Lights broadloom or approved equal - http://www.leescarpets.com)
12. Provide and install high quality fire rated 100% nylon carpet. (Lees, Haven broadloom or approved equal - http://www.leescarpets.com)
13. Provide and install fire rated 100% nylon carpet tiles. (Lees, Discovery Modular or approved equal - http://www.leescarpets.com)
14. Provide and install high quality fire rated 100% nylon carpet tiles.
(Lees, Attribute or Place Modular or approved equal -http://www.leescarpets.com)
15. Provide and install non-skid ceramic floor tiles and baseboard in required size. (Vitra Arkitekt RAL 7047 Antislip 30x30, Rezidans Scabos 33x33, Rezidans Patara 33x33 or equal - http://www.vitra.com.tr)
16. Provide and install high quality non-skid ceramic floor tiles and baseboard in required size. (Vitra Arkitekt RAL 000500 Dark Grey Mat, 60x60, Rezidans Toscany Classic 30x30, or equal http://www.vitra.com.tr )
17. Provide and install glossy ceramic floor tiles and baseboard in required size. (Vitra Rezidans Marbella 30x30, Arkitekt RAL 7047 Glossy 20x20 or equal - http://www.vitra.com.tr)
18. Provide and install high quality glossy ceramic floor tiles and baseboard in required size. (Vitra Rezidans Jazz 30x30, Rezidans Holywood 30x30, or equal - http://www.vitra.com.tr)
19. Provide and install glossy porcelain floor tiles and baseboard in required size. (Vitra Rezidans Microtec Cream Glossy 30x60, Rezidans Texture Stone Lappato Rektifiye Grey 45x45, Rezidans Ararat Lappato Rektifiye Beige 60x60 or equal - http://www.vitra.com.tr )
20. Provide and install non-skid porcelain floor tiles and baseboard in required size. (Vitra Rezidans Ararat Mat Dark Grey 60x60, Rezidans Arcadia L. Grey Mat Rektifiye 60x120 or equal http://www.vitra.com.tr)
21. Provide and install decorative mosaic floor tiles in required size.
22. Provide and install marble floor tiles in required size c/w border and baseboard. (baseboards shall be minimum 7.5cm high)
23. Provide and install granite floor tiles in required size c/w border and baseboard. (baseboards shall be minimum 7.5cm high)
24. Provide and install PVC flooring c/w baseboard. (Gerflor Nera Columbia or approved equal -http://www.gerflor.com.tr)
25. Provide and install high quality PVC flooring c/w baseboard. (Gerflor Elegance 290 or approved equal http://www.gerflor.com.tr)
26. Provide and install laminated wood flooring. (Camsan or Krono Saxon 31 Class or approved equal. Laminated wood shall be installed c/w Panetti rubber felt or approved equal - http://www.camsan.com.tr)
27. Provide and install high quality laminated wood flooring. (Berry Floor with recessed joint type, 32 Class or similar. Laminated wood shall be installed c/w Panetti rubber or approved equal. -http://www.berryfloor.be)
28. Provide and install one strips prefinished 3 layer (lamine) parquet floor. (Serifoglu - 1 Strip or approved equal. -http://www.serifoglu.com.tr)
29. Provide and install terrazzo tiles c/w baseboards.
30. Provide and install terra cota tiles c/w baseboards. (Kaleseramik 24x24x1.5 or approved equal -http://www.e-kale.com.tr)
31. Provide and install Epoxy flooring c/w baseboard (Multi layer).
32. Provide and install non-skid Epoxy flooring c/w baseboard (Multi layer).
33. Provide and install Epoxy paint with primer.
34. Repair floor cracks with Epoxy repair mortar.
35. Provide and install Epoxy self leveling mortar.
36. Provide and install HI-TECH flooring c/w primer.
(http://hitechflooring.com)
37. Provide and install C18 leveling concrete.
38. Provide and install C25 leveling concrete with steel towel finish.
Install (All materials required for installation shall be provided by Contractor.)
39. Install GFM (Government Furnished Material) 7.5cm high laminated wood / wood baseboards.
40. Install GFM (Government Furnished Material) brass or aluminum carpet / laminate / laminated wood edge strips.
41. Install GFM (Government Furnished Material) ceramic baseboards.
42. Install GFM (Government Furnished Material) fire rated 100% nylon carpet.
43. Install GFM (Government Furnished Material) fire rated 100% nylon carpet tiles.
44. Install GFM (Government Furnished Material) ceramic floor tiles and baseboard in required size.
45. Install GFM (Government Furnished Material) porcelain floor tiles and baseboard in required size.
46. Install GFM (Government Furnished Material) decorative mosaic tiles.
47. Install GFM (Government Furnished Material) marble floor tiles in required size c/w border and baseboard.
48. Install GFM (Government Furnished Material) granite floor tiles in required size c/w border and baseboard.
49. Install GFM (Government Furnished Material) PVC flooring and baseboard.
50. Install GFM (Government Furnished Material) laminated wood flooring.
(Laminated wood shall be installed c/w Panetti rubber felt or approved equal.)
51. Install GFM (Government Furnished Material) one strips prefinished 3 layer (lamine) parquet floor.
52. Install GFM (Government Furnished Material) terrazzo tiles.
53. Install GFM (Government Furnished Material) terra cota tiles.
54. Install GFM (Government Furnished Material) HI-TECH flooring c/w primer. (http://hitechflooring.com)
Provide
55. Provide 7.5cm high laminated wood baseboards. (Alfa or approved equal
- http://www.al-fa.com)
56. Provide 7.5cm high wood baseboards. (Serifoglu or approved equal -http://www.serifoglu.com.tr)
57. Provide brass or aluminum carpet edge strips. (MET-IS aluminum or approved equal http://www.prometmetis.com.tr)
58. Provide fire rated 100% nylon carpet. (Lees, Emerging Lights broadloom or approved equal - http://www.leescarpets.com, Klassis Ltd. Tel:
0212 2489777)
59. Provide high quality fire rated 100% nylon carpet. (Lees, Haven broadloom or approved equal - http://www.leescarpets.com, Klassis Ltd. Tel:
0212 2489777)
60. Provide fire rated 100% nylon carpet tiles. (Lees, Discovery Modular or approved equal - http://www.leescarpets.com, Klassis Ltd. Tel: 0212 2489777)
61. Provide high quality fire rated 100% nylon carpet tiles. (Lees, Attribute or Place Modular or approved equal - http://www.leescarpets.com, Klassis Ltd. Tel: 0212 2489777)
62. Provide non-skid ceramic floor tiles in required size. (Vitra Arkitekt RAL 7047 Antislip 30x30, Rezidans Scabos 33x33, Rezidans Patara 33x33 or equal - http://www.vitra.com.tr)
63. Provide high quality non-skid ceramic floor tiles in required size.
(Vitra Arkitekt RAL 000500 Dark Grey Mat, 60x60, Rezidans Toscany Classic 30x30, or equal http://www.vitra.com.tr )
64. Provide glossy ceramic floor tiles in required size. (Vitra Rezidans Marbella 30x30, Arkitekt RAL 7047 Glossy 20x20 or equal -http://www.vitra.com.tr)
65. Provide high quality glossy ceramic floor tiles in required size.
(Vitra Rezidans Jazz 30x30, Rezidans Holywood 30x30, or equal -http://www.vitra.com.tr)
66. Provide glossy porcelain floor tiles in required size. (Vitra Rezidans Microtec Cream Glossy 30x60, Rezidans Texture Stone Lappato Rektifiye Grey 45x45, Rezidans Ararat Lappato Rektifiye Beige 60x60 or equal - http://www.vitra.com.tr )
67. Provide non-skid porcelain floor tiles in required size. (Vitra Rezidans Ararat Mat Dark Grey 60x60, Rezidans Arcadia L. Grey Mat Rektifiye 60x120 or equal http://www.vitra.com.tr)
68. Provide decorative mosaic floor tiles in required size.
69. Provide marble floor tiles in required size c/w border and baseboard.
70. Provide granite floor tiles in required size c/w border and baseboard.
71. Provide PVC flooring. (Gerflor Nera Columbia or approved equal -http://www.gerflor.com.tr)
72. Provide high quality PVC flooring. (Gerflor Elegance 290 or approved equal - http://www.gerflor.com.tr)
73. Provide laminated wood flooring. (Camsan or Krono Saxon 31 Class or approved equal. -http://www.camsan.com.tr)
74. Provide high quality laminated wood flooring. (Berry Floor with recessed joint type, 32 Class or similar. - http://www.berryfloor.be)
75. Provide one strips prefinished 3 layer (lamine) parquet floor.
(Serifoglu - 1 Strip or approved equal. - http://www.serifoglu.com.tr)
76. Provide terrazzo tiles.
77. Provide terra cota tiles c/w baseboards. (Kaleseramik 24x24x1.5 or approved equal - http://www.e-kale.com.tr)
78. Provide HI-TECH flooring c/w primer. (http://hitechflooring.com)
1.1.2 Location
The work locations shall be Incirlik Air Base, Yumurtalik Sea Terminal, Ankara Support Facilities, Izmir 425 ABS Facilities and Eskisehir CAOCSIX Facilities. Locations shall be indicated in each delivery order.
1.1.3 Weather Delays
The performance period listed in the contract does not include expected weather delays. In accordance with FAR Clause 52.211-10 Commencement, Prosecution, and Completion of Work in this contract, the expected weather delays will be added when Contruction Notice to Proceed is issued using the chart below.
Historical Average Rain Days - Incirlik AB, Turkey (1973-2003)
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec #Days GE 0.01 9 9 9 8 6 3 1 1 2 5 6 10
Prior to issuing the notice proceed, the above chart will be used to determine the historical average number of rain days during the performance period. Then the Government and Contractor will agree on the expected total days of weather delays based on the total days of expected rain and taking into account weather impact to this type of project and rain days that will occur on non-working days. When the Contruction Notice to Proceed is issued, the performance period will include the original performance period plus plus the number of work days expected to be impacted by weather.
In order for the contract to be extended for severe weather under FAR Clause 52.249-10 Default (Fixed-Price Construction), the contractor must demonstrate that the total actual rain days during the project has exceeded the total historical average rain days for the project period which was determined prior to Construction Notice to Proceed.
Work in Restricted Areas
Contractors performing work in restricted areas will encounter temporary delays and full exclusion days due to mission requirements. The contractor should prepare their proposals and schedules with the expectation that there will be 8.5 work days of delays for every 50 scheduled calendar days during the total contract period. The Contractor will also experience shorter work hours due to access requirements in the morning and evening.
1.2 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.3 LOCATION OF UNDERGROUND FACILITIES
Obtain digging permits prior to start of excavation. Ensure that the related shops scan the construction site with electromagnetic or sonic equipment, and mark the surface of the ground, pier deck or paved surface where existing underground utilities or utilities encased in pier structures are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated to be specified or removed but indicated or discovered during scanning in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.3.1 Notification Prior to Excavation
Notify the Construction Management Office at least 48 hours prior to starting excavation work.
1.4 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
Materials that shall be furnished by Government and installed by Contractor will be indicated in each delivery order
1.4.1 Delivery Schedule
Notify the Contracting Officer in writing at least 10 calendar days in advance of the date on which the materials and equipment are required. Pick up materials and equipment no later than 30 calendar days after such date.
1.4.2 Delivery Location
The materials and equipment shall be located at the BCE Material Control Yard.
-- End of Section --
SECTION 01320A
PROJECT SCHEDULE
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of the specification to the extent referenced. The publications are referenced in the text by basic designation only.
ER 1-1-11 (1995) Progress, Schedules, and Network Analysis Systems
1.2 QUALIFICATIONS
The Contractor shall designate an authorized representative who shall be responsible for the preparation of all required project schedule reports.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
A Project Schedule as described below shall be prepared. The scheduling of construction shall be the responsibility of the Contractor. Contractor management personnel shall actively participate in its development. The approved Project Schedule shall be used to measure the progress of the work and to aid in evaluating time extensions
3.2 PROJECT SCHEDULE
The computer software system utilized by the Contractor to produce the Project Schedule shall be capable of providing all requirements of this specification. Failure of the Contractor to meet the requirements of this specification shall result in the disapproval of the schedule. Manual methods used to produce any required information shall require approval by the Contracting Officer.
3.2.1 Use of the Critical Path Method
The Critical Path Method (CPM) of network calculation shall be used to generate the Project Schedule. The Contractor shall provide the Project Schedule in the Precedence Diagram Method (PDM).
3.2.2 Level of Detail Required
The Project Schedule shall include an appropriate level of detail. Failure to develop or update the Project Schedule or provide data to the Contracting Officer at the appropriate level of detail, as specified by the Contracting Officer, shall result in the disapproval of the schedule. The Contracting Officer will use, but is not limited to, the following conditions to determine the appropriate level of detail to be used in the Project Schedule:
3.2.2.1 Activity Durations
Contractor submissions shall follow the direction of the Contracting Officer regarding reasonable activity durations. Reasonable durations are those that allow the progress of activities to be accurately determined.
3.2.2.2 Procurement Activities
Tasks related to the procurement of long lead materials or equipment shall be included as separate activities in the project schedule. Long lead materials and equipment are those materials that have a procurement cycle of over 90 days. Examples of procurement process activities include, but are not limited to: submittals, approvals, procurement, fabrication, and delivery.
3.2.2.3 Critical Activities
The following activities shall be listed as separate line activities on the Contractor's project schedule:
a. Submission and approval of mechanical/electrical layout drawings.
b. Submission and approval of O & M manuals.
c. Submission and approval of as-built drawings.
d. Submission and approval of testing and air balance (TAB).
e. Submission of TAB specialist design review report.
f. Submission and approval of fire protection specialist.
g. Submission and approval of testing and balancing of HVAC plus commissioning plans and data.
h. Air and water balance dates.
i. HVAC commissioning dates.
j. Controls testing plan.
k. Controls testing.
l. Performance Verification testing.
m. Other systems testing, if required.
n. Prefinal inspection.
o. Correction of punchlist from prefinal inspection.
p. Final inspection.
3.2.2.4 Modification or Claim Number
Any activity that is added or changed by contract modification or used to justify claimed time shall be identified by a mod or claim code that changed the activity. Activities shall not belong to more than one modification or claim item. The modification or claim number of each activity shall be identified by the Mod or Claim Number. Whenever possible, changes shall be added to the schedule by adding new activities.
Existing activities shall not normally be changed to reflect modifications.
SECTION 01320N
CONSTRUCTION PROGRESS DOCUMENTATION
PART 1 GENERAL
1.1 SUBMITTALS
Submit the following in accordance with Section 01330, "Submittal Procedures."
Construction schedule
Equipment delivery schedule
1.2 CONSTRUCTION SCHEDULE
Prior to the start of work, prepare and submit to the Contracting Officer for acceptance a construction schedule in the form of a Critical Path Method (CPM) in accordance with the terms in Contract Clause "FAR 52.236-15, Schedules for Construction Contracts," except as modified in this contract.
1.3 EQUIPMENT DELIVERY SCHEDULE
1.3.1 Initial Schedule
Within 30 calendar days after acceptance of the proposed construction schedule, submit for Contracting Officer acceptance a schedule showing procurement plans for materials and equipment. Submit in the format and content as prescribed by the Contracting Officer, and include as a minimum the following information:
a. Description.
b. Date of the purchase order.
c. Promised shipping date.
d. Name of the manufacturer or supplier.
e. Date delivery is expected.
f. Date the material or equipment is required, according to the current construction schedule.
1.4 UPDATED SCHEDULES
Update the construction schedule and equipment delivery schedule at monthly intervals or when the schedule has been revised. Reflect any changes occurring since the last update. Submit copies of the purchase orders and confirmation of the delivery dates as directed.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
SECTION 01330
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal
Shop drawings, product data, samples, operation and maintenance data,and administrative submittals presented for review and approval. Contract Clauses "FAR 52.236-5, Material and Workmanship," paragraph (b) and "FAR 52.236-21, Specifications and Drawings for Construction," paragraphs (d), (e), and (f) apply to all "submittals."
1.1.2 Types of Submittals
All submittals are grouped as follows:
a. Shop drawings: As used in this section, drawings, schedules, diagrams, and other data prepared specifically for this contract, by contractor or through contractor by way of subcontractor, manufacturer, supplier, distributor, or other lower tier contractor, to illustrate portion of work.
b. Product data: Preprinted material such as illustrations, standard schedules, performance charts, instructions, brochures, diagrams, manufacturer's descriptive literature, catalog data, and other data to illustrate portion of work, but not prepared exclusively for this contract.
c. Samples: Physical examples of products, materials, equipment, assemblies, or workmanship that are physically identical to portion of work, illustrating portion of work or establishing standards for evaluating appearance of finished work or both.
d. Operation and Maintenance (O&M) Data:
Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel.
This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
The data is required when the item is delivered to the project site.
e. Administrative submittals: Data presented for reviews and approval to ensure that administrative requirements of project are adequately met but not to ensure directly that work is in accordance with design concept and in compliance with contract documents.
1.2 SUBMITTAL IDENTIFICATION
Submittals required are identified by titles as follows:
Preconstruction Submittals
Construction Progress Schedule.
Submittal register.
Health and safety plan.
Work plan.
Quality control plan.
Environmental protection plan.
Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
Samples
Physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
Design Data
Calculations, mix designs, analyses or other data pertaining to a part of work.
Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports
Daily checklists
Final acceptance test and operational test procedure
Certificates
Statements signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a supplier, installer or subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.
Confined space entry permits.
Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and Material Safety Data sheets concerning impedances, hazards and safety precautions.
Manufacturer's Field Reports
Documentation of the testing and verification actions taken by manufacturer's representative to confirm compliance with manufacturer's standards or instructions.
Factory test reports.
Operation and Maintenance Data
Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel. This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.
Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
1.2.1 Approving Authority
Person authorized to approve submittal.
1.2.2 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.3 PROCEDURES FOR SUBMITTALS
1.3.1 Reviewing, Certifying, Approving Authority
The Contracting Officer shall be responsible for reviewing and certifying that submittals are in compliance with contract requirements.
1.3.2 Constraints
a. Submittals listed or specified in this contract shall conform to provisions of this section, unless explicitly stated otherwise.
b. Submittals shall be complete for each definable feature of work;
components of definable feature interrelated as a system shall be submitted at same time.
c. When acceptability of a submittal is dependent on conditions, items, or materials included in separate subsequent submittals, submittal will be returned without review.
d. Approval of a separate material, product, or component does not imply approval of assembly in which item functions.
1.3.3 Scheduling
a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential requirements to resubmit.
b. Except as specified otherwise, allow review period, beginning with receipt by approving authority, that includes at least 15 working days for submittals for approval. Period of review for submittals begins when Government receives submittal from the Contractor. Period of review for each resubmittal is the same as for initial submittal.
1.3.4 Variations
Variations from contract requirements require Government approval pursuant to contract Clause entitled "FAR 52.236-21, Specifications and Drawings for Construction" and will be considered where advantageous to government.
1.3.4.1 Considering Variations
Discussion with contracting officer prior to submission, will help ensure functional and quality requirements are met and minimize rejections and resubmittals.
1.3.4.2 Proposing Variations
When proposing variation, deliver written request to the contracting officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to government. If lower cost is a benefit, also include an estimate of the cost saving. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.
1.3.4.3 Warranting That Variations Are Compatible
When delivering a variation for approval, contractor warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.
1.3.4.4 Review Schedule Is Modified
In addition to normal submittal review period, a period of 10 working days will be allowed for consideration by the Government of submittals with variations.
1.3.5 Contractor's Responsibilities
a. Determine and verify field measurements, materials, field construction criteria; review each submittal; and check and coordinate each submittal with requirements of the work and contract documents.
b. Transmit submittals to Contracting Office to prevent delays in the work, delays to government, or delays to separate contractors.
c. Advise contracting officer of variation, as required by paragraph entitled "Variations."
d. Correct and resubmit submittal as directed by approving authority. When resubmitting disapproved transmittals or transmittals noted for resubmittal, the contractor shall provide copy of that previously submitted transmittal including all reviewer comments for use by approving authority. Direct specific attention in writing or on resubmitted submittal, to revisions not requested by approving authority on previous submissions.
e. Furnish additional copies of submittal when requested by contracting officer, to a limit of 20 copies per submittal.
f. Complete work which must be accomplished as basis of a submittal in time to allow submittal to occur as scheduled.
g. Ensure no work has begun until submittals for that work have been returned as "approved," except to the extent that a portion of work must be accomplished as basis of submittal.
1.3.6 Government's Responsibilities
When approving authority is Contracting Officer, the Government will:
a. Note date on which submittal was received from the Contractor, on each submittal for which the contracting officer is approving authority.
b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.
c. Identify returned submittals with one of the actions defined in paragraph entitled "Actions Possible" and with markings appropriate for action indicated.
1.3.7 Actions Possible
Submittals will be returned with one of the following notations:
a. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required , does not have evidence of being reviewed and approved by contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by contractor or for being incomplete, with appropriate action, coordination, or change.
b. Submittals marked "approved" "approved as submitted" authorize contractor to proceed with work covered.
c. Submittals marked "revise and resubmit" or "disapproved" indicate submittal is incomplete or does not comply with design concept or requirements of the contract documents and shall be resubmitted with appropriate changes. No work shall proceed for this item until resubmittal is approved.
1.4 FORMAT OF SUBMITTALS
1.4.1 Transmittal Form
Transmit each submittal, except sample installations and sample panels, to office of approving authority. Transmit submittals with transmittal form prescribed by Contracting Officer and standard for project. The transmittal form shall identify Contractor, indicate date of submittal, and include information prescribed by transmittal form and required in paragraph entitled "Identifying Submittals." Process transmittal forms to record actions regarding sample panels and sample installations.
1.4.2 Identifying Submittals
Identify submittals, except sample panel and sample installation, with the following information permanently adhered to or noted on each separate component of each submittal and noted on transmittal form. Mark each copy of each submittal identically, with the following:
a. Project title and location.
b. Construction contract number.
c. Section number of the specification section by which submittal is required.
d. Submittal description of each component of submittal.
e. When a resubmission, add alphabetic suffix on submittal description, for example, 10A, to indicate resubmission.
f. Product identification and location in project.
1.4.3 Format for Shop Drawings
a. Shop drawings shall not be less than A4 (297 by 210 mm) nor more than AO (1189 by 841 mm).
b. Present A4 (297 by 210 mm) sized shop drawings as part of the bound volume for submittals required by section. Present larger drawings in sets.
c. Include on each drawing the drawing title, number, date, and revision numbers and dates, in addition to information required in paragraph entitled "Identifying Submittals."
d. Dimension drawings, except diagrams and schematic drawings;
prepare drawings demonstrating interface with other trades to scale. Shop drawing dimensions shall be the same unit of measure as indicated on the contract drawings. Identify materials and products for work shown.
1.4.4 Format of Product Data
a. Present product data submittals for each section as a complete, bound volume. Include table of contents, listing page and catalog item numbers for product data.
b. Indicate, by prominent notation, each product which is being submitted; indicate specification section number and paragraph number to which it pertains.
c. Supplement product data with material prepared for project to satisfy submittal requirements for which product data does not exist. Identify this material as developed specifically for project.
1.4.5 Format of Samples
a. Furnish samples in sizes below, unless otherwise specified or unless the manufacturer has prepackaged samples of approximately same size as specified:
(1) Sample of Equipment or Device: Full size.
(2) Sample of Materials Less Than 50 by 75 mm: Built up to A4 (297 by 210 mm).
(3) Sample of Materials Exceeding A4 (297 by 210 mm): Cut down to A4 (297 by 210 mm) and adequate to indicate color, texture, and material variations.
(4) Sample of Linear Devices or Materials: 250 mm length or length to be supplied, if less than 250 mm. Examples of linear devices or materials are conduit and handrails.
(5) Sample of Non-Solid Materials: 750 ml. Examples of non-solid materials are sand and paint.
(6) Color Selection Samples: 50 by 100 mm.
(7) Sample Panel: 1200 by 1200 mm.
(8) Sample Installation: 10 square meters.
b. Samples Showing Range of Variation: Where variations are unavoidable due to nature of the materials, submit sets of samples of not less than three units showing extremes and middle of range.
c. Reusable Samples: Incorporate returned samples into work only if so specified or indicated. Incorporated samples shall be in undamaged condition at time of use.
d. Recording of Sample Installation: Note and preserve the notation of area constituting sample installation but remove notation at final clean up of project.
e. When color, texture or pattern is specified by naming a particular manufacturer and style, include one sample of that manufacturer and style, for comparison.
1.4.6 Format of Operation and Maintenance (O&M) Data
a. O&M Data format shall comply with the requirements specified in Section 01781, Operation and Maintenance Data"
1.4.7 Format of Administrative Submittals
a. When submittal includes a document which is to be used in project or become part of project record, other than as a submittal, do not apply contractor's approval stamp to document, but to a separate sheet accompanying document.
1.5 QUANTITY OF SUBMITTALS
1.5.1 Number of Copies of Shop Drawings
a. Submit three copies of submittals of shop drawings requiring review and approval.
1.5.2 Number of Copies of Product Data
Submit product data in compliance with quantity requirements specified for shop drawings.
1.5.3 Number of Sampless
a. Submit one sample showing range of variation, of each required item.
b. Submit one sample panel. Include components listed in technical section or as directed.
c. Submit one sample installation, where directed.
d. Submit one sample of non-solid materials.
1.5.4 Number of Copies of Operation and Maintenance Data
Submit three copies of O&M Data to the Contracting Officer for review and approval
1.5.5 Number of Copies of Administrative Submittals
a. Unless otherwise specified, submit administrative submittals compliance with quantity requirements specified for shop drawings.
SECTION 01351A
SAFETY, HEALTH, AND EMERGENCY RESPONSE (HTRW/UST)
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ANSI Z358.1 (1998) Emergency Eyewash and Shower Equipment
API Pub 2219 (1999) Safe Operation of Vacuum Trucks in Petroleum Service
API RP 1604 (1996) Closure of Underground Petroleum Storage Tanks
API Std 2015 (2001) Requirements for Safe Entry and Cleaning of Petroleum Storage Tanks
10 CFR 20 Standards for Protection Against Radiation
29 CFR 1904 Recording and Reporting Occupational Injuries and Illnesses
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1910.120 Hazardous Waste Operations and Emergency Response
29 CFR 1926 Safety and Health Regulations for Construction
29 CFR 1926.65 Hazardous Waste Operations and Emergency Response
49 CFR 171 General Information, Regulations, and Definitions
49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements
EM 385-1-1 (1996) U.S. Army Corps of Engineers Safety and Health Requirements Manual
ER 385-1-95 (2003) Safety and Health Requirements for Ordnance and Explosives (OE) Operations
NIOSH 85-115 (1985) Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities
1.2 DESCRIPTION OF WORK
This section requires contractors to implement practices and procedures for working safely and in compliance with OSHA and USACE regulation while performing cleanup activities on uncontrolled hazardous waste sites.
1.3 REGULATORY REQUIREMENTS
Work performed under this contract shall comply with EM 385-1-1, OSHA requirements in 29 CFR 1910 and 29 CFR 1926, especially OSHA's Standards 29 CFR 1926.65 and 29 CFR 1910.120 and OSHA requirements where applicable.
Matters of interpretation of standards shall be submitted to the Contracting Officer for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements shall apply.
1.4 PRECONSTRUCTION SAFETY CONFERENCE
A preconstruction safety conference shall be conducted prior to the start of site activities and after submission of the contractor's APP/SSHP. The objective of the meeting will be to discuss health and safety concerns related to the impending work, discuss project health and safety organization and expectations, review and answer comments and concerns regarding the APP/SSHP or other health and safety concerns the contractor may have. The Contractor shall ensure that those individuals responsible for health and safety at the project level are available and attend this meeting.
1.5 ACCIDENT PREVENTION PLAN/SITE SAFETY AND HEALTH PLAN (APP/SSHP)
The Contractor shall develop and implement a Site Safety and Health Plan that shall be attached to the Accident Prevention Plan (APP) as an appendix (APP/SSHP). The APP/SSHP shall address all occupational safety and health hazards (traditional construction as well as contaminant-related hazards) associated with cleanup operations. The APP/SSHP shall cover each SSHP element in section 28.A.01 of EM 385-1-1 and each APP element in Appendix A of EM 385-1-1. There are overlapping elements in Section 28.A.01 and Appendix A of EM 385-1-1. SSHP appendix elements that overlap with APP elements need not be duplicated in the APP/SSHP provided each SOH issue receives adequate attention and is documented in the APP/SSHP. The APP/SSHP is a dynamic document, subject to change as project operations/execution change. The APP/SSHP will require modification to address changing and previously unidentified health and safety conditions.
It is the Contractor's responsibility to ensure that the APP/SSHP is updated accordingly.
1.5.1 Acceptance and Modifications
Prior to submittal, the APP/SSHP shall be signed and dated by the Safety and Health Manager and the Site Superintendent. The APP/SSHP shall be submitted for review 10 days prior to the Preconstruction Safety Conference. Deficiencies in the APP/SSHP will be discussed at the preconstruction safety conference, and the APP/SSHP shall be revised to correct the deficiencies and resubmitted for acceptance. Onsite work shall not begin until the plan has been accepted. A copy of the written APP/SSHP shall be maintained onsite. Changes and modifications to the accepted APP/SSHP shall be made with the knowledge and concurrence of the Safety and Health Manager, the Site Superintendent, and the Contracting Officer.
Should any unforeseen hazard become evident during the performance of the work, the Site Safety and Health Officer (SSHO) shall bring such hazard to the attention of the Safety and Health Manager, the Site Superintendent, and the Contracting Officer for resolution as soon as possible. In the interim, necessary action shall be taken to re-establish and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public, and the environment. Disregard for the provisions of this specification or the accepted APP/SSHP shall be cause for stopping work until the matter has been rectified.
1.5.2 Availability
The APP/SSHP shall be made available in accordance with 29 CFR 1910.120, (b)(1)(v) and 29 CFR 1926.65, (b)(1)(v).
1.6 TASK SPECIFIC HAZARDS, INITIAL PPE, HAZWOPER MEDICAL SURVEILLANCE AND
TRAINING APPLICABILITY
It is the Contractor's responsibility to reevaluate occupational safety and health hazards as the work progresses and to adjust the PPE and onsite operations, if necessary, so that the work is performed safely and in compliance with occupational safety and health regulations.
1.7 STAFF ORGANIZATION, QUALIFICATION AND RESPONSIBILITIES
1.7.1 Safety and Health Manager
The Safety and Health Manager shall have the following qualifications:
a. A minimum of 3 years experience in developing and implementing safety and health programs at hazardous waste sites or at underground storage tank removal projects.
b. Documented experience in supervising professional and technician level personnel.
c. Documented experience in developing worker exposure assessment programs and air monitoring programs and techniques.
d. Documented experience in managing personal protective equipment programs and conducting PPE hazard evaluations for the types of activities and hazards likely to be encountered on the project.
e. Working knowledge of occupational safety and health regulations.
2). The Safety and Health Manager shall:
a. Be responsible for the development, implementation, oversight, and enforcement of the APP/SSHP.
b. Sign and date the APP/SSHP prior to submittal.
c. Conduct initial site-specific training.
d. Be present onsite during the first 3 days of remedial activities and at the startup of each new major phase of work.
e. Visit the site as needed and at least once per week for the duration of activities, to audit the effectiveness of the APP/SSHP.
f. Be available for emergencies.
g. Provide onsite consultation as needed to ensure the APP/SSHP is fully implemented.
h. Coordinate any modifications to the APP/SSHP with the Site Superintendent, the SSHO, and the Contracting Officer.
i. Provide continued support for upgrading/downgrading of the level of personal protection.
j. Be responsible for evaluating air monitoring data and recommending changes to engineering controls, work practices, and PPE.
k. Review accident reports and results of daily inspections.
l. Serve as a member of the Contractor's quality control staff.
1.7.2 Site Safety and Health Officer
An individual shall be designated the Site Safety and Health Officer (SSHO). The name, qualifications (education and training summary and documentation), and work experience of the Site Safety and Health Officer shall be included in the APP/SSHP.
1). The SSHO shall have the following qualifications:
a. A minimum of 1 year experience in implementing safety and health programs at hazardous waste sites or at underground storage tank removal projects.
b. Documented experience in construction techniques and construction safety procedures.
c. Working knowledge of occupational safety and health regulations.
d. Specific training in personal and respiratory protective equipment, confined space entry and in the proper use of air monitoring instruments and air sampling methods including monitoring for ionizing radiation.
2). The Site Safety and Health Officer shall:
a. Assist and represent the Safety and Health Manager in onsite training and the day to day onsite implementation and enforcement of the accepted APP/SSHP.
b. Be assigned to the site on a full time basis for the duration of field activities. The SSHO can have collateral duties in addition to Safety and Health related duties.
c. Have authority to ensure site compliance with specified safety and health requirements and OSHA regulations and all aspects of the APP/SSHP including, but not limited to, activity hazard analyses, air monitoring, monitoring for ionizing radiation, use of PPE, decontamination, site control, standard operating procedures used to minimize hazards, safe use of engineering controls, the emergency response plan, confined space entry procedures, spill containment program, and preparation of records by performing a daily safety and health inspection and documenting results on the Daily Safety Inspection Log in accordance with 29 CFR 1904.
d. Have authority to stop work if unacceptable health or safety conditions exist, and take necessary action to re-establish and maintain safe working conditions.
e. Consult with and coordinate any modifications to the APP/SSHP with the Safety and Health Manager, the Site Superintendent, and the Contracting Officer.
f. Serve as a member of the Contractor's quality control staff on matters relating to safety and health.
g. Conduct accident investigations and prepare accident reports.
h. Conduct daily safety inspection and document safety and health findings into the Daily Safety Inspection Log. Track noted safety and health deficiencies to ensure that they are corrected.
i. In coordination with site management and the Safety and Health Manager, recommend corrective actions for identified deficiencies and oversee the corrective actions.
1.8 TRAINING
The Contractor's training program for workers performing cleanup operations and who will be exposed to contaminants shall meet the following requirements.
1.8.1 General Hazardous Waste Operations Training
All Personnel performing duties with potential for exposure to onsite contaminants shall meet and maintain the following 29 CFR 1910.120/ 29 CFR 1926.65 (e) training requirements:
a. 40 hours of off site hazardous waste instruction.
b. 3 days actual field experience under the direct supervision of a trained, experienced supervisor.
c. 8 hours refresher training annually.
Onsite supervisors shall have an additional 8 hours management and supervisor training specified in 29 CFR 1910.120/29 CFR 1926.65 (e) (4).
1.8.2 Pre-entry Briefing
Prior to commencement of onsite field activities, all site employees, including those assigned only to the Support Zone, shall attend a site-specific safety and health training session. This session shall be conducted by the Safety and Health Manager and the Site Safety and Health Officer to ensure that all personnel are familiar with requirements and responsibilities for maintaining a safe and healthful work environment.
Procedures and contents of the accepted APP/SSHP and Sections 01.B.02 and 28.D.03 of EM 385-1-1 shall be thoroughly discussed. Each employee shall sign a training log to acknowledge attendance and understanding of the training. The Contracting Officer shall be notified at least 5 days prior to the initial site-specific training session so government personnel involved in the project may attend.
1.8.3 Periodic Sessions
Periodic onsite training shall be conducted by the SSHO at least weekly for personnel assigned to work at the site during the following week. The training shall address safety and health procedures, work practices, any changes in the APP/SSHP, activity hazard analyses, work tasks, or schedule;
results of previous week's air monitoring, review of safety discrepancies and accidents. Should an operational change affecting onsite field work be made, a meeting prior to implementation of the change shall be convened to explain safety and health procedures. Site-specific training sessions for new personnel, visitors, and suppliers shall be conducted by the SSHO using the training curriculum outlines developed by the Safety and Health Manager. Each employee shall sign a training log to acknowledge attendance and understanding of the training.
1.8.4 Other Training
Special site specific training requirements: Site specific training for sites where radioactive wastes are to be cleaned up include:
a. Site specific procedures for handling and storing radioactive…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .