PWS Draft App F - ITM reports nomenclature.pdf

PDF 693 KB Posted

Attached to
Fire Protection System Maintenance and Repair Service, Aviano and Ghedi AB
Solicitation number
FA568224Q0009
Issued by

About this file

This document is a draft Performance Work Statement (PWS) Appendix F that details the file naming convention and content requirements for the Inspection, Testing, and Maintenance (ITM) reports for the fire protection systems at Aviano and Ghedi Air Bases in Italy.

The PWS Appendix F provides mandatory guidelines for the ITM report file nomenclature, including required fields such as building number, date, ITM type, system description, and additional description if needed. The report types range from weekly to 12-year intervals. This document is referenced in the associated federal contract opportunity, Solicitation Number FA568224Q0009, which is a pre-solicitation notice for Fire Protection System Maintenance and Repair services at the two Air Bases. The U.S. Government intends to release a Request for Quote (RFQ) for these services under a firm-fixed price commercial contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

O P T I O N A L "Bldg#" " " "Bldg Number" " ‐ " "YYYY MM DD" " ‐ " "ITM Type" " ‐ " "System Description" "Additional Description" Fixed part one space only

As indicated in PWS Appendix A e.g.

910_9

1360_HQ

one space, dash, one space

Date Year (4 digits), one space, Month (2 digits), one space, day (2 digits) one space, dash, one space

The options are following

WEEKLY

MONTHLY

QUARTERLY

SEMIANNUAL

ANNUAL

2 YEARS

3 YEARS

5 YEARS

10 YEARS

12 YEARS

one space, dash, one space

As indicated in PWS Appendix A

All lowercase except the first letter of each word e.g.

Automatic Fire Detection System

Fire Pump System Clean Agent Extinguishing Systems Dry Chemical Suppression System

If needed, additional short description can be added e.g.

if for the two dry sprinkler system the contractor prefer to fill up two reports instead of one, the additional description will be "East Overhang " and "West Overhang " e.g.

Bldg# 110 ‐ 2022 10 17 ‐ SEMIANNUAL ‐ Automatic Fire Detection System Bldg# 1420 ‐ 2022 12 07 ‐ ANNUAL ‐ Deluge Sprinkler System

APPENDIX F

MAINTENANCE AND REPAIR OF FIRE PROTECTION SYSTEMS

AT AVIANO AND GHEDI ABs, ITALY

M A N D A T O R Y

ITM reports ‐ File Nomenclature PWS par. 1.3.1.4.

DRAFT

File details come from the government source that posted it. Updated .