ASHE 19-1035 CCEB Rev1.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- FA568220R0010
About this file
This document contains a cost estimate breakdown and related federal contract opportunity notice. The cost estimate breakdown provides line item details for repair work to walls and floors at Sierra Pass Area F on Aviano Air Base in Italy. The work includes internal wall painting, drain pit cover replacement, adding static ground points, applying new epoxy resin flooring across 13 passageways totaling 10,270 square meters, and installing 5,850 linear meters of elastic joints. The related federal contract opportunity is solicitation number FA568220R0010 for the ASHE 19-1035 repair walls and floors project at Sierra Pass Area F at Aviano Air Base in Italy. The project magnitude is estimated between $250,000 to $500,000. A site visit is scheduled and interested firms should use the watch list feature to receive updates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA568220R00100001 SF 30.pdf | ||
| ASHE 19 1035 SOW Rev1.doc | DOC document | |
| horizontal signs.pdf | ||
| Solicitation - FA568220R0010.pdf | ||
| ASHE 19-1035 Sierra PASs MAP.pdf | ||
| ASHE 19-1035 Material Submittal Schedule.doc | DOC document | |
| ASHE 19 1035 Technical Specifications.doc | DOC document | |
| ASHE 19-1035 CCEB FY20.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISION 1 CONTRACTOR COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
| CONTRACT FOR (Work to be performed) | PROPOSED CONTRACT PRICE | ||||
| ASHE 19-1035 REPAIR FLOOR AND WALLS, SIERRA PASs, AREA F | |||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | ASHE 19-1035 REV1 | WORK LOCATION | SIERRA LOOP area F |
| MATERIAL PLUS LABOR COST | |||||||
| UNIT | OTHER | ||||||
| LINE | ITEM | OF | QUANTITY | UNIT | TOTAL | DIRECT | LINE |
| NO | MEASURE | COSTS | TOTAL |
(1) (2) (3) (4) (5) (9) (10)
| 3.1 INTERNAL WALL PAINTING, DRAIN PIT COVER, STATIC GROUND POINTS IN S65&66 | ||||
| 3.1.a | SURFACE PREPARATION | Sq.Mt. | 4,600 | |
| 3.1.b | ANTI-RUST TREATMENT | Sq.Mt. | 4,600 | |
| 3.1.c | PRIMER | Sq.Mt. | 4,600 | |
| 3.1.d | FINAL COAT | Sq.Mt. | 4,600 | |
| 3.1.e | COVER EXISTING DRAIN PITS | EA | 4 | |
| 3.1.f | NEW STATIC GROUND POINTS | EA | 4 | |
| subTOTAL euro |
| 3.2 NEW EPOXY RESIN FLOOR (all 13ea PASs) | ||||
| 3.2.a | SAND FLOOR SURFACE AND VACUUM | Sq.Mt. | 10,270 | |
| 3.2.b | PRIMER | Sq.Mt. | 10,270 | |
| 3.2.c | THREE-COMPONENT "CONTRO SPINTA" | Sq.Mt. | 10,270 | |
| 3.2.d | FIRST COAT OF RESIN AND ANTI-SKID QUARTZ | Sq.Mt. | 10,270 | |
| 3.2.e | SECOND COAT OF EPOXY RESIN | Sq.Mt. | 10,270 | |
| 3.2.f | ANTI-SCRATCH OPAQUE FINISHING WITH QUARTZ | Sq.Mt. | 10,270 | |
| 3.2.g | COLORED STRIPING AND MARKING | L.ump Sum | 2 | |
| subTOTAL euro |
| 3.3 ELASTIC JOINTS (all 13ea PASs) | ||||
| 3.3.a | ELASTIC JOINT SEAL | Lin.Mt. | 5,850.00 | subTOTAL euro |
TOTAL euro
File details come from the government source that posted it. Updated .