This document contains a material submittal schedule and solicitation for a federal construction contract. The schedule outlines items including anti-rust primer, final paint, resin treatment, and elastic joints that will require submittals such as shop drawings, samples, certifications, and warranty information from the contractor. The related solicitation is for repairs to walls and floors at Sierra Passs, Area F of Aviano Air Base in Italy, with an estimated value between $250,000 and $500,000. Interested vendors must hold a current Statement of Adequacy certification in category OS06 and/or OS07 from the Italian Ministry of Defense. The solicitation includes information on a mandatory site visit and provides the address for the base. Responses are due by the date specified in the solicitation issued by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa.

View the file

Other files

File Type Posted
Solicitation Amendment FA568220R00100001 SF 30.pdf PDF
ASHE 19 1035 SOW Rev1.doc DOC document
ASHE 19-1035 CCEB Rev1.xlsx XLSX spreadsheet
horizontal signs.pdf PDF
Solicitation - FA568220R0010.pdf PDF
ASHE 19-1035 Sierra PASs MAP.pdf PDF
ASHE 19 1035 Technical Specifications.doc DOC document
ASHE 19-1035 CCEB FY20.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER

ASHE 19-1035

PROJECT TITLE

REPAIR WALLS AND FLOOR, SIERRA PASs - Area F

SOLICITATION CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER
TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

REQUIRED SUBMISSION DATE
DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENCE

DATE

SUBMITTAL NUMBERS

CONTRACTOR RESUBMITTAL
FINAL APPROVAL

LINE NUMBER

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
CERTIFICATION OF COMPLIANCE
SHOP DRAWING
SAMPLES
COLOR SELECTION
MANUFACTURER’S RACOMMENDATIONS
MANUFACTURER’S WARRANTY
CATALOG DATA
OPERATING INSTRUCTIONS
MSDS & QUANTITIES
CALCULATIONS

DATE CONTRACTOR

NOTIFIED

REMARKS

APPROVED
DIS-APPROVED
3.1.b
Anti-rust primer

X

X

3.1.c.
Final paint

X

X

3.2.

b to f Resin Treatment

X

X

3.3
Elastic joints

X

X

AFForm 66, OCT 89