ASHE 19-1035 Material Submittal Schedule.doc
DOC document 58 KB Posted
- Solicitation number
- FA568220R0010
About this file
This document contains a material submittal schedule and solicitation for a federal construction contract. The schedule outlines items including anti-rust primer, final paint, resin treatment, and elastic joints that will require submittals such as shop drawings, samples, certifications, and warranty information from the contractor. The related solicitation is for repairs to walls and floors at Sierra Passs, Area F of Aviano Air Base in Italy, with an estimated value between $250,000 and $500,000. Interested vendors must hold a current Statement of Adequacy certification in category OS06 and/or OS07 from the Italian Ministry of Defense. The solicitation includes information on a mandatory site visit and provides the address for the base. Responses are due by the date specified in the solicitation issued by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA568220R00100001 SF 30.pdf | ||
| ASHE 19 1035 SOW Rev1.doc | DOC document | |
| ASHE 19-1035 CCEB Rev1.xlsx | XLSX spreadsheet | |
| horizontal signs.pdf | ||
| Solicitation - FA568220R0010.pdf | ||
| ASHE 19-1035 Sierra PASs MAP.pdf | ||
| ASHE 19 1035 Technical Specifications.doc | DOC document | |
| ASHE 19-1035 CCEB FY20.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
ASHE 19-1035
PROJECT TITLE
REPAIR WALLS AND FLOOR, SIERRA PASs - Area F
SOLICITATION CONTRACT NUMBER
| TO BE COMPLETED BY PROJECT ENGINEER |
| TO BE COMPLETED BY CONTRACT ADMINISTRATOR |
NUMBER OF COPIES REQUIRED
| REQUIRED SUBMISSION DATE |
| DATE RECEIVED IN |
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN SUSPENCE
DATE
SUBMITTAL NUMBERS
| CONTRACTOR RESUBMITTAL |
| FINAL APPROVAL |
LINE NUMBER
| ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL |
| CERTIFICATION OF COMPLIANCE |
| SHOP DRAWING |
| SAMPLES |
| COLOR SELECTION |
| MANUFACTURER’S RACOMMENDATIONS |
| MANUFACTURER’S WARRANTY |
| CATALOG DATA |
| OPERATING INSTRUCTIONS |
| MSDS & QUANTITIES |
| CALCULATIONS |
DATE CONTRACTOR
NOTIFIED
REMARKS
| APPROVED |
| DIS-APPROVED |
| 3.1.b |
| Anti-rust primer |
X
X
| 3.1.c. |
| Final paint |
X
X
3.2.
b to f Resin Treatment
X
X
| 3.3 |
| Elastic joints |
X
X
AFForm 66, OCT 89
MATERIAL SUBMITTAL SCHEDULE