ASHE 19 1035 Technical Specifications.doc

DOC document 3 MB Posted

Attached to
ASHE 19-1035 REPAIR WALLS AND FLOORS SIERRA PASs, AREA F, AVIANO AB, ITALY
Solicitation number
FA568220R0010
Issued by

About this file

This document provides technical specifications for a federal construction contract opportunity to repair walls and floors at protective aircraft shelters in Aviano Air Base, Italy. The scope of work includes surface preparation and application of new concrete floor treatments, internal wall painting, and installation of elastic joints in 13 protective aircraft shelters. Contractors must be certified in construction categories OS06 and/or OS07 and have a magnitude of work between $250,000 to $500,000. The specifications define requirements for floor and wall surface preparation, materials, painting, epoxy resin treatments, anti-skid surfacing, striping, and elastic joint installation. A site visit is scheduled for interested vendors to inspect the work areas. The solicitation number is FA568220R0010 and is issued by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa for the 31st Fighter Wing at Aviano Air Base, Italy.

View the file

Other files

File Type Posted
Solicitation Amendment FA568220R00100001 SF 30.pdf PDF
ASHE 19 1035 SOW Rev1.doc DOC document
ASHE 19-1035 CCEB Rev1.xlsx XLSX spreadsheet
horizontal signs.pdf PDF
Solicitation - FA568220R0010.pdf PDF
ASHE 19-1035 Sierra PASs MAP.pdf PDF
ASHE 19-1035 Material Submittal Schedule.doc DOC document
ASHE 19-1035 CCEB FY20.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: Oct 2019

U.S. AIR FORCE

31ST FIGHTER WING

31ST CES/CEPM

AVIANO AIR BASE, ITALY

TECHNICAL SPECIFICATIONS FOR

ASHE 19-1035 REPAIR WALLS AND FLOOR SIERRA PASs

AREA F, AVIANO AB, ITALY

1. SCOPE OF WORK

The Contractor shall furnish all manpower, equipment, materials and transportation to restore 13 Protective Aircraft Shelters (PAS) in SIERRA area:

S51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 65, 66.

Work includes:

a. Floor surface preparation and new concrete pavements treatment with high thickness multi-layer treatment epoxy resin, minimum 2.6 mm thick, with anti-skid surface, RAL 9002 in all 13ea PASs.

b. Wall Surface preparation and paint internal walls and bottom wall with white color paint only in PAS S65, 66.

2.

WORK SITE CONDITIONS

2.a.

The Contractor is permitted to use reasonable quantities of available electricity and water at the work site. The Contractor shall alter characteristics and shall observe conservation practices at all times. All connections shall be the responsibility of the Contractor including restorations to initial conditions. Interruption of utilities: Utilities shall not be interrupted until approval is received from the Contracting Officer. Any such need shall be requested in writing by the Contractor at least 10 days in advance of the needed interruption. Requests for utility interruption shall indicate the type of utility to be interrupted, the type of operation requiring the interruption, date and duration. To the maximum extent possible interruption shall be scheduled on week ends or U.S. holidays in order to minimize impact to base activities.

2.b.

Work during week ends or holidays may be requested by the Contractor with a minimum of 10 days advance notice, however the Contracting Officer has the right to deny such request if reasons requiring week end and holiday work are not valid or for security or other necessities.

2.c.

Toilet facilities in the vicinity of the work site shall be available for Contractor use. The Contractor shall use facilities in a manner to maintain their state of cleanliness and hygiene.

2.d.

If welding is to be performed the Contractor shall ensure a welding permit is obtained from the Aviano Air Base Fire Department prior to performing welding operations.

2.e.

The Contractor shall not use base refuse containers to discard debris. All construction debris shall be discarded by the Contractor off base at authorized sites according to category of debris/refuse in strict observance of all host country laws, decrees and local regulations in force.

2.f.

The Contractor shall be responsible for ensuring all personnel engaged in the performance of this contract observe all host country laws concerning safety and in particular Italian laws D.M. 81/08.

2.h.

Before works start, contractor will submit a detail works schedule to C.O. for coordination and approval.

2.i Works must be performed in restricted areas, contractor will be escorted all time.

2.l Contractor must perform the works only 2ea PASs at the time; when two PASs are completed and usable, Contractor will be allowed to start the next 2 PASs.

3. WORK DESCRIPTION

EACH ITEM OF THE SCHEDULE IS INCLUSIVE OF FURNISHING AND INSTALLATION OF MATERIALS AND EQUIPMENT, SCAFFOLDING, TRANSPORTATION TO DUMP OR STORAGE OF DEMOLISHED AND/OR REMOVED MATERIALS, IN ACCORDANCE WITH CONTRACTING OFFICER'S INSTRUCTIONS AND ALL FINISHING WORK REQUIRED TO MAKE EACH ITEM COMPLETE IN A WORKMANLIKE MANNER.

ALL THE QUANTITIES THAT ARE INDICATED OR SUCCESSIVELY ADDED, ARE ESTIMATES. THEREFORE THE GOVERNMENT SHALL BE NOT HELD RESPONSIBLE FOR THE ACCURACY OF THE ESTIMATED QUANTITIES. THE CONTRACT REQUIRES A COMPLETED PROJECT ON A LUMP SUM BASIS. IT IS THEREFORE THE RESPONSIBILITY OF THE CONTRACTOR TO CALCULATE, FORESEE AND PERFORM ALL QUANTITIES AND WORK NECESSARY EVEN IF NOT MENTIONED IN THE SPECIFICATIONS BUT INCLUDED IN THE DRAWINGS OR MANIFESTLY NECESSARY TO DELIVER A COMPLETE PROJECT BASED ON ITS OVERALL SCOPE.

3.1 Internal walls painting (S65 and 66)

Works will include:

a. Surface preparation and mechanical cleaning. Item will include Jet blast cleaning of all the walls, including the rear wall on the bottom, Mechanical cleaning of all rusted parts and calcium deposits including bolts and nuts.

b. Application of Anti-rust bi- component on rusted parts.

c. Application of Primer on the walls including the rear bottom wall and door; finishing coat white color including the rear bottom wall. Paint will be synthetic paint, applicable with solvent, Type "Arreghini OKAPA" or equivalent, color white, specific weight 1380 gr/Lt, excellent adhesion to old paint, Perfectly washable with common detergents, suitable to cover smoke and carbon residuals, perfect anchorage on strong alkaline materials.

Each PAS 2,300 Sq.Mt.

Total 4,600 Sq.Mt Special Notes:

· Before to start the paint process, the surface must be exempt from condense.

· It is required the accurate protection of all the equipments as electrical, mechanical, air ducts, fire alarm, Communication etc. before starting of works.

· Use of water IS NOT available in the vicinity. A water tank provided by the contractor will be necessary.

· Electricity 220V and 3ph400V IS NOT available in some PASs; Contractor must provide an electric generator.

· Square Meters to be painted is intended the longitudinal development of the lateral curved walls plus the rear bottom wall and door.

3.2 Internal floor epoxy treatment (all 13 PASs)

Works will include:

a) Mechanical shoot blasting of floor surface up to 2.0mm, to remove rough resin treatment, oil residual, superficial finishes of nude industrial floor and to prepare an adequate surface for resin application. Item includes Removal and dumping to authorized dump of removed resin material and debris and dust vacuum

b) Supply and installation of primer coating;

c) Supply and installation of one layer of tri-components epoxy resin treatment “controspinta” via spatula (no via roll), including Surface smoothing and dust vacuum;

d) Supply and installation of first layer of tri-components epoxy resin treatment via spatula (no via roll) adding corundum (same size of all other PASs) to create antiskid surface, including surface smoothing and surplus corundum vacuum;

e) Supply and installation of second layer of tri-components epoxy resin treatment via spatula (no via roll), including Surface smoothing and dust vacuum;

f) Supply and installation of final layer of tri components epoxy resin treatment “scratch proof” via spatula (no via roll); Final coating will be added with corundum antiskid mesh same size of all other PASs;

g) Floor striping performance using not reflective painting, different colors, (same pattern as present on the majority of the PASs).

790 Sq.Mt. Each PAS floor

Total Surface 10,270Sq.Mt.

Special Notes:

· Prior to start the resin process, Contractor shall prepare and submit for approval 3ea floor sample, cm 50x50, with the anti-skid surface R9, R10 and R11.

· Use of water IS NOT available in the vicinity. A water tank provided by the contractor will be necessary.

· Electricity 220V and 3ph 400V IS NOT available in some PASs; Contractor must provide an electric generator.

· Contractor shall perform the resin works and joints seal as prescribed by the manufacturer technical instructions and as suggested by Ente Nazionale CONPAVIPER.

· The color to use is RAL 9002.

3.3 Elastic Joints on epoxy floor

Works will include:

a. Joint re-performance by saw cutting, joint cleaning and application of elastic appropriate material on the joint (roll or other specific mean is authorized); Joints must be hydrocarbon resistant.

b. All the elastic joints must be exposed, not covered with resin.

450 Lin.Mt. Each PAS floor

Total Lin.Mt 5,850.

c. ADDITIONAL REQUIREMENTS

a) Works will be executed in accordance with following norms:

· UNI 7158 Determinazione dell’indice di contaminabilita’ di superfiecie di materie plastiche o rivestite con prodotti vernicianti.

· UNI 7998 Edilia – Pavimentazioni - Terminologia

· UNI 7999 Edilizia – Pavimentazioni Analisi dei requisiti

· UNI 8380 Edilizia – Strati del supporto di pavimentazione – Analisi dei requisiti

· UNI 8381 Edilizia – Strati del supporto di pavimentazione – Istruzioni per la progettazione e l’esecuzione

· UNI 8297 Rivestimenti resinosi per pavimentazione - Terminologia

· UNI 8298-1…. UNI 8298-16 Rivestimenti resinosi per pavimentazioni

· UNI 8636 Rivestimenti resinosi per pavimentazione – Significativita’ delle caratteristiche

· UNI 10329 Posa dei rivestimenti di pavimentazione – Misurazione del contenuto di umidita’ negli strati di supporto cementizi o simili

· UNI 10966 Rivestimenti resinosi per pavimentazioni – Istruzioni per la progettazione e l’esecuzione.

b) Once issued NTP, Contractor is required to contact CEAOR (0434-305691) and schedule a meeting to fill Form DD1354 with appropriate project data for real property capitalization (blank DD1354 and category codes list CATCODE_LIST_2010 are available at CENM office during duty hours). Contractor is required to provide final Form DD1354 for 31CES/CD signature before contract close out.

4. QUANTITY TABLE

SIERRA PAS #
WALLS SURFACE (bottom included) Sq.Mt.
EPOXY FLOOR SURFACE (Sq.Mt.)
FLOOR ELASTIC JOINTS (Lin.Mt.)
S65
2300
790
450
S66
2300
790
450
S51
N/A
790
450
S52
N/A
790
450
S53
N/A
790
450
S54
N/A
790
450
S55
N/A
790
450
S56
N/A
790
450
S57
N/A
790
450
S58
N/A
790
450
S59
N/A
790
450
S60
N/A
790
450
S61
N/A
790
450
TOTALS
4,600
10,270
5,850

Project # ASHE 19-1035