ASHE 17-1000 Tech. Specifications REV 02 JUN 2018

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project # ASHE 17-1000 Technical Specifications

DATE: JUNE 2018

31CES/CENM

U.S. AIR FORCE

31ST FIGHTER WING

31ST CES/CENM

AVIANO AIR BASE, ITALY

TECHNICAL SPECIFICATION

REVISION 02

ASHE 17-1000

MAINTAIN AIRFIELD MARKINGS NORTH, AREA F

AVIANO AB, ITALY

31CES/CENM

SCOPE OF WORK. The Contractor shall provide all management, tools, templates, supplies, equipment, transportation and qualified personnel necessary to paint or remove paint from various areas of the entire surface of the North side of the airfield and minor areas of the airfield South. The contractor shall follow specifications stated in section 02761 – Pavements Markings, Attachment #

3. The contractor shall assure that before spraying paint the surface will be clean and dry to guarantee 100% adherence. Additionally the contractor shall assure that when painting over previously coated areas, to take special care to remove any loose or peeling paint.

a. The Airfield North includes, but is not limited to, Mike Loop, Sierra Loop, North Hot Pit

Refueling area, Victor Area, Both Arm/De-arm Pads, Strat Pads 1, 2, 3, Hangars 1, 2, 3, North

Ramp, Alpha Taxiway, Alpha 1 – 4 taxiways (including Hold Short Lines), and all other areas located inside the airfield North of the runway.

b. White and yellow colors shall be refractive (rifrangente) type, red color will be semi-refractive type while black color will not be reflective type. The colors shall match the existing colors on the pavement and shall be of the correct thickness, length, and width as per the instructions specified ETL 04-2, attachment # 1.

c. The contractor shall paint all lines, shapes, areas, numbers, letters, and any other markings on the pavement to include multiple yellow and / or black circular markings (aircraft grounding points) in the area of work. If any markings in the pavement include numbers and / or letters, the contractor shall paint the numbers shown on the pavement or as directed by the Airfield

Manager.

d. The contractor shall completely obliterate pavement marking lines and areas at various locations in the area of work. If any markings cannot be obliterated, they will be painted black in a manner that prevents the ability to understand in the marking, such as painting a rectangle over an “X”.

e. At some locations, any pavement markings in the airfield may be slightly modified at the request of the Airfield Manager or Project Manager.

f. The contractor shall follow all specifications for paint application per ETL 04-2, (par. 5.3.1 –

5.3.5), Attachment # 2.

g. Contractor shall notify Project Manager timely before work starts in order to coordinate escorts, access to airfield and work to be performed.

h. The site shall be clean and free of debris at all times and debris collected on the spot which shall be disposed before the end of every workday.

i. Supplies and materials shall be stored in an area designated by the Airfield Manager. No flammable products will be allowed in temporary storage area. The area will be under Contractor responsibility and it will be fenced, secured and identified with proper sign, company name and phone number.

j. At the end of each working day the contractor will provide an electronic daily work progress report to the Project Manager showing quantity of work performed for each single area.

31CES/CENM

2. WORK LOCATION

31CES/CENM

1. WORK SITE CONDITIONS

a) The work area is located within Airfield. Escort from GVT personnel will be required at all times. Before works performance, Contractor will submit a detailed work schedule to be approved by Project Manager.

b) Before work starts, Contractor in coordination with the facility manager will provide for

C.O. approval a detailed plan for access limitation, and for every other activity that may limit normal operations.

c) The Contractor is permitted to use reasonable quantities of electricity and water where approved by Project Manager, in all other areas the Contractor will provide electric generator and water tanks if necessary. The Contractor shall not alter characteristics and shall observe conservation practices at all times.

d) Authorized work hours and days. Performance of work hereunder shall be from Monday through Saturday excluding holidays from 08.00 to 17.00 hours. Work during holidays may be requested by the Contractor with a minimum of 10 days advance notice, however the Contracting

Officer has the right to deny such request if reasons requiring holiday work are not valid or for security or other necessities.

e) Toilet facilities shall be available for Contractor use as located by Project Manager. The

Contractor shall use facilities in a manner to maintain their state of cleanliness and hygiene.

f) The Contractor shall not use base refuse containers to discard debris. All paint removal and construction debris shall be disposed by the Contractor off base at authorized sites according to category of debris / refuse in strict observance of all national laws, decrees and local regulations in force.

g) The Contractor shall be responsible for ensuring all personnel engaged in the performance of this contract observe all national laws concerning safety. At all times the Contractor will assure all personnel are wearing the correct safety equipment when performing their work, such as hard hats, steel toe boots, gloves, reflective gear and any other equipment deemed necessary to perform their work in the safest way. The Contractor shall also assure all personnel comply with

Italian laws DM. 81/08. A copy of the Piano Operativo di Sicurezza (POS) will be provided to

31FW/SE (ph. 0434-307476) after contract award.

h) Performance of this project is limited to Airfield areas requiring escort at all times and this shall be considered during development of the work schedule. The Government will not be held liable for unproductive time and other related costs due to the delays in access / exit, to / from the restricted areas or unannounced and immediate suspension of the work due to military operations and / or exercises or safety reasons. The Government will only negotiate an equitable extension of the performance period based on documented delays and unannounced suspension of work.

i) Smoking on site is prohibited for all contractor personnel.

31CES/CENM

2. WORK DESCRIPTION:

Each item of the schedule is inclusive of furnishing and installation of materials and equipment, transportation to dump, and storage of demolished and / or removed materials, in accordance with contracting officer’s instructions and all finishing work required to make each item complete in a workmanlike manner.

All the quantities that are indicated or successively added are estimates. Therefore the government shall not be held responsible for the accuracy of the estimated quantities. The contract requires a completed project on a lump sum basis. It is therefore the responsibility of the contractor to calculate, foresee and perform all quantities and work necessary even if it not mentioned in the specifications but included in the drawings or manifestly necessary to deliver a complete project based on its overall scope.

a) SURFACE PREPARATION: Contractor shall clean / wash / prepare all surfaces prior to painting as needed. Contractor shall remove all dirt, loose old paint particles (spolvero), accumulations of old paint, rubber, grease, oil, and other foreign substances from all surfaces which are to be painted including new markings. All work shall be performed using proper equipment and any other work to provide a job in a workmanlike manner. This is to be included in the painting

b) REFRACTIVE PAINTING: Contractor shall paint all existing / new small / large areas (Hold lines), letters, numbers, shapes, symbols, signs, arrows, and lines with refractive paint Yellow

RAL 1007 and White RAL 9016. The paint will be suitable for concrete and asphalt surfaces, high adherence and high resistance to abrasion, wear, environmental agents, fuels and oils including chemical / superficial crumbling (sgretolamento) resistance to bituminous surfaces.

The contractor shall follow paint manufacturer technical specification when mixing glass beads with paint to achieve the desired mixture for refractive purposes. Painting equipment will be capable of spraying for a width of 10 – 50 cm, each coat of paint must homogenous, uniform and of a constant layer of about 180 - 200 micron, edges in general must be clean-straight without any over-spraying (sbavatura). The lines width will be strictly 6” / 15 cm wide even if existing lines are wider. Paint will be lead components free, type “Spartitraffico Rifrangente Giallo, serie

8530.0028 /.0344” for yellow, “Spartitraffico Rifrangente Bianco serie 8530.0395” for white, Colorificio Sammarinese or similar approved to include any item required to give the job in a workmanlike manner and in accordance with regulatory requirements.

Yellow and white paints shall conform to UNI EN 1436 / 2008:

- Luminance factor / fattore di luminanza B: = > 40 yellow, = > 60 white.

- Night visibility / visibilita` notturna Rl wet conditions = > 20 yellow, = > 30 white.

- Daily visibility / riflessione luce giorno Qd; = > 200 yellow and white.

- Resistance to slip / coefficente di attrito: = > 55 SRT yellow, = > 45 SRT white

- Drying time / tempo di essicazione: 15’-20’ with air temperature 10° – 40° Celsius.

- Specific weight Kg/lt: 1.710 +- 0.030 yellow, 1.720 +- 0.070 white

- % Bioxide of titanium / biossido di titanio: 14.3% +- 0.2 only white

- % Glass beads / micro-sfere di vetro: 30% +- 0.5 yellow, 30-33% white

- Reflective index / indice rifrazione microspere: 1.51 yellow and white

31CES/CENM

Estimated quantities:

1) Yellow 6” / 15cm wide continuous / broken Line – 42,300 LM

2) Yellow 3’ / 91 cm wide continuous Shoulder Line – 2,000 LM

3) White 6” / 15cm wide Continuous / broken Line – 1,300 LM

4) White 50cm wide Continuous Line – 600 LM

5) White / yellow 12 cm wide Continuous / broken Line – estimated quantities: 513 LM and

130 dots 10 cm diameter in Victor loop area (see Map attachment # 1)

c) SEMI-REFRACTIVE PAINTING: Contractor shall paint all existing / new signs, and lines with Red RAL 3020. The paint will be suitable for concrete and asphalt surfaces, high adherence, high resistance to abrasion, wear, environmental agents, fuels and oils including chemical / superficial crumbling (sgretolamento) resistance to bituminous surfaces. The contractor shall follow paint manufacturer technical specification when mixing glass beads with paint to achieve the desired mixture for refractive purposes. Painting equipment will be capable of spraying for a width of 10 – 50 cm, each coat of paint must homogenous, uniform and of a constant layer of about 180 - 200 micron, edges in general must be clean-straight without any over-spraying

(sbavatura). The lines width will be strictly 6” / 15 cm wide even if existing lines are wider. Paint will be lead components free, type “Spartitraffico Semi-rifrangente serie 8530.0385” Colorificio

Sammarinese, or similar approved to include any item required to give the job in a workmanlike manner and in accordance with regulatory requirements.

- Luminance factor / fattore di luminanza B: = > 0.07 red.

- Resistance to slip / coefficente di attrito: = > 45 SRT red.

- Drying time / tempo di essicazione: 15’-20’ with air temperature 10° – 40° Celsius.

- Specific weight Kg/lt: 1.600 +- 0.50 red.

- % Glass beads / micro-sfere di vetro: 20% + - 0.5 red.

- Reflective index / indice rifrazione microspere: 1.51 red.

Estimated quantities:

6) Red 6” / 15cm wide continuous Line – 1600 mt

7) Red 50 cm wide continuous Line – 100 mt

d) NON - REFRACTIVE PAINTING: Contractor shall paint some existing / new, small / large areas (Hold lines), background of signs and lines with non-refractive Black RAL 9017. All taxitrack centerlines to the aprons shall be highlighted with black paint on both sides of the line whether existing or not. The paint will be suitable for concrete and asphalt surfaces, high adherence, high resistance to abrasion, wear, environmental agents, fuels and oils including chemical / superficial crumbling (sgretolamento) resistance to bituminous surfaces. Painting equipment will be capable of spraying for a width of 10 – 50 cm, each coat of paint must homogenous, uniform and of constant layer of about 180 - 200 micron, edges in general must be clean-straight without any over-spraying (sbavatura). The lines width will be strictly 6” / 15 cm wide even if existing lines are wider. Paint will be lead components free, type “Spartitraffico

Nero, serie 8510.0099, Colorificio Sammarinese or similar approved to include any item required to give the job in a workmanlike manner and in accordance with regulatory requirements.

31CES/CENM

- Luminance factor / fattore di luminanza: = < 0.03 black .

- Specific weight Kg/lt: 1.438 + - 0.040 black

- Drying time / tempo di essicazione: 20’-25’ with air temperature 10° – 40° Celsius.

8) Black 6” / 15cm wide Continuous Line – 10,000 LM

9) Black area painting – 1,000 m²

e) SIGNS: Contractor shall paint all existing / new letters, numbers, shapes, symbols and signs with paints described above in par. 4.b, 4.c and 4.d. Each coat of paint must homogenous, uniform and of a constant layer of about 180 - 200 micron, edges in general must be clean-straight without any over-spraying (sbavatura). All signs shall be bilingual, English and Italian, and shall be clearly spelled and painted using reflective paint with proper existing colors and dimensions on pavement or as directed by Airfield Manager, including any item required to give the job in a workmanlike manner and in accordance with regulatory requirements. See photos and details of signs in Attachment # 4.

10) 24 Danger Signs (bilingual): 130 cm X 58 cm

11) 48 Warning Signs (bilingual): 51cm X 38cm

12) 34 Flight Line Lettering

13) 14 Pilot Aid boxes: 61 x 61 cm

14) 2 “STOP” lettering

15) 29 “STOP CHECK FOD” lettering

16) 4 “ENTRY CONTROL POINT” lettering with 50cm white background

f) REMOVAL OF PAINT: Contractor shall remove pavement paint from various sections of the airfield North. The contractor shall ensure that no solvents or chemical components will be used on asphalted surfaces. All paint removal shall be done by high pressure water blasting as the situation dictates. All paint removed shall be properly disposed either by vacuum, dusting, or through any other method to ensure that no paint / concrete or asphalt residue is left on the pavement surface. Removal of paint shall include disposal and any other charge required to perform the job in a workmanlike manner and in accordance with regulatory requirements.

17) Paint Removal Area, 200 cm wide lines / signs = 100 m²

18) Paint Removal Continuous 15 cm wide lines = 400 LM

g) TEMPLATES: Contractor shall provide all eventual templates and tools needed to paint all the different signs and logos on the airfield. After contract award and before construction of templates the contractor shall coordinate with the Project manager or Airfield Manager for approval. The templates will be kept by the Contractor at the end of the project.

31CES/CENM

3. NOTES

a. A copy of Paint removed (Par. 4.e) record of disposal (Formulario) will be provided to Project

Manager before the end of the project.

b. General estimated quantities by area, yellow, white, red, 6” / 15 cm lines wide in linear meters.

- Sierra loop 7,477 mt.

- Taxi Way Alpha; 8,130 mt.

- Alpha-1: 457 mt.

- Alpha-2: 500 mt.

- Alpha-3: 987 mt.

- Alpha-4: 606 mt.

- Mike loop: 4,527 mt.

- Hanger 1: 755 mt.

- Hanger 2: 528 mt

- Hanger 3: 1,500 mt.

- North ramp: 1,341 mt.

- Strat-Pad-1: 769 mt.

- Strat-Pad -2: 772 mt.

- Strat-Pad-3:1,003 mt.

- Hot Pit Refueling: 670 mt

- Arm / Dearm Pad: 1,676 mt.

- B. 1163: 300 mt.

4. ATTACHMENTS

1. ETL 04-2

2. ETL 04-2, (par. 5.3.1 – 5.3.5)

3. Pavement Markings 02761 Specification

4. Markings Diagram

5. Material Submittal Register

6. Airfield Markings Plan

7. ETL 04-2 Standard Airfield Pavement Marking Schemes, with Change 2

8. UFC_3_260_01

9. AFI 32-1042

10. Helicopter Markings Dimension Plan

31CES/CENM

5. SUBMITTALS

a. Contractor must provide the following submittals within their Bid documents.

1. Product Data Sheets for each of the products proposed to be used for the project.

b. Contractor must submit during on-site construction the following.

1. Daily Construction Reports. To be completed for everyday work is performed on site and to be completed for any day the contractor is unable to perform work on site due to weather or Government delay stating justification for delay. The daily reports may be issued on a weekly basis.

c. Contractor must provide the following submittals within 15 days of completion of on-site

1. As-built drawings in DWG. (AutoCAD 2004) and PDF. CAD must meet base CAD standards as stated in the Aviano Design Guide.

2. Warranty Letter for all construction works performed, 1 Digital (PDF) and 1 Hardcopy.

3. Operations and Maintenance Manuals, 1 Digital (PDF) and 3 Hardcopy.

31CES/CENM

ATTACHMENT # 1

ETL 04-2

Taxiway Centerline Width

7. Taxiway and Apron Markings.

7.1. Taxiway and taxi lane Centerline Stripe. Mark the centerline of all taxiways, guidelines on runways, and taxi lanes on aprons and pads with a single continuous 152-millimeter (6-inch) wide yellow stripe.

31CES/CENM

Deceptive Markings

9.3.2. Taxiway and Apron Shoulders. Mark deceptive surfaces on the edges of taxiways and aprons with perpendicular stripes as shown in Figure 18. These markings consist of a series of

914-millimeter (3-foot) wide stripes positioned perpendicular to the edge markings. On curves, a stripe is placed at each point of tangency and intermediate stripes are spaced uniformly up to 9 meters (30 feet) apart. Figure 18 shows the dimensions and spacing of the stripes. Stripes are located so that the inner edge of the marking is coincident with the edge of the full-strength pavement.

VFR/INST Runway Holding Position

31CES/CENM

7.2 Both VFR and instrument holding positions are marked from edge to edge of the pavement surface, including paved shoulders.

7.2.2.1. This hold position is configured differently from a VFR hold position and is augmented with the letters "INST" on the runway side of the line. The letters are to be read when facing the runway. They are marked in block letters 1829 millimeters (6 feet) high by 610 millimeters (2 feet) wide, spaced 305 millimeters (1 foot) apart. The letters are formed with a 152-millimeter (6-inch) stroke. The "INST" designator must be placed symmetrically between the taxiway centerline and the taxiway edge or edge marking on the left side of the centerline. For hold lines over 61 meters (200 feet) long, mark the "INST" designator at intervals not exceeding 45.7 meters (150 feet).

Taxiway/lane/track Edge Stripes

7.3.2. This marking consists of two 152-millimeter (6-inch) wide broken stripes separated by a gap 152 millimeters (6 inches) wide.

31CES/CENM

ATTACHMENT # 2

5.3.1. Paint.

5.3.1.1. Fully Cured Pavement. Apply paint at a wet film thickness of 0.305 millimeter to 0.356 millimeter (12 mils to 14 mils) for a desired dry film thickness of approximately 0.203 millimeter (8 mils). This thickness is needed to properly bind retroreflective beads in the paint. At this rate, coverage will be approximately 3 square meters per liter (121 square feet per gallon).

5.3.1.2. New Pavement. If new pavement surfaces must be opened to operations before being allowed to fully cure, apply temporary markings on new pavement at an application rate that will result in a dry film thickness of

0.102 millimeter to 0.152 millimeter (4 mils to 6 mils); this will produce a marking of sufficient prominence to allow operations. Touch up the marking in the event of bleeding, and remark the pavement at the normal application rate after the pavement is thirty days old.

5.3.2. Apply thermoplastics and preformed reflective tape in accordance with the manufacturer's instructions.

5.3.3. Apply retro reflective media (glass beads) at approximately 3.6 kilograms to

3.9 kilograms per 11.2 square meters (8 pounds to 9 pounds per gallon of paint or 121 square feet) of marked surface area.

5.3.4. Painted markings should not be allowed to build up beyond a total thickness of approximately 1.02 millimeters (40 mils). This will occur after about five marking cycles unless surface abrasion (such as can be caused by snow- removal equipment) reduces this buildup. Over-painting will cause the marking to eventually crack and peel.

5.3.5. To minimize hook-skip potential, ensure paint buildup does not exceed 3.1 millimeters (0.125 inch) within 61 meters (200 feet) on either side of the aircraft arresting system pendant.