FA568218R0033_0001.pdf

PDF 40 KB Posted

Attached to
SUSTAIN MENSA PARKING LOT, AREA F, AVIANO AB, AVIANO (PN), ITALY
Solicitation number
FA568218R0033
Issued by

About this file

AMENDMENT FA568218R0033 0001

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F1F3A28085A006 ASHE 17-1015

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to:

- incorporate Addendum #1 to the Technical Specif ications;

- replace the Construction Cost Estimate Breakdow n w ith Construction Cost Estimate Breakdow n Revision 1

- extend the performance period;

- extend the closing date for receitp of offers as indicated in the below Summary of Changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-May-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA568218R0033

X 9B. DATED (SEE ITEM 11)

17-May-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-May-2018

CODE

31 CONS LGC - FA5682

VIA PORDENONE 89/B, AREA "E" EDIF. 600

BASE AEREA DI AVIANO

AVIANO (PN) 33081

FA5682 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA568218R0033

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 31-May-2018 04:00 PM to 05-Jun-2018 04:00 PM.

The offeror acceptance period has decreased by 5 from 122 to 117.

The contractor period of performance end date has increased by 30 days from 60 days to 90 days.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,

SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN: TECHNICAL SPECIFICATIONS FOR PROJECT ASHE 17-1015 SUSTAIN MENSA PARKING LOT, AREA F, AVIANO AB, AVIANO (PN), ITALY, DATED MAY 2018- 78 WRITTEN PAGES

INCLUDING COVER PAGE, ATTACHMENTS AND APPLICABLE SECTIONS OF MASTER

SPECIFICATIONSC. ADDITIONAL REQUIREMENTS DATED MAY 2018 - 3

WRITTEN PAGES

To:

THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,

SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN: TECHNICAL SPECIFICATIONS FOR PROJECT ASHE 17-1015 SUSTAIN MENSA

PARKING LOT, AREA F, AVIANO AB, AVIANO (PN), ITALY AND ADDENDUM #1, BOTH MARKED

TECHNICAL SPECIFICATIONS AND DATED MAY 2018.-79 WRITTEN PAGES INCLUDING COVER

PAGE, ATTACHMENTS, APPLICABLE SECTIONS OF MASTER SPECIFICATIONS AND ADDENDUM

#1C. ADDITIONAL REQUIREMENTS REVISION 1, DATED MAY 2018-3 WRITTEN PAGES

SECTION F - DELIVERIES OR PERFORMANCE

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

LIST OF ATTACHMENTS – CONSTRUCTION CONTRACTS

The following documents are attachments to this document and are an integral part hereof:

a. Attachment 1:

Technical Specifications for ASHE 17-1015 Sustain Mensa Parking Lot Area F, Aviano AB, Aviano (PN), Italy and Addendum #1 both marked Technical Specifications and dated May 2018

- 79 pages including cover page, Attachments, applicable Sections of Master Specifications and Addendum #1

b. Attachment 2:

Additional Requirements Revision 1, dated May 2018 -3 pages

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

L-01. OFFER PREPARATION INSTRUCTIONS

To assure timely and equitable evaluation of offers, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements.

The following documents constitute the offer, failure to submit any of the below documents may be cause for rejection of the offer:

1. PRICE OFFER

(a) Complete blocks 14, 15, 16, 19 (only if amendments are issued) and 20A through 20C of the Section A, SF1442.

In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation Sections A through K. These sections constitute the model contract.

(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN) using the amount resulting from the completion of the Construction Cost Estimate Breakdown Revision 1 form. The extended amount must equal the whole Euro unit price multiplied by the number of units.

(c) Complete the necessary fill-ins and certifications in Sections I through K, including Section J, Attachment 2, "Additional Requirements Revision 1”.

(d) The entire solicitation Sections A through M as well as the form Construction Cost Estimate Breakdown Revision 1 shall be returned in their entirety.

2. QUALIFICATION CERTIFICATION

Submit current SOA certification for category OG03 and classification adequate to cover offeror’s amount for projects performance.

3. EXPERIENCE

Submit offeror’s experience with the same work/trades and complexity as the instant requirements. The offeror must submit evidence of at least two (2) similar projects performed within the last five (5) years from the date of offer where the offeror was solely responsible for the entire project performance that involved substantially the same work and principal trades, magnitude and complexity as the instant requirement.

4. TECHNICAL DATA

Submit copy of the technical data of asphalt (binder and wearing course) and concrete pavers to be installed as indicated in the Technical Specifications paragraph 4, in sufficient detail to allow the Government evaluation team to ascertain without any reasonable doubt total compliance with the requirements set forth in the project Technical Specifications.

SECTION M - EVALUATION FACTORS FOR AWARD

M-01 SELECTION

a. Basis for Contract Award This solicitation is subject to the Simplified Acquisition Procedures (SAP) of the Federal Acquisition Regulation (FAR) 13, Simplified Acquisition Procedures, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), the Air Force Federal Acquisition Regulation Supplement (AFFARS). These regulations are available electronically at the Air Force (AF) FAR Site, http://farsite.hill.af.mil.

The Government will select the offer of the responsible vendor whose offer represents the best value after evaluation in accordance with the factors indicated in paragraph M-02 below.

b. Number of Contracts to be Awarded The Government intends to award one contract for the performance of project ASHE 17-1015 Sustain Mensa Parking Lot Area F, Aviano AB, Aviano (PN), Italy and Addendum #1.

c. Solicitation Requirements, Terms and Conditions Offerors are required to meet all solicitation requirements. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award.

M-02 EVALUATION FACTORS

The following evaluation factors will be used to evaluate each offer.

Factor 1: Price Price determined to be reasonable and affordable. The offeror’s price will be evaluated for award purposes based upon the total price offered. Offerors whose price cannot be determined to be reasonable and affordable may not be considered for award.

Factor 2: Qualification Certification This factor evaluates offeror’s current SOA certification for category OG03 and classification adequate to cover offeror’s amount for project performance. This requirement is met when the offeror includes a copy of the current SOA certification for category OG03 and classification adequate to cover offeror’s amount for projects performance.

Factor 3: Experience This factor evaluates offeror’s experience with the same work/trade and complexity as the instant requirement. This requirement is met when the offeror includes evidence of at least two (2) similar projects performed within the last five (5) years from the date of offer where the offeror was solely responsible for the entire project performance that involved substantially the same work and principal trades, magnitude and complexity as the instant requirement.

Factor 4: Technical Data of asphalt (binder and wearing course) and concrete pavers to be installed as indicated in the Technical Specifications paragraph 4.

This factor evaluates offerors capability to comply with the requirements of the Technical Specifications. This requirement is met when the offeror includes a copy of the technical data/characteristics of the items listed in the above paragraph that demonstrate without any reasonable doubt total compliance with the requirements of the Technical Specifications.

(End of Summary of Changes)