Section 01100R 1

SECTION 01100

GENERAL CONDITIONS

PART 1 – APPLICABLE NORMS

1.1 The Italian norms for building works and the instructions of materials suppliers shall be strictly observed for the execution of the works. In addition the general safety regulations for construction and the Base regulation for traffic, accidents and fire fighting shall be observed as follows:

a. UNI Norms – Demolition works; masonry works, pavement works, concrete reinforcement bars, structural steels, pipes, painting, plumbing, heating system, fire protection system and electrical system.

b. C.N.R.; ASTM; AASHTO norms – Aggregates, bitumen, bituminous mixtures and road works in general.

c. Legislative Decree No. 81 dated 9 April 2008.

d. CEI norms in force at tender date.

e. UNEL norms in force at tender date.

f. ENPI norms in force at tender date.

g. NEC norms in force at tender date.

h. AFPM 91-210 Contract Safety.

i. AFI 91-202 Safety Program Management.

The manuals and regulations relative to paragraphs i and j, will be available for review at the Engineering Office, Bldg 407 of Aviano Air Base, during normal working hours, from Monday to Friday, from 0800 to 1700 hrs. Further clarifications regarding the type of materials and the work specified in the Schedule to Work items or indicated in the drawings, will be provided during the site survey scheduled prior to the submittal of proposal.

1.2 CERTIFICATION OF COMPLIANCE WITH ITALIAN LAWS

1.2.1 Static Load Testing

The Contractor shall comply with the pertinent articles of Italian Law

1086 dated 5 November 1971, and all subsequent revisions. The Contractor shall be fully responsible for construction, supervision, static load tests, final testing, and for all costs associated with this procedure.

Article 2 of Law 1086, as amended, requires the static load tests to be performed under the supervision of an engineer or architect registered on the National Professional Rolls of Italy for at least ten years (10).

Prior to performing the tests, submit to the Contracting Officer the names and certified credentials of proposed testing personnel, engineer(s) or architect(s) they propose to perform the static load testing.

2 Section 01100R

1.2.2 Mechanical and Electrical Work Certifications

As a condition of final acceptance of the work, the Contractor shall submit to the Contracting Officer a certificate of compliance for all contract work certifying that all electrical and mechanical work complies with Ministerial Decree 37/2007, and that the provided work is adequate and safe for the designated use.

1.2.3 Other Certifications

In addition to the certifications listed above, the Contractor shall provide all other certifications and testing required by Italian Law.

Such certifications may include but are not limited to the following:

a. Certificate of approval of the grounding and lightning protection systems, in accordance to CEI Norms and D.P.R. No. 462/01.

b. Certificate of compliance for heating systems above 100,000 kcal/hr in accordance with Italian Law No. 373 dated 30 April 1976.

c. Certificate of compliance for fire prevention systems in accordance with Ministerial Decrees dated 16 February 1982 and 8 March 1985.

d. Certificate for elevator systems test in accordance with Italian Law No. 1415 dated 24 October 1942.

PART 2 – MATERIALS

2.1 All materials shown on drawings and listed in the Schedule of Work

Item or anyhow necessary for the accomplishment of project will be furnished and installed by the Contractor except those shown on drawings which will be furnished and installed by the U.S.A. Government and installed by the Contractor.

2.2 DEMOLITION AND INTERVENTION WORK ON EXISTING STRUCTURES

During possible partial demolition or intervention operation of bearing structures the Contractor shall provide for the shoring of existing structures, for the safety of personnel and building, being responsible for any accident and/or damage. Shoring will be performed in a way to assure the integral conservation of structures not to be demolished or modified. Shoring shall be inspected by Contracting Officer’s Technical Representative prior to proceeding with any demolition work of structural elements.

2.3 REMOVED MATERIALS

The materials to be removed, (specified on drawings and/or on the Schedule of Work Items) shall be handled as follows:

2.3.1 Unsalvageable materials

Shall be transported to public dump in accordance with Italian communal norms in force. The Contracting Officer’s Technical Representative shall determine which materials are unusable. Under no circumstances will the Contractor attempt to sell or otherwise use such material unless and until he first obtains, the necessary permits, licenses etc. from the Italian Government Officials and will hold the U.S. Government free and harmless from his failure to do so.

Section 01100R 3

2.3.2 Salvageable materials

Shall be loaded, unloaded and stacked at a warehouse of Aviano Air Base.

The Contracting Officer’s Technical Representative shall determine which material is salvageable and the storage location. Maximum distance will be 15 km.

2.3.3 Materials to be reused in the project

Shall be removed with care and stored by the Contractor on site, after inspection of operating state of such fixtures which will be done jointly with the Contracting Officer’s Technical Representative. The Contractor shall be fully responsible for preservation of such fixtures and before their installation, in the location he shall provide for cleaning and rehabilitation work.

2.4 SELECTION OF EQUIPMENT, MATERIALS AND COLORS

The Contracting Officer’s Technical Representative will select equipment, materials and colors from among the charts and factory samples which will be submitted by the Contractor and approved by the Government in accordance with the indications of the project documents. It will be the Contracting Officer’s Technical Representative’s option to request all samples and catalogues of materials to be incorporated in the project to ensure the satisfactory and proper completion of the work. All samples shall be returned to Contractor.

2.5 SUBMITTALS

This paragraph applies only to those items not subject to the “brand name or equal” provision of the contract and listed in AF Form 3052. Within 15 days from the date of notice to proceed, or in accordance with the prescriptions given by the Contracting Officer, the Contractor shall submit Contracting Officer’s Technical Representative’s approval the data requested by the project documents and listed in the paragraph entitled “Material Approval” in order to ascertain that the material corresponds to the technical characteristics of the project. The submittals consisting of AF Form 3000, and catalog contracts (4 copies), beside the samples, will be in English or Italian with the English translation attached. The list preparation shall be coordinated with the work schedule keeping in mind that the Government needs at least 15 days for the approval. Every disapproved item shall be resubmitted following the same procedure. A copy of the AF Form 3000 and relative attachments will be returned to the Contractor. No work will be started prior to obtaining the approval for the proposed material and equipment. The approval of submittals does not relieve the Contractor of responsibility for proper application and installation of the items, of other evident or hidden defects. Shop drawings, for electric equipment shall include construction drawings, diagrams and schematics for power circuits and control circuits, and component reference list.

2.6 USE OF BRAND NAMES IN SPECIFICATIONS

Unless otherwise specifically provided on this contract, reference to any equipment, material article or patented process by trade name, make or cat number shall be regarded as establishing a standard of quality and shall not be construed as limiting competition, and the Contractor may, at his option use any equipment, material, article, or process which, in

4 Section 01100R the judgment of the Contracting Officer’s Technical Representative, is equal to that named. The Contractor shall furnish to the Contracting Officer’s Technical Representative all required data and samples as may be called for the these technical provisions or which the Contracting Officer’s Technical Representative determines necessary for approval prior to use of the items during work performance.

2.7 “EQUIVALENT” ITEMS PROPOSED BY CONTRACTOR

If the Contractor intends to propose “brand names” different than the ones specified by U.S. Government, he will clearly indicate the “equivalent” proposed item, the manufacturer, type, catalog No., etc. in the List of Equivalent Proposed Items attached to AF Form 3052 which shall be returned to the Government together with the proposal. Each equivalent item listed shall be supported by the relative technical documentation (catalog cuts, certificates, technical descriptions, calculations, etc.) in order to prove the equivalency of the technical characteristics of the product listed in the project document. Such documentation shall also be attached to the proposal.

2.8 INFORMATION DATA

Prior to work completion date and if expressly requested by project documents will submit the following information data in English and Italian:

2.8.1 Manufacturer’s literature

Catalog extracts for all items (materials and equipment) furnished, in accordance with project documents.

2.8.2 Parts List

List of furnished items, in accordance with project documents:

a. Item description

b. Current unit price

c. Reference to manufacturing Firm

2.8.3 Manufacturer’s Address

List of materials and equipment suppliers, in accordance with project documents.

a. Firm Name

b. Complete address and telephone number

c. Reference to parts list

2.8.4 Operation and Maintenance Manuals

At work completion date, the Contractor shall submit three (3) copies of operation and maintenance manuals of all equipment installed.

2.8.5 Operation Test Reports

Section 01100R 5

In accordance with project documents, prior to work completion date, the Contractor shall perform balancing and testing of each system installed and will submit three (3) copies of testing report containing recorded data of readings performed during tests.

PART 3 – SITE CONDITIONS

3.1 WORKING HOURS

Normal working hours authorized on base, are from 0800 to 1700 hrs., Monday through Friday. Any working hours different from the authorized hours must be previously approved by the Contracting Officer.

3.2 UTILITY CUT-OFF

When interruption of existing utilities is deemed necessary for the installation of the lines or equipment, the Contractor shall submit a written request, to the Contracting Officer of his authorized representative for approval “three (3) weeks" prior to his scheduled starting of work. For the electrical cut-off the request shall be submitted (10) ten days prior the scheduled starting of work. Such interruption shall not be started before receipt of the approved request, nor shall interruptions request be submitted at the end of the week (from Friday through Sunday). The request shall state the duration of interruptions and the description of work to be done.

3.3 STORAGE SHED

It will be Contractor’s option to provide one or more storage sheds to store materials and work tools. The available area, for the assembly of such shed, shall be indicated by the designated representative of the Contracting Officer’s Technical Representative. At work completion the shed shall be disassembled and the area shall be restored to its original condition.

3.4 AIRFIELD SAFETY TRAINING

The Contractor shall contact Airfield Management to receive flightline driver and airfield safety training prior to start of any work beginning on the flightline.

3.5 TRANSPORTATION OF PERSONNEL AND MATERIALS

It will be the Contractor’s responsibility to transport the personnel to and from the job site and to load, transport, unload and place all supplies, materials and equipment involved in this contract.

3.6 UTILITIES

Electric power, existing grounding system and water available in the area, will be made available to the Contractor by the U.S. Government.

Connections and disconnections will be at Contractor’s expense and utilities are to be restored to their original condition at no extra cost to the Government. All damages caused, if any, to the existing utilities will be repaired immediately at Contractor’s expenses, also in case that such repairs are made by Government’s personnel and as directed by the Contracting Officer’s Technical Representative. Before starting the works, the Contracting Officer will indicate the point wherefrom water

6 Section 01100R and electric power will be taken. The Contractor will be entitled to provide for himself, if desired, a generating set, and his own expense.

The electrical characteristics of available power will be indicated in project documents.

3.7 TOILET FACILITY

The toilet facilities available in the vicinity of site of work may be used by Contractor’s personnel provided there are no instructions to the contrary in the project documents.

3.8 EXCAVATIONS

The Contractor shall initiate no excavation work prior to receiving an approved AF Form 103. This form will be prepared by U.S. Government personnel.

PART 4 - LABOR

All installation and construction operations, calibrations and tests during service, etc, shall be performed in a workmanlike manner by skilled tradesmen being qualified to perform the most difficult operations pertaining to their respective craft. The use of common labor for operations normally assigned to skilled tradesmen will not be accepted.

PART 5 – DEFINITIONS

As used throughout this master specification set the terminologies used such as: project, drawings, project documents and documents mean the additional specifications. Schedule of Work Items, Drawings and other documents which compose the specific individual project to be performed and for which a proposal is solicited separately.

PART 6 - ORDER OF PRECEDENCE

In case of conflict between this master specification set and the individual project documents, the difference shall be resolved by giving precedence to the individual project documents.

-- End of Section --

Section 01101R 1

SECTION 01101R

PROJECT SIGN

PART 1 - PROJECT SIGN

1.1 Scope

Furnish labor and material required for the construction and painting of a sign as shown on the attached sketch.

PART 2 - GENERAL

The Contractor shall identify the project by means of an appropriate sign mounted in a conspicuous area of the work site, as indicated by the Contracting Officer or his designated representative. The sign shall be erected within 10 days of initiation of work at the job site. The sign shall be 120 cm wide x 80 cm high and shall be constructed of a material suitable to withstand exposure to inclement weather for the duration of the contract, and must not show evidence of warping, cracking, or other defects. The sign shall have a blue background with white lettering, and shall contain the following information in English:

a. Project No.

b. Project description

c. Constructed under Supervision of Base Civil Engineering

d. Contracted by 31st Contracting Squadron

e. Contractor

f. Design Engineer: 31CES/CEPM

g. Inspector

h. Contract Management: 31 CONS Construction Flight

i. ERP Coord

Lettering of the sign may be painted or stenciled directly on sign. The sign will remain the property of the Contractor, and shall be promptly removed upon completion of the project.

2 Section 01101

Design by

31CES/CEPM

PROJECT TITLE

Section 02220R 1

SECTION 02220

SITE DEMOLITION

PART 1 - GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

1.1.1 National Fire Protection Association (NFPA):

NFPA No. 241 (2000)Standard for Safeguarding Construction, Alterations, and Demolition Operations.

1.1.2 Safety at Work Places:

Law Decree 14 August 1996 “Construction Site Regulations”, Supplements and Amendments.

1.1.3 Trash Disposal:

Law Decree 15 November 1993.

Law Decree 5 February 1997 No. 22 (Decreto Ronchi).

Law Decree 8 November 1997 No. 389.

Decree 1 April 1998 No. 145.

Decree 28 April 1998 No.406, Environmental Department.

Decree 24 June 1998 No. 261.

Circular 4 August 1998 No. GAB/DEC/812/98.

1.1.4 Asbestos Material Treatment:

Law 27.03.1992, No. 257 Norms concerning the discontinuance of the use of the asbestos.

Ministerial Decree 06.09.1994 Norm and technical methodologies for compliance with Law No. 257, dated 27 March 1992, Art. 6, comma 3, and Art. 12, comma 2 concerning the concerning the discontinuance of the use of the asbestos.

Legislative Decree 10.09.1994, No. 626 Implementation of the CEE requirements for improving safety and health of workers on work site.

Legislative Decree 17.03.1995, No. 114 Implementation of the requirements 87/217/CEE concerning the prevention and reduction of the environment pollution due to the asbestos.

Circular No. 7 Explanatory circular of the Ministerial dated 12.04.1995 Decree dated 06.09.1994.

Ministerial Decree 14.05.1996 Norms and technical methodologies for reclamation actions as stated by Law No.

2 Section 02220R

257, dated 27 March 1992, Art.5, comma 1, letter f) concerning: “Norms for the discontinuance of the use of the asbestos”.

Legislative Decree 14.08.1996, No. 494 Implementation of the requirements 92/57/CEE concerning the minimum safety and health requirements to be accomplished in temporary or mobile work sites.

Legislative Decree 05.02.1997, No. 22 Implementation of the requirements 1/156/CEE regarding waste, 91/689/CEE regarding hazardous waste and 94/62/CEE regarding packaging and waste packaging.

Ministerial Decree 12.02.1997 Criteria for homologation of products replacing the asbestos.

Ministerial Decree 26.03.1998 List including the name of the firms and list of the materials replacing the asbestos that have obtained the homologation.

Decree 20.08.1999 Increase of the norms and technical methodologies for reclamation actions as stated by Law No. 257, dated 27 March 1992, Art.5, comma 1, letter f, concerning: “Norms for the discontinuance of the use of the asbestos”.

Deliberation 14.03.2001 Modification to the deliberation dated 1

February 2000, protocol No. 002/CN/ALBO, concerning “Criteria to be enrolled in the Albo Categoria 10: Reclamation of asbestos containing goods” (Deliberation No.

004/CN/Albo).

Decree 25.07.2001 Rectification of Decree 20 August 1999 concerning “Increase of the norms and technical methodologies for reclamation actions as stated by Law No. 257, dated 27 March 1992, Art.5, comma 1, letter f) concerning norms for the discontinuance of the use of the asbestos”.

Decree of the Council of Regulations for the determination of the Ministers President model and the procedures to keep the 10.12.2002, No. 308 register in case of mesothelioma due to the asbestos according to Legislative Decree No. 277, dated 15 August 1991, Art.36, comma 3.

Section 02220R 3

Ministerial Decree 13.03.2003 Criteria of admissibility of the wastes in the dump site.

REGIONAL NORMS AND LAWS

Regional Law Implementation of the national laws dated 03.09.1996, No. 039 concerning the discontinuance of the use of the asbestos.

Regional Law Directions concerning environment, dated 09.11.1998, No. 013 territory, economic and productive activities, health and social care, education and culture, state employment, state real property, regional financial companies, intervention on support of the Middle Europe Enterprise, treatment of personal data, and reconstruction of devastated by earthquake areas.

Regional Law Directions concerning surveillance, dated 12.09.2001, No. 022 prevention, and information of situation with asbestos danger and correlated regional interventions.

1.1.5 Electrical and Electronic Equipment Waste Disposal (RAEE)

Disposal of the Electrical and Electronic Equipment Waste (RAEE) shall be in compliance with Legislative Decree No. 151 dated 25 July 2005:

Accomplishment of the European Directive Relevant to the Electrical and Electronic Equipment Waste.

1.2 SUBMITTALS

Statements: A demolition plan giving the procedures proposed for the accomplishment of salvage, demolition and removal work shall be submitted to the Contracting Officer’s Technical Representative and approved before work is started. The procedures shall provide for careful removal and disposition of materials specified to be salvaged and coordination with other work in progress. The procedures shall include a detailed description of the methods and equipment to be used for each operation, the sequence of operations and in case of demolition of adherence built constructions or in case of partial demolitions they shall also include the calculation of provisional structures which are to bear possible walling and, if the size of the work requires it, also a geotechnical report about the adjoining buildings.

1.3 GENERAL REQUIREMENTS

The work includes the demolition and/or the removal of all construction indicated or specified. All materials resulting from demolition work, except as indicated or specified otherwise, shall become the property of the Contractor and shall be removed from the limits of Government property. Trash and debris shall be removed from the station daily, unless otherwise directed, and shall not be allowed to accumulate on the site. Such materials which, in the opinion of the Contracting Officer’s Technical Representative, cannot practically be removed daily shall be neatly stored on the site where directed by the Contracting Officer.

4 Section 02220R

1.4 ASBESTOS

Asbestos containing materials shall be treated in compliance with the

Specification 13281 “Engineering Control of Asbestos Containing Materials” of this Contract Document.

1.5 DUST AND DEBRIS CONTROL

Dust resulting from salvage, demolition and removal work shall be controlled to prevent the spread of dust and avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it may result in, or create, hazardous or objectionable conditions such as ice, flooding and pollution.

1.6 PROTECTION

1.6.1 Protection of Existing Work from Damage

Protect existing work which is to remain in place, to be reused, or to remain on the property of the Government by temporary covers, shoring, bracing and supports. Repair such items which are damaged during performance of the work or replace with new. Do not overload structural elements. Provide new supports or reinforcement for existing construction which is weakened by demolition or removal work.

1.6.2 Weather Protection

The interior of the building and all materials and equipment shall be protected from the weather at all times. Where removal of existing roofing is necessary to accomplish work, materials and workmen necessary to provide adequate and approved temporary covering of exposed areas shall be kept in readiness at all times. Temporary coverings shall be attended as necessary to insure their effectiveness and prevent displacement.

1.6.3 Protection of the Trees and Shrubs

Protect trees and shrubs within the project site that might be damaged during demolition, and that are indicated to be left in place. Restore trees scarred or damaged by Contractor equipment or operations to a satisfactory condition or replace them as determined by the Contracting Officer’s Technical Representative.

1.6.4 Facilities

Protect all electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas and temporary services or connections for electrical and mechanical utilities.

1.6.5 Protection of Personnel

Where pedestrians’ and drivers’ safety is endangered in the area of work removal, barricades for traffic shall be used and advance notice shall be given to the Contracting Officer prior to beginning any such work.

Section 02220R 5

1.7 USE OF EXPLOSIVES

Use of explosives will not be permitted.

1.8 BURNING

Burning will not be permitted.

1.9 RELOCATIONS

Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Repair items to be relocated which are damaged or replace damaged items with new undamaged items as approved by the Contracting Officer’s Technical Representative.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.1 EXISTING ITEMS TO BE REMOVED

The existing temporary metal building shall be dismantled and will remain

Contractor’s property.

3.2 DISPOSITION OF MATERIAL

3.2.1 Title to Materials

Title to all materials and equipment to be removed, except as specified otherwise, is vested in the Contractor upon receipt of notice to proceed.

The Government will not be responsible for the condition, loss or damage to such property after notice to proceed.

3.2.2 Material to be salvaged

Salvaged material shall be stored as directed by the Contracting Officer.

3.2.3 Reuse of materials and equipment

Carefully remove and store materials indicated to be reused or relocated to prevent damage and reinstall as the work progresses.

3.3 CLEAN-UP

3.3.1 Debris and Rubbish Control

Debris and rubbish shall be removed each day and transported in a manner that will prevent spillage on streets or adjacent areas. Clean up spillage from streets and adjacent areas.

3.3.2 Regulations

National, Provincial, and local regulations regarding hauling and disposal shall be complied with.

-- End of Section –-

Section 02231R 1

SECTION 02231R

CLEARING AND GRUBBING

1.1 DESCRIPTION

This work shall consist of clearing and grubbing all areas within the project area containing vegetation and that are to be regraded or built upon. All work shall be in accordance with these specifications and as indicated on the drawings. The clearing and grubbing shall consist of clearing and grubbing the project area of all existing vegetation, rubbish, large stones, and all other objectionable material. Grubbing shall include removal of stumps, roots, and matted roots. All spoil material resulting from the clearing and grubbing operation shall be removed from the site.

PART 2 - PRODUCTS (NOT USED)

3.1 PROTECTION

3.1.1 Roads and Walks

Keep roads and walks free of dirt and debris at all times.

3.1.2 Trees to remain

Protect with barricades any trees which are designated to remain in areas to be cleared and grubbed.

3.1.3 Existing facilities

Protect with barricades any existing facilities which are designated to remain in areas to be cleared and grubbed.

3.1.4 Barricades

Erect barricades for trees and existing facilities to remain prior to commencing other clearing and grubbing operations. Barricades shall consist of a 1.2 m to 2 m high wire or wood fencing supported by posts on 3 m to 4 m centers. Erect barricades at or outside the tree or shrub drip line. Barricades for existing facilities shall be placed as directed by the Contracting Officer’s Technical Representative. No traffic or storage shall be permitted within the barricaded areas. Upon completion of all work all barricades shall become property of the Contractor and shall be removed from Government property.

3.1.5 Utility Lines

Protect existing utility lines that are indicated to remain from damage.

Notify the Contracting Officer’s Technical Representative immediately of damage to or an encounter with an unknown existing utility line. The Contractor shall be responsible for the repairs of damage to existing utility lines that are indicated or made known to the Contractor prior to start of clearing and grubbing operations. When utility lines that are to be removed are encountered within the area of operations, the

2 Section 02231R

Contractor shall notify the Contracting Officer’s Technical Representative in ample time to minimize interruption of the service.

3.1.6 Roots, stumps and logs, organic and metallic debris, brush and refuse shall be excavated and removed to a depth of not less than 400 millimeters below the original soil surface in areas indicated as construction areas under this contract. Depressions made by grubbing shall be filled with suitable material and compacted in accordance with the requirements specified in Section 02315, "Excavation and Fill" to make the surface conform to the original adjacent surface of the ground.

3.2 CLEARING AND GRUBBING

Clearing and grubbing shall consist of clearing the designated area of all saplings, brush and undergrowth and removing all trees, brush stumps, roots and all objectionable material. Trees to remain are shown on the drawings. All trees within the limits of construction, as shown on the drawings, are to be removed as indicated; those designated to remain shall be protected as specified in Section 02220, "Site Demolition".

3.2.1 A tree is defined as any type of plant having a diameter greater than

200 millimeters. A plant with a diameter between 50 millimeters and 200 millimeters is defined as a sapling. A plant less than 50 millimeters in diameter is brush or undergrowth.

3.2.2 Tree trunks, branches or saplings with diameter 50 millimeters or less shall be removed from the project site and dispose of outside the Base to authorized suitable dumping areas according to applicable regulations. The Contracting Officer’s Technical Representative shall be able to enquire at any time about the disposal in accordance with the law. Burning will not be permitted.

3.3 PRUNING

Trim trees designated to be left standing within the cleared areas of dead branches 40 millimeters or more in diameter. Neatly cut limbs and branches to be trimmed close to the bole of the tree or main branches.

The Contractor shall exercise care to avoid tree skinning during the trimming. Cut trees in such a manner as to reduce to the maximum the stump and to minimize the cicatrisation time. Perform the cut in such a manner as to avoid the water stagnation and stump rottenness. The Contractor shall protect the larger clefts by means of proper grafting wax to avoid rottenness, fungus and/or insect attacks.

Section 02315R 1

SECTION 02315R

EXCAVATION AND FILL

1.1 APPLICABLE PUBLICATIONS

The following publications of the issues listed below, but referred to thereafter by basic designation only, form a part of this specification to the extent indicated by references thereto:

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) PUBLICATIONS

D 1556-00 Standard Test Method for Density and Unit Weight of Soil in Place by the Sand Cone Method.

D 1557- 02 e1 Standard Test Methods for Laboratory

Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3(2,700 kN-m/m3).

D 2922- 01 Standard Test Methods for Density of Soil and Soil Aggregates in Place by Nuclear Methods (Shallow Depth).

D 2487- 00 Standard Classification of Soils for

Engineering Purposes (Unified Soil Classification System).

ITALIAN LAWS

Legislative Decree No. 81 dated 9 April

1.2 SUBMITTALS

1.2.1 Certified Laboratory Test Reports

Before delivery of materials, certified copies in triplicate of the reports of all tests required herein under materials and in referenced publications shall be submitted to and approved by the Contracting Officer. The testing shall have been performed in an independent laboratory approved by the Contracting Officer. Additional testing shall be submitted when the source of materials is changed. Certified test reports are required for the following:

a. Porous fill for capillary water barrier.

b. Select fill material

1.2.2 Field Test Reports

a. Fill and backfill test

b. Select material test

c. Porous fill test for capillary water barrier

2 Section 02315R

d. Density tests

1.2.3 Records

The Contractor shall submit a request for digging permit as required in paragraph 1.4 following.

1.3 SITE INFORMATION

The data on sub-surface soil conditions indicated in the contract drawings are not intended as representations or warranties of the continuity of such conditions between soil borings. It is expressly understood that the Government will not be responsible for any interpretation or conclusion drawn there from by the Contractor. The data are made available for the convenience of the Contractor.

Additional soil borings and other exploratory operations may be made by the Contractor at no additional cost to the Government, provided such operations are approved by the Contracting Officer.

1.4 EXISTING UTILITIES

Before starting mechanical earthwork operations, the Contractor shall obtain digging permits from the Contracting Officer. Requests for digging permits shall specify locations of work to be performed and date that the work is to begin. The locations of existing utilities indicated are approximate; the Contractor shall scan the construction site with electromagnetic and sonic equipment and mark the surface of the ground where existing underground utilities are discovered. The Contractor shall use manual methods to verify the location of underground utilities.

If utilities are to be left in place, protection against damage shall be provided. Existing utilities serving facilities occupied and used by the Government shall not be interrupted except when approved in writing by the Contracting Officer and then after temporary utility services have been approved and provided.

1.5 MATERIAL STORAGE

Excavated materials classified as satisfactory soil material shall be stockpiled, where directed, until required for backfill or fill.

Stockpiles shall be placed, graded, and shaped for proper drainage, and stored in a manner to prevent contamination and segregation. Materials required in the work shall be located and retained a sufficient distance from the edge of excavations to prevent such material from falling or sliding back into the excavations, and to prevent cave-ins. Waste materials, such as excavated material classified as unsatisfactory soil material, trash, debris, and excess satisfactory soil material, shall be disposed of as specified hereinafter.

1.6 GENERAL REQUIREMENTS

Bids shall be based on the following:

a. That the surface elevations are as indicated.

b. That no pipes or other artificial obstructions, except those indicated, will be encountered.

c. That hard material will not be encountered.

Section 02315R 3

d. That ground water elevations indicated are those existing at the time subsurface investigations were made and do not necessarily represent permanent ground water elevation.

In case the actual conditions differ substantially from those stated or shown, the provisions of the contract respecting an adjustment for changed conditions shall apply, subject to the requirements of notification thereunder being given. Hard material shall be defined as solid rock, firmly cemented unstratified masses or conglomerate deposits possessing the characteristics of solid rock not ordinarily removed without systematic drilling and blasting and any boulder, masonry, or concrete except pavement, exceeding 0.4 cubic meters in volume.

PART 2 – PRODUCTS

2.1 POROUS FILL

Capillary water barrier (indicated as porous fill) under concrete floor slabs and areaways shall consist of clean crushed stone, crushed gravel, or uncrushed gravel, 90-100 percent passing a 20 millimeter sieve and 0-5 percent passing a 4.75 millimeter sieve with a sand equivalent of not less than 50 when tested in accordance with UNI EN 933-8. Porous fill may be composed of an appropriate combination of sand and crushed rock to meet the above gradation requirements. The capillary water barrier shall be placed directly on the subgrade. The barrier shall be constructed in layers not exceeding 10 centimeters in compacted thickness, and each layer shall be compacted with a minimum of two passes of a hand-operated plate type vibratory compactor.

2.2 SOIL MATERIALS

2.2.1 Satisfactory Soil Material

Satisfactory soil materials used as backfill for trenches, drains and for structures shall consist of native materials classified as well graded sands, silty sands or clayey sands which are free from debris, roots, wood, scrap materials and other vegetable matter and refuse.

2.2.2 Topsoil for Turfed Areas

Topsoil shall be from 5 to 10 percent organic matter, maximum particle size 10 millimeters (3/8 inch) with a maximum 3 percent retained on 6 millimeters (1-1/4 inch) sieve screen. Topsoil shall be free of sticks, stones, roots, and other debris and objectionable materials that is harmful or will hinder plant growth. Other components of the topsoil shall conform to the following limits:

pH 6.0 to 7.0 Soluble Salts 600 ppm maximum Silt 25 to 50 Clay 10 to 30 Sand 20 to 35

Topsoil may be stripped and stockpiled surface soil if it meets the above requirements or if it is conditioned to meet the above requirements.

Topsoil shall be obtained from an approved topsoil donor area.

4 Section 02315R

2.2.3 Surface Soil

The top approximately 40 centimeters of existing soil which contains organic material.

2.2.4 Select Fill

Select fill material shall be composed of sand or crushed rock. This material shall have the following gradation:

Sieve Designation Percent Passing (Weight)

40 mm 75 a 85

4.75 mm 30 a 50

0.425 mm 5 a 15

2.2.5 Backfill and Fill Materials

Soil materials for backfill and fill shall be free of clay clods, rock or gravel larger than 6 centimeters in any dimension, debris waste, frozen materials, and other deleterious matter, and shall be satisfactory soil materials as follows:

Area Classification Backfill or Fill Material

In all excavations, unless otherwise specified hereinafter.

Excavated or borrow material that has been sampled, tested and approved as "Satisfactory Soil Material."

Under grassed areas. Excavated or borrow material that has been sampled, tested and approved as "Satisfactory Soil Material."

Under buildings. Select fill material and porous fill.

Under sidewalks and exterior concrete slabs

Select fill material.

2.2.6 Pipe Bedding Materials

a. Class I: Angular, 6 to 40 millimeters, graded stone, including a number of fill materials that have regional significance such as coral, slag, cinders, crushed stone and crushed shells.

b. Class II: Coarse sands and gravels with maximum particle size of

40 millimeters, including various graded sands and gravels containing small percentages of fines, generally granular and non-cohesive, either wet or dry. Soil Types GW, GP, SW, and SP are included in this class as specified in ASTM D 2487.

2.4 BURIED WARNING AND IDENTIFICATION TAPE

Polyethylene plastic warning tape manufactured specifically for warning and identification of buried utility lines. Provide tape in rolls, 40 millimeters minimum width, color coded as specified below for the intended utility with warning and identification imprinted in bold black

Section 02315R 5 letters continuously over the entire tape length. Warning and identification to read, “ATTENZIONE, LINEE INTERRATE SOTTOSTANTI (servizio interessato)” “CAUTION, BURIED (intended service) LINE BELOW" or similar wording. Color and printing shall be permanent, unaffected by moisture or soil.

Warning Tape Color Codes

Red Electric Yellow Gas, Oil; Dangerous Materials Orange Telephone and Other Communication Types Blue Water Systems Green Sewer Systems Green Storm Systems Light Blue Compressed Air

2.4.1 Bare Copper Tracer Wire for Non-Metallic Piping

Minimum diameter of the wire shall be 3 millimeters. Bare copper tracer wire shall be buried as shown on drawings, and shall terminate inside the manhole at each end.

PART 3 – EXECUTION

3.1 TOPSOIL

The top 10 centimeters thickness, or as otherwise shown, of all newly graded earth surfaced areas shall consist of topsoil. The topsoil shall be uniformly distributed on the designated areas and evenly spread to an average thickness of ten centimeters with a minimum thickness of eight centimeters, or as otherwise shown. Prior to placing the topsoil, the subgrade, wherever excessively compacted by traffic or other causes, shall be loosened by disking or by scarifying to a depth of at least 6 centimeters, to permit bonding to the subgrade. The spreading shall be performed in such a manner that planting can proceed with little additional soil preparation or tillage. Any irregularities in the surface resulting from topsoiling or other operations shall be corrected in order to prevent the formation of depressions where water will stand.

Topsoil shall not be placed when the subgrade is excessively wet, extremely dry, or in a condition otherwise detrimental to proper grading.

3.2 EXCAVATION

3.2.1 General

Excavation shall consist of the removal and disposal of all materials encountered to obtain the specified subgrade elevations. Strip existing surface soil to minimum 40 centimeter depth, unless otherwise noted.

3.2.2 Protection of Persons and Property

All excavations shall be barricaded and posted with warning signs for people safety. Warning lights shall be provided during hours of darkness.

Structures, utilities, sidewalks, pavements and other facilities immediately adjacent to excavations shall be protected against damage including settlement, lateral movement, undermining, and washout.

3.2.3 Excavation for Structures

6 Section 02315R

Excavation for structures shall conform to the dimensions and elevations indicated within a tolerance of plus or minus 15 centimeters and shall extend a sufficient distance from footings and foundations to permit placing and removal of concrete formwork, installation of services and other construction indicated, and for inspection, but not less than 1.50 meters from the sides of foundations. In excavations for footings and foundations, take care not to disturb the bottom of the excavation.

Excavate to final grade just before concrete is placed. Trim bottoms to the required lines and grades to leave a solid bed to receive concrete.

3.2.4 Trench Excavation

Trenches shall be of necessary width for proper pipe, duct or cable laying and banks shall be as nearly vertical as practicable. Bottoms of trenches shall be accurately graded to provide uniform bearing and support for each section of pipe on undisturbed soil at every point along its entire length, except for portions of pipe sections where it is necessary to excavate for bells and for proper making of joints and to allow for the indicated thickness of select fill bedding. Bell holes and depressions for joints shall be shaped after bedding bottom has been graded and shall be only one centimeter greater in length, depth and width than the bell, as required for properly making the particular type of joint, and to insure that the bell does not bear an undue portion of the load. When hard materials are encountered, trenches shall be cut to an over-depth of at least ten centimeters including bell holes, and back-filled to required grade as specified hereinbefore when hard materials are not encountered. Trenches shall then be backfilled as previously specified for areas where hard material is not encountered.

3.2.5 Excavation for Roads and Parking Areas

Excavation shall consist of excavating and grading for parking areas;

excavating the top 40 centimeters of surface soil and additional unsuitable material, regardless of character, from the subgrade; and disposing of all excavated materials, as specified and in conformity with the lines, grades, cross sections, and dimensions shown on the drawings, and to replace unsatisfactory materials from other excavation or grading operations.

3.2.6 Removal of Unsatisfactory Soil Materials

Unsatisfactory soil materials encountered that extend below the required elevations shall be excavated to the depth directed by the Contracting Officer’s Technical Representative. Such additional work, provided it is not due to the fault or neglect of the Contractor, shall be measured as directed by the Contracting Officer and paid for by the Government in accordance with the "Special Requirements" relative to changes in the work. Where unsatisfactory soil materials result from the neglect of the Contractor in his performance of shoring and bracing, water removal, material storage, or other specified requirements, the resulting unsatisfactory soil material as hereinafter specified shall be removed and replaced at no additional cost to the Government.

3.2.7 Unauthorized Excavation

Unauthorized excavation shall consist of removal of materials beyond indicated subgrade elevations or side dimensions specified without the specific direction of the Contracting Officer’s Technical Representative

Section 02315R 7 and shall be replaced as hereinafter specified at no additional cost to the Government. Unauthorized excavation under the footing or base of foundation or retaining wall shall be filled to the elevation of the footing or base with lean concrete (Rck = 200 kilograms per square centimeter) or well-compacted select fill, without altering the approved top elevation. Elsewhere unauthorized excavations shall be backfilled and compacted as specified for authorized excavations of the same classification.

3.2.8 Stability of Sides

Sides of excavations over 1.5 meters in depth shall be sloped to the angle of repose of the material excavated, or shall be shored and braced where sloping is not possible either because of space restrictions or stability of material excavated. Sides and slopes of excavations shall be maintained until completion of backfill placement in a safe condition by scaling, benching, shelving, or bracing. Precautions shall be taken to prevent slides or cave-ins when excavations are made in locations adjacent to backfilled excavations, and when sides of excavations are subjected to vibrations from vehicular traffic or the operation of machinery or any other source.

3.2.9 Shoring and Bracing

Materials used for shoring and bracing, such as sheet piling, uprights, stringers and crossbraces, shall be in good serviceable condition. Any timber used shall be sound and free of large or loose knots. Shoring and bracing in excavations shall be maintained regardless of the length of time excavations will be open. All shoring and bracing shall be carried down with the excavation. Wherever subsequent removal of sheet piling could permit the lateral movement of soil under adjacent structures, steel sheet piling or pressure creosote timber sheet piling shall be used, and left permanently in place, and cut off as required.

3.2.10 Water Removal

Excavation shall be performed in a manner to prevent surface water and subsurface or ground water from flowing into the excavations and to prevent water from flooding the project site and surrounding area. Water shall not be permitted to accumulate in excavations. All water shall be removed from excavations by approved dewatering methods so that softening of foundation bottom, undercutting footings, and soil changes detrimental to the stability of subgrades and foundation will not occur. Pumps, sumps, suction and discharge lines, and other dewatering system components shall be provided and maintained as necessary to convey the water away from the excavations. Dewatering operations shall be continued until the completion of backfill placement and until construction subject to water pressure has obtained the specified strength. In all instances, dewatering operations shall continue as long as water can enter or accumulate in the excavations. Water removed from excavations and rainwater shall be conveyed to collecting or run-off areas, as approved by the Contracting Officer’s Technical Representative.

Temporary drainage ditches and other diversions shall be provided and maintained outside the excavation limits for each structure. The use of trench excavations for site utilities as temporary drainage ditches will not be permitted.

8 Section 02315R

3.3 BACKFILL AND FILL

3.3.1 General

Backfill shall consist of the placement of specified backfill material, in layers, in the excavations to the indicated subgrade elevations, for each area classification listed below.

Fill shall consist of the placement of specified fill materials, in layers, over the ground surface to the indicated elevations, for each area classification listed below.

3.3.2 Preparations Prior to Backfill Placement

Excavations shall be backfilled as promptly as the work permits, but not until completion of the following:

a. Approval of construction below finish grade.

b. Inspection, testing, approval, and recording location of underground utilities.

c. Removal of concrete formwork.

d. Removal of shoring and bracing, and backfilling of voids with satisfactory soil material; temporary sheet piling driven below the bottom of structure and utilities shall be cut off and removed in a manner to prevent settlement of the structure or utilities.

e. Removal of trash and debris.

3.3.3 Preparation of Ground Surface to Receive Fill

Vegetation, debris, unsatisfactory soil materials, obstructions, and deleterious materials shall be removed from ground surface prior to the placement of fills. Sloped surfaces steeper than one vertical to four horizontal shall be plowed, stripped, or broken-up in such a manner that fill material will bond with the existing material. When the ground surface has a density less than that specified for the particular area classification, the ground surface shall be broken-up, pulverized, moisture-conditioned to near optimum moisture content of the soil material and compacted to the required depth and percentage of maximum density.

3.3.4 Backfilling Trenches

Backfilling shall be coordinated with testing of utilities. Where damage is likely to result from withdrawing sheeting, the sheeting shall be left in place and contract price will be adjusted accordingly. Trenches shall be carefully backfilled with materials hereinbefore specified or as indicated, and deposited in 20 centimeters maximum layers, loose depth.

Borrow materials shall be obtained from sources outside the station. The source of material shall be the Contractor's responsibility. Backfill shall be brought up evenly on both sides of pipe for its full length, and shall be thoroughly and carefully tamped. Care should be taken not to damage pipe or special coatings on pipe.

Section 02315R 9

The remainder of backfill material shall then be deposited in the trench in 30 centimeters maximum layers and compacted by mechanical means.

Trenches and excavation pits improperly backfilled, or where settlement…