TECHNICAL SPECIFICATION FOR ASHE 18-1077 SUSTAIN JOINT SEAL SOUTH RAMP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA568218R0030001_Site_Visit_Reschedule_Amend1.pdf | ||
| ASHE_18-1009_SOW_Rev_1.pdf | ||
| ASHE_18-1077_KCE.xlsx | XLSX spreadsheet | |
| ASHE_18-1006_SOW_Rev1.pdf | ||
| ASHE_18-1010_KCE.xlsx | XLSX spreadsheet | |
| FA568218R0030.pdf | ||
| ASHE_18-1010_SOW_Rev_1.pdf | ||
| ASHE_18-1009_KCE.xlsx | XLSX spreadsheet | |
| Attachment_5__Additional_Requirements.pdf | ||
| ASHE_18-1077_SOW_Rev_1.pdf | ||
| ASHE_18-1006_KCE.xlsx | XLSX spreadsheet | |
| ASHE_18-1006_Sustain_Joint_Seal.pdf | ||
| ASHE_18-1009_Sustain_Joint_Seal.pdf | ||
| ASHE_18-1010_Sustain_Joint_Seal.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project ASHE 18-1077 Statement of Work
DATE: MAR 2018
31CES/CENM 1
U.S. AIR FORCE
31ST FIGHTER WING
31ST CES/CENM
AVIANO AIR BASE, ITALY
TECHNICAL SPECIFICATION FOR
ASHE 18-1077
SUSTAIN JOINT SEAL SOUTH RAMP,
AVIANO AB, AVIANO (PN) ITALY
31CES/CENM 2
1. SCOPE OF WORK: The purpose of this project is to replace the existing joint sealants on the concrete slabs. The contractor shall have 90 (ninety) calendar days to allow for material procurement, work completion and clean up.
2. WORKS LOCATION: Works has to be done at South Ramp, Facility 14683, concrete parking area, Area F, Aviano Air Base, Italy.
3. WORK SITE CONDITIONS:
a. The work is performed in a controlled area in which escorts are needed, it is on the emergency route of the fire department and it is subject to be cleared for operations and for exercises.
b. The Contractor is permitted to use reasonable quantities of available electricity and water at the work site. The Contractor shall alter characteristics and shall observe conservation practices at all times. All connections shall be the responsibility of the Contractor including restorations to initial conditions.
b. Authorized work hours and days. Performance of work hereunder shall be from Monday through Friday excluding holidays from 08.00 to 17.00 hours. Work during week-ends or holidays may be requested by the Contractor with a minimum of 10 days advance notice, however the Contracting Officer has the right to deny such request if reasons requiring week end and holiday work are not valid or for security or other necessities.
c. Toilet facilities in the vicinity of the work site shall not be available for Contractor use. The
Contractor shall provide toilet facilities for use on the site
d. The Contractor shall not use base refuse containers to discard debris. All construction debris shall be discarded by the Contractor off base at authorized sites according to category of debris/refuse in strict observance of all host country laws, decrees and local regulations in force.
e. The Contractor shall be responsible for ensuring all personnel engaged in the performance of this contract observe all host country laws concerning safety and in particular Italian laws D.M.
81/08.
f. If welding is to be performed the Contractor shall ensure a welding permit is obtained from the
Aviano Air Base Fire Department prior to performing welding operations.
31CES/CENM 3
4. WORK DESCRIPTION:
Each item of the schedule is inclusive of furnishing and installation of materials and equipment, scaffolding, transportation to dump, and storage of demolished and/or removed materials, in accordance with contracting officer’s instructions and all finishing work required to make each item complete in a workmanlike manner.
All the quantities that are indicated or successively added are estimates. Therefore the government shall not be held responsible for the accuracy of the estimated quantities.
The contract requires a completed project on a lump sum basis. It is therefore the responsibility of the contractor to calculate, foresee and perform all quantities and work necessary even if it not mentioned in the specifications but included in the drawings or manifestly necessary to deliver a complete project based on its overall scope.
4a. Existing various widths joint replacement, the item consists of:
4a.1.: saw cutting of existing materials;
4a.2.: cleaning;
4a.3.: surface preparing;
4a.4.: furnishing and installation of carburant resistant pre-formed joint sealant. The item includes silicone MAPEFLEX PU 50 SL or similar approved to fill gaps, loading, transportation and disposal in an authorized dump of resulting material and any other item to provide a job in a workmanlike manner.
24,000 l.m.
4b.Paintings, the item consists of touch paint where the joint replacement work damages the existing the item includes loading, transportation and disposal in an authorized dump of resulting material and any other item to provide a job in a workmanlike manner.
LS
5. MATERIAL SUBMITTALS:
Joint Materials and other items shall be submitted for the approval by the Contracting Officer in accordance with “ASHE 18-1077 Schedule of material submittals”
7. ATTACHMENTS:
1. ASHE 18-1077 – MAP
2. ASHE 18-1077 Schedule of material submittals
MALTAURO
G R U P P O tavola titolo:
comittente:
progetto :
tavola N°:
indirizzo :
riferimento a dis. progett. n. scala
Geom. Gianpaolo Bagaroloil topografo :
Rev.
Data Descrizione
IMPRESA COSTRUZIONI GIUSEPPE MALTAURO S.P.A. Viale dell'Industria 42 36100 VICENZA
SOUTH RAMP
PLANIMETRIA AS-BUILT
F-01
CM-101
1 :1000 novembre 2005 rilievo aggiornato al 23.11.2005
CSA 100.000 250.012 118.073
CS6 203.902 373.977 118.959
CS5 302.880 373.949 119.873
CSB 398.229 266.881 121.315
CSF 416.392 69.659 119.320
CS4 426.142 373.933 121.111
CS3 502.507 374.026 121.930
CSE 559.661 95.579 120.937
CS2 626.112 373.945 123.144
CSD 640.977 275.212 122.894
CS1 663.381 200.952 122.148CS1 315087.372 5100792.531 122.148
CS2 314946.788 5100900.009 123.144
CS3 314852.667 5100819.888 121.930
CS4 314794.610 5100770.279 121.111
CS5 314700.792 5100690.331 119.873
CS6 314625.448 5100626.145 118.959
B.M. A 314626.790 5100464.401 118.073 B.M. B 314842.812 5100670.701 121.315 B.M. D 315022.149 5100834.512 122.894 B.M. E 315076.793 5100645.054 120.937 B.M. F 314984.573 5100532.389 119.320
TABELLA DI CORRISPONDENZA COORDINATE CAPISALDI
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
ASHE 18-1077
PROJECT TITLE
SUSTAIN JOINT SEAL SOUTH RAMP
SOLICITATION CONTRACT NUMBER
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
RE
QU
IR
ED
S
UB
MI
SS
IO
N
DA
TE
R
EC
EI
VE
D
IN
CO
NT
RA
CT
IN
G
DA
TE
T O
CI
VI
L
EN
GI
NE
ER
IN
G
RE
TU
RN
S
US
PE
NS
E
SU
BM
IT
TA
L N
UM
BE
RS
NT
RA
CT
OR
R
ES
UB
MI
TT
AL
FI
NA
L A
PP
RO
VA
L
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
CE
RT
IF
IC
AT
IO
N
OF
MP
LIA
NC
E
SH
OP
D
RA
W
IN
G
SA
MP
LE
S
CO
LO
R
SE
LE
CT
IO
N
MA
NU
FA
CT
UR
ER
S
RE
MM
EN
DA
TI
ON
S
MA
NU
FA
CT
UR
S
W
AR
RA
NT
Y
CA
TA
LO
G
TA
OP
AT
IN
G
IN
ST
RU
CT
IO
NS
ST
RU
CT
UR
AL
C
AL
CU
LA
TI
ON
SA
FE
TY
D
AT
A
SH
EE
T
DATE CONTRACTOR
NOTIFIED REMARKS
APPROVED DIS-
APPROVED
1 4a. Joint Material 4 4 30
2 4b.Paintings 4 4 30
File details come from the government source that posted it.