ASHE_18-1077_SOW_Rev_1.pdf

PDF 820 KB Posted

Attached to
FA5682-18-R-0030 ASHE 18-1006, 1009, 1010, & 1077 SUSTAIN JOINT SEAL
Solicitation number
FA5682-18-R-0030
Issued by

About this file

ASHE 18-1077 TECHNICAL SPECIFICATIONS REV 1

View the file

Other files

File Type Posted
FA568218R0030001_Site_Visit_Reschedule_Amend1.pdf PDF
ASHE_18-1009_SOW_Rev_1.pdf PDF
ASHE_18-1077_KCE.xlsx XLSX spreadsheet
ASHE_18-1006_SOW_Rev1.pdf PDF
ASHE_18-1010_KCE.xlsx XLSX spreadsheet
FA568218R0030.pdf PDF
ASHE_18-1010_SOW_Rev_1.pdf PDF
ASHE_18-1009_KCE.xlsx XLSX spreadsheet
Attachment_5__Additional_Requirements.pdf PDF
ASHE_18-1006_KCE.xlsx XLSX spreadsheet
ASHE_18-1006_Sustain_Joint_Seal.pdf PDF
ASHE_18-1009_Sustain_Joint_Seal.pdf PDF
ASHE_18-1010_Sustain_Joint_Seal.pdf PDF
ASHE_18-1077_Sustain_Joint_Seal.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project ASHE 18-1077

DATE: MAY 2018

31CES/CENM

Statement of Work Rev 1

U.S. AIR FORCE

31ST FIGHTER WING

31ST CES/CENM

AVIANO AIR BASE, ITALY

TECHNICAL SPECIFICATION FOR

ASHE 18-1077

SUSTAIN JOINT SEAL SOUTH RAMP,

AVIANO AB, AVIANO (PN) ITALY

31CES/CENM

1. SCOPE OF WORK: The purpose of this project is to replace the existing joint sealants on the concrete slabs. Performance period and phasing are indicated in section F of the solicitation and contract, clause 52.210-11.

2. WORKS LOCATION: Works has to be done at South Ramp, Facility 14683, concrete parking area, Area F, Aviano Air Base, Italy.

3. WORK SITE CONDITIONS:

a. The work is performed in a controlled area in which escorts are needed, it is on the emergency route of the fire department and it is subject to be cleared for operations and for exercises. All unproductive time due to military operations and exercises including delays in accessing the areas of work will not be at the expense of the US Government.

b. The Contractor is permitted to use reasonable quantities of available electricity and water at the work site. The Contractor shall alter characteristics and shall observe conservation practices at all times. All connections shall be the responsibility of the Contractor including restorations to initial conditions.

c. Authorized work hours and days. Performance of work hereunder shall be from Monday through Friday excluding holidays from 08.00 to 17.00 hours. Work during week-ends or holidays may be requested by the Contractor with a minimum of 10 days advance notice, however the Contracting Officer has the right to deny such request if reasons requiring week end and holiday work are not valid or for security or other necessities.

d. Toilet facilities in the vicinity of the work site shall not be available for Contractor use. The

Contractor shall provide toilet facilities for use on the site

e. The Contractor shall not use base refuse containers to discard debris. All construction debris shall be discarded by the Contractor off base at authorized sites according to category of debris/refuse in strict observance of all host country laws, decrees and local regulations in force.

f. The Contractor shall be responsible for ensuring all personnel engaged in the performance of this contract observe all host country laws concerning safety and in particular Italian laws D.M.

81/08.

g. If welding is to be performed the Contractor shall ensure a welding permit is obtained from the Aviano Air Base Fire Department prior to performing welding operations.

4. WORK DESCRIPTION:

Each item of the schedule is inclusive of furnishing and installation of materials and equipment, scaffolding, transportation to dump, and storage of demolished and/or removed materials, in accordance with contracting officer’s instructions and all finishing work required to make each item complete in a workmanlike manner.

All the quantities that are indicated or successively added are estimates. Therefore the government shall not be held responsible for the accuracy of the estimated quantities.

The contract requires a completed project on a lump sum basis. It is therefore the responsibility of the contractor to calculate, foresee and perform all quantities and work necessary even if it not mentioned in the specifications but included in the drawings or manifestly necessary to deliver a complete project based on its overall scope.

31CES/CENM

4a. Existing various widths joint replacement, the item consists of:

4a.1.: saw cutting of existing materials;

4a.2.: cleaning;

4a.3.: surface preparing;

4a.4.: furnishing and installation of carburant resistant pre-formed joint sealant. The item includes silicone MAPEFLEX PU 50 SL or similar approved to fill gaps, loading, transportation and disposal in an authorized dump of resulting material and any other item to provide a job in a workmanlike manner.

24,000 l.m.

4b.Paintings, the item consists of touch paint where the joint replacement work damages the existing the item includes loading, transportation and disposal in an authorized dump of resulting material and any other item to provide a job in a workmanlike manner.

LS

5. MATERIAL SUBMITTALS:

Joint Materials and other items shall be submitted for the approval by the Contracting Officer in accordance with “ASHE 18-1077 Schedule of material submittals”

7. ATTACHMENTS:

1. ASHE 18-1077 – MAP

2. ASHE 18-1077 Schedule of material submittals

MALTAURO

G R U P P O tavola titolo:

comittente:

progetto :

tavola N°:

indirizzo :

riferimento a dis. progett. n. scala

Geom. Gianpaolo Bagaroloil topografo :

Rev.

Data Descrizione

IMPRESA COSTRUZIONI GIUSEPPE MALTAURO S.P.A. Viale dell'Industria 42 36100 VICENZA

SOUTH RAMP

PLANIMETRIA AS-BUILT

F-01

CM-101

1 :1000 novembre 2005 rilievo aggiornato al 23.11.2005

CSA 100.000 250.012 118.073

CS6 203.902 373.977 118.959

CS5 302.880 373.949 119.873

CSB 398.229 266.881 121.315

CSF 416.392 69.659 119.320

CS4 426.142 373.933 121.111

CS3 502.507 374.026 121.930

CSE 559.661 95.579 120.937

CS2 626.112 373.945 123.144

CSD 640.977 275.212 122.894

CS1 663.381 200.952 122.148CS1 315087.372 5100792.531 122.148

CS2 314946.788 5100900.009 123.144

CS3 314852.667 5100819.888 121.930

CS4 314794.610 5100770.279 121.111

CS5 314700.792 5100690.331 119.873

CS6 314625.448 5100626.145 118.959

B.M. A 314626.790 5100464.401 118.073 B.M. B 314842.812 5100670.701 121.315 B.M. D 315022.149 5100834.512 122.894 B.M. E 315076.793 5100645.054 120.937 B.M. F 314984.573 5100532.389 119.320

TABELLA DI CORRISPONDENZA COORDINATE CAPISALDI

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER

ASHE 18-1077

PROJECT TITLE

SUSTAIN JOINT SEAL SOUTH RAMP

SOLICITATION CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

RE

QU

IR

ED

S

UB

MI

SS

IO

N

DA

TE

R

EC

EI

VE

D

IN

CO

NT

RA

CT

IN

G

DA

TE

T O

CI

VI

L

EN

GI

NE

ER

IN

G

RE

TU

RN

S

US

PE

NS

E

SU

BM

IT

TA

L N

UM

BE

RS

NT

RA

CT

OR

R

ES

UB

MI

TT

AL

FI

NA

L A

PP

RO

VA

L

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

CE

RT

IF

IC

AT

IO

N

OF

MP

LIA

NC

E

SH

OP

D

RA

W

IN

G

SA

MP

LE

S

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

S

RE

MM

EN

DA

TI

ON

S

MA

NU

FA

CT

UR

S

W

AR

RA

NT

Y

CA

TA

LO

G

TA

OP

AT

IN

G

IN

ST

RU

CT

IO

NS

ST

RU

CT

UR

AL

C

AL

CU

LA

TI

ON

SA

FE

TY

D

AT

A

SH

EE

T

DATE CONTRACTOR

NOTIFIED REMARKS

APPROVED DIS-

APPROVED

1 4a. Joint Material 4 4 30

2 4b.Paintings 4 4 30

ASHE 18-1077 SOW Rev 1
ASHE 18-1077 Map
ASHE 18-1077 Schedule of material submittals