ASHE_18-1009_SOW_Rev_1.pdf
PDF 170 KB Posted
- Solicitation number
- FA5682-18-R-0030
About this file
ASHE 18-1009 TECHNICAL SPECIFICATIONS REV 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA568218R0030001_Site_Visit_Reschedule_Amend1.pdf | ||
| ASHE_18-1077_KCE.xlsx | XLSX spreadsheet | |
| ASHE_18-1006_SOW_Rev1.pdf | ||
| ASHE_18-1010_KCE.xlsx | XLSX spreadsheet | |
| FA568218R0030.pdf | ||
| ASHE_18-1010_SOW_Rev_1.pdf | ||
| ASHE_18-1009_KCE.xlsx | XLSX spreadsheet | |
| Attachment_5__Additional_Requirements.pdf | ||
| ASHE_18-1077_SOW_Rev_1.pdf | ||
| ASHE_18-1006_KCE.xlsx | XLSX spreadsheet | |
| ASHE_18-1006_Sustain_Joint_Seal.pdf | ||
| ASHE_18-1009_Sustain_Joint_Seal.pdf | ||
| ASHE_18-1010_Sustain_Joint_Seal.pdf | ||
| ASHE_18-1077_Sustain_Joint_Seal.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project ASHE 18-1009
DATE: MAY 2018
31CES/CENM
Statement of Work Rev 1
U.S. AIR FORCE
31ST FIGHTER WING
31ST CES/CENM
AVIANO AIR BASE, ITALY
TECHNICAL SPECIFICATION FOR
ASHE 18-1009
SUSTAIN JOINT SEAL AT ZULU ALT ARM-DEARM,
AVIANO AB, AVIANO (PN) ITALY
31CES/CENM
1. SCOPE OF WORK: The purpose of this project is to replace the existing joint sealants on the concrete slabs. Performance period and phasing are indicated in section F of the solicitation and contract, clause 52.210-11.
2. WORKS LOCATION: Works has to be done at Zulu alternate arm de arm pad, Facility 77901, concrete parking area, Area F, Aviano Air Base, Italy.
3. WORK SITE CONDITIONS:
a. The work is performed in a controlled area in which escorts are needed, it is subject to be cleared for operations and for exercises. All unproductive time due to military operations and exercises including delays in accessing the areas of work will not be at the expense of the US
Government.
b. The Contractor is permitted to use reasonable quantities of available electricity and water at the work site. The Contractor shall alter characteristics and shall observe conservation practices at all times. All connections shall be the responsibility of the Contractor including restorations to initial conditions.
c. Authorized work hours and days. Performance of work hereunder shall be from Monday through Friday excluding holidays from 08.00 to 17.00 hours. Work during week-ends or holidays may be requested by the Contractor with a minimum of 10 days advance notice, however the Contracting Officer has the right to deny such request if reasons requiring week end and holiday work are not valid or for security or other necessities.
d. Toilet facilities in the vicinity of the work site shall not be available for Contractor use. The
Contractor shall provide toilet facilities for use on the site
e. The Contractor shall not use base refuse containers to discard debris. All construction debris shall be discarded by the Contractor off base at authorized sites according to category of debris/refuse in strict observance of all host country laws, decrees and local regulations in force.
f. The Contractor shall be responsible for ensuring all personnel engaged in the performance of this contract observe all host country laws concerning safety and in particular Italian laws D.M.
81/08.
g. If welding is to be performed the Contractor shall ensure a welding permit is obtained from the Aviano Air Base Fire Department prior to performing welding operations.
4. WORK DESCRIPTION:
Each item of the schedule is inclusive of furnishing and installation of materials and equipment, scaffolding, transportation to dump, and storage of demolished and/or removed materials, in accordance with contracting officer’s instructions and all finishing work required to make each item complete in a workmanlike manner.
All the quantities that are indicated or successively added are estimates. Therefore the government shall not be held responsible for the accuracy of the estimated quantities.
The contract requires a completed project on a lump sum basis. It is therefore the responsibility of the contractor to calculate, foresee and perform all quantities and work necessary even if it not mentioned in the specifications but included in the drawings or manifestly necessary to deliver a complete project based on its overall scope.
31CES/CENM
4a. Existing various widths joint replacement, the item consists of:
4a.1.: saw cutting of existing materials;
4a.2.: cleaning;
4a.3.: surface preparation;
4a.4.: furnishing and installation of carburant resistant pre-formed joint sealant. The item includes silicone MAPEFLEX PU 50 SL or similar approved to fill gaps, loading, transportation and disposal in an authorized dump of resulting material and any other item to provide a job in a workmanlike manner.
850 l.m.
4b. Paintings, the item consists of touch paint where the joint replacement work damages the existing markings:
4b.1.: 76 yellow patches about 1.50 sm;
4b.2.: 152 black patches about 3.00 sm;
the item includes loading, transportation and disposal in an authorized dump of resulting material and any other item to provide a job in a workmanlike manner.
LS
5. MATERIAL SUBMITTALS:
Joint Materials and other items shall be submitted for the approval by the Contracting Officer in accordance with “ASHE 18-1009 Schedule of material submittals”
6. ATTACHMENTS:
1. ASHE 18-1009 – MAP
2. ASHE 18-1009 Schedule of material submittals