FA568218R00220002.pdf
PDF 188 KB Posted
- Attached to
- ASHE 18-1072 SUSTAIN INDOOR FIRING RANGE
- Solicitation number
- FA568218R0022
About this file
Solicitation Amendment FA568218R00220002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ASHE_18-1072_Add_1_draft.pdf | ||
| FA568218R00220001.pdf | ||
| ASHE_18-1072_SUSTAIN_INDOOR_FIRING_RANGE_Question_and_Answer.pdf | ||
| ASHE_18-1072_CCEB.xls | XLS spreadsheet | |
| ADDITIONAL_REQUIREMENTS_March_2018.pdf | ||
| ASHE_18-1072_Technical_Specifications_REV._1.pdf | ||
| FA568218R0022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F1F3B77338A001 ASHE 18-1072
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to add addendum #1 ASHE 18-1072 SUSTAIN INDOOR FIRING RANGE BLDG 1433, AREA "F", AVIANO AB, ITALY ADDENDUM #1 as inclusion of part of the technical package. This modification corrects the inaccurate flooring sq.m. total in the initial solicitation This change does NOT change any w ork previously described.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Mar-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA568218R0022
X 9B. DATED (SEE ITEM 11)
02-Mar-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Mar-2018
CODE
31 CONS LGC - FA5682
VIA PORDENONE 89/B, AREA "E" EDIF. 600
BASE AEREA DI AVIANO
AVIANO (PN) 33081
FA5682 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA568218R0022
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required performance has changed from ASHE 18-1072 SUSTAIN INDOOR FIRING RANGE, BLDG. 1433 IAW TECH SPECS DATED FEB 20181. SEE SECTION J FOR APPLICABLE DOCUMENTS IDENTIFYING NUMBER AND DATE2. SEE SECTION L PROVISION 52.236-27 FOR SITE VISIT DATE, TIME, AND PLACE OF CONVENING3. THE MAGNITUDE OF THIS CONSTRUCTION WORK IS
BETWEEN $25,000 AND $100, 000 to ASHE 18-1072 SUSTAIN INDOOR FIRING RANGE BLDG 1433, AREA "F", AVIANO AB, ITALY IAW TECH SPECS DATED FEB 2018 AND ASHE 18-1072 SUSTAIN INDOOR FIRING RANGE BLDG 1433, AREA "F", AVIANO AB, ITALY ADDENDUM #1 DATED MARCH 20181.
SEE SECTION J FOR APPLICABLE DOCUMENTS IDENTIFYING NUMBER AND DATE2. SEE SECTION L PROVISION 52.236-27 FOR SITE VISIT DATE, TIME, AND PLACE OF CONVENING3. THE MAGNITUDE
OF THIS CONSTRUCTION WORK IS BETWEEN $25,000 AND $100, 000.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT,MATERIALS, TRANSPORTATION,
SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN
LISTED STRICTLY IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS CONTRACT
INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED IN SECTION J HEREIN:TECHNICAL
SPECIFICATIONS REV #1 FOR ASHE 18-1072 SUSTAIN INDOOR FIRING RANGE BLDG 1433, AREA "F", AVIANO AB, ITALY DATED FEB 2018-OF THE TECHNICAL SPECIFICATIONS
To:
THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT,MATERIALS, TRANSPORTATION,
SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN
LISTED STRICTLY IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS CONTRACT
INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED IN SECTION J HEREIN:TECHNICAL
SPECIFICATIONS REV #1 FOR ASHE 18-1072 SUSTAIN INDOOR FIRING RANGE BLDG 1433, AREA "F", AVIANO AB, ITALY DATED FEB 2018 AND ASHE 18-1072 SUSTAIN INDOOR FIRING RANGE BLDG
1433, AREA "F", AVIANO AB, ITALY ADDENDUM #1 DATED MARCH 2018 OF THE TECHNICAL
SPECIFICATIONS
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
LIST OF ATTACHMENTS
The following documents are an integral part of this contract:
a. Attachment 1:
Technical Specifications for ASHE 18-1072, Sustain Indoor Firing Range in the 31 FW, Bldg. 1306, Aviano, Italy, dated February 2018 and ASHE 18-1072 SUSTAIN INDOOR FIRING RANGE BLDG 1433, AREA "F", AVIANO AB, ITALY ADDENDUM #1 DATED MARCH 2018
- 5 pages including cover page
b. Attachment 2:
Additional Requirements, dated March 2018
- 3 pages
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
OFFEROR INSTRUCTIONS
L-01. OFFER PREPARATION INSTRUCTIONS
To assure timely and equitable evaluation of offers, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements. The following documents constitute the offer, failure to submit any of the below documents may be cause for rejection of the offer:
1. TECHNICAL ACCEPTABILITY
1a. QUALIFICATION CERTIFICATION Submit current Societa’ Organismi di Attestazione (SOA) certification for category OG01 and classification adequate to cover offeror’s proposed amount for project performance.
1b. EXPERIENCE Submit offeror’s experience with the same work/trades and complexity as the instant requirement. The offeror shall submit evidence of two (2) contracts performed within the last five (5) years from the date of proposal that involved substantially the same work/trades and complexity as the instant requirement.
1c. TECHNICAL DATA Offeror will be required to submit a design plan meeting all specification laid out in technical specifications ASHE 18-1072 SUSTAIN INDOOR FIRING RANGE BLDG 1433, AREA "F", AVIANO AB, ITALY, REV.1 dated February 2018 and ASHE 18-1072 SUSTAIN INDOOR FIRING RANGE BLDG 1433, AREA "F", AVIANO AB, ITALY ADDENDUM #1 dated March 2018
The offeror shall submit a schedule for completion of all works.
2. PRICE OFFER
(a) Complete blocks 14, 15, 16, 19 (only if amendments are issued) and 20A through 20C of the Section A, SF1442.
In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation Sections A through K. These sections constitute the model contract.
(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN) using the amount resulting from the completion of the Construction Cost Estimate Breakdown form. The extended amount must equal the whole Euro unit price multiplied by the number of units.
(c) Complete the necessary fill-ins and certifications in Sections I through K, including Section J Attachment 2 “Additional Requirements”.
(d) The entire solicitation Sections A through M as well as the form Construction Cost Estimate Breakdown shall be returned in their entirety.
L-02. CURRENCY
All prices in response to this solicitation will be in Euro currency.
L-03. OFFER DOCUMENTATION
All offer documentation in response to this solicitation must be submitted in the English language or with a summary translation.
L-04. OFFER SUBMISSION INSTRUCTIONS
Offers in response to this solicitation shall be submitted to reach the issuing office indicated at page 1 of the solicitation, Standard Form 1442 block 7, by the date and time specified in block 13A of the Standard Form 1442.
Submissions of offers must follow the guidance in the table below:
Submission Method Instructions
CD/DVD
Paper copy
Paper copy
Sealed envelope used to submit your offer must show the time and date specified for receipt, solicitation number, and the name and address of the offeror.
- one (1) original paper copy; and
- one (1) redacted paper copy of the Experience indicated in Section L, provision L-01, paragraph 2.
A redacted copy removes all direct references that can identify an offeror by name or other easily recognizable characteristic. The redacted copy will be used during evaluation procedures as detailed in Section M of the solicitation.
- one (1) copy of Diagram and
- one (1) redacted copy of Diagram
- one (1) schedule of works and
- one (1) redacted copy of schedule of works
Electronic copies:
- one (1) original copy; and
- one (1) copy of the Experience indicated in Section L, provision L-01, paragraph 2.
- one (1) copy of Diagram and
- one (1) redacted copy of Diagram
- one (1) schedule of works and
- one (1) redacted copy of schedule of works
- Electronic copies must be submitted on CD or DVD.
Electronic copies may be submitted on the same disk if sufficient capacity is available.
- Flash drives will not be accepted.
Note: Offerors are cautioned that Aviano AB has visitor control procedures. SOME DELAY SHOULD BE ANTICIPATED IF HAND CARRYING OFFERS. Offerors should allow sufficient time PRIOR to the time specified for receipt of offers.
SECTION M - EVALUATION FACTORS FOR AWARD
M-01 SELECTION
a. Basis for Contract Award This solicitation is subject to the Simplified Acquisition procedures (SAP) of the Federal Acquisition Regulation (FAR) 13, Simplified Acquisition Procedures, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), the Air Force Federal Acquisition Regulation Supplement (AFFARS). These regulations are available electronically at the Air Force (AF) FARSite, http://farsite.hill.af.mil. The Government will select the offer of the responsible vendor whose offer represents the best value after evaluation in accordance with the factors indicated in paragraph M-02 below.
b. Number of Contracts to be Awarded- 1
The Government intends to award one contract for the performance of Project ASHE 18-1072 SUSTAIN INDOOR FIRING RANGE BLDG 1433, AREA "F", AVIANO AB, ITALY and ASHE 18-1072 SUSTAIN INDOOR FIRING RANGE BLDG 1433, AREA "F", AVIANO AB, ITALY ADDENDUM #1 dated March 2018.
c. Solicitation Requirements, Terms and Conditions
Offerors are required to meet all solicitation requirements. Failure to comply with the terms and conditions of the solicitation may result in the offeror being ineligible for award.
(End of Summary of Changes)
File details come from the government source that posted it.