ASHE_18-1072_Technical_Specifications_REV._1.pdf

PDF 270 KB Posted

Attached to
ASHE 18-1072 SUSTAIN INDOOR FIRING RANGE
Solicitation number
FA568218R0022
Issued by

About this file

ASHE 18-1072 SUSTAIN INDOOR FIRING RANGE BLDG 1433, AREA "F", AVIANO AB, ITALY REV.1 dated FEBRUARY 2018

View the file

Other files

File Type Posted
ASHE_18-1072_Add_1_draft.pdf PDF
FA568218R00220002.pdf PDF
FA568218R00220001.pdf PDF
ASHE_18-1072_SUSTAIN_INDOOR_FIRING_RANGE_Question_and_Answer.pdf PDF
ASHE_18-1072_CCEB.xls XLS spreadsheet
ADDITIONAL_REQUIREMENTS_March_2018.pdf PDF
FA568218R0022.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project # ASHE 18-1072 Technical Specifications REV.1

DATE: FEB 2018

31CES/CENM 1

U.S. AIR FORCE

31ST FIGHTER WING

31ST CES/CENM

AVIANO AIR BASE, ITALY

ASHE 18-1072 SUSTAIN INDOOR FIRING RANGE

BLDG 1433, AREA "F", AVIANO AB, ITALY

REV.1

31CES/CENM 2

1. PROJECT SCOPE

The Contractor shall furnish all personnel, equipment, material, transportation, supervision and any other necessary item and service to supply and install items, structures and equipment to correct deficiencies found at Indoor Firing Range, Fac.1433. Works may include flooring works and lighting fixtures replacement/upgrade/improvements.

2. WORK SITE CONDITIONS

a. The Contractor is permitted to use reasonable quantities of available electricity and water at the work site. The

Contractor shall alter characteristics and shall observe conservation practices at all times. All connections shall be the responsibility of the Contractor, including restorations to initial conditions.

b. Interruption of utilities. Utilities shall not be interrupted until approval is received from the Contracting Officer.

Any such need shall be requested in writing by the Contractor at least 10 days in advance of the needed interruption. Requests for utility interruption shall indicate the type of utility to be interrupted, the type of operation requiring the interruption, date and duration. To the maximum extent possible interruption shall be scheduled on week ends or U.S. holidays in order to minimize impact to base activities.

c. Authorized work hours and days. Performance of work hereunder shall be from Monday through Friday excluding holidays from 08-00 to 17:00 hours. Work during week ends or holidays may be requested by the Contractor with a minimum of 10 days advance notice, however the Contracting Officer has the right to deny such request if reasons requiring week end and holiday work are not valid or for security or other necessities.

d. Toilet facilities in the vicinity of the work site shall be available for Contractor use. The Contractor shall use facilities in a manner to maintain their state of cleanliness and hygiene.

e. If welding is to be performed the Contractor shall ensure a welding permit is obtained from the Aviano Air Base Fire Department prior to performing welding operations.

f. The Contractor shall not use base refuse containers to discard debris. All construction debris shall be discarded by the Contractor off base at authorized sites according to category of debris/refuse in strict observance of all host country laws, decrees and local regulations in force.

g. The Contractor shall be responsible for ensuring all personnel engaged in the performance of this contract observe all host country laws concerning safety and in particular Italian laws 81/08.

3. MATERIAL SUBMITTAL

Materials and other items listed in MATERIAL SUBMITTAL SCHEDULE shall be submitted as required by the time schedule indicated, for the approval by the Contracting Officer in accordance with clause entitled “Materials and Workmanship”.

4. DECLARATION OF CONFORMITY

Contractor shall provide declaration of conformity for all electrical systems in accordance with D.M. No.37 22/01/2008.

5. O&M MANUALS

Provide Two (2) copies of use, maintenance, repair and safety manuals of the equipment in accordance with the norms in force.

6. WARRANTY POC

Contractor shall provide a Point of Contact with Name, Address, Telephone and Fax number, email address, etc. for all warranty related matters.

31CES/CENM 3

7. NEW WORK ITEMS

7.1 New concrete floor resurfacing for fire range 113 (14 lanes). Item will include:

- Removing joint rubber material, Joint cutting and cleaning;

- Mechanical shoot blasting of existing floor surface up to 2.00 mm in order to remove old resin or glue bringing back the existing industrial flooring surface and prepare an adequate surface for resin application. Including loading and transportation of resulting materials to authorized public dump area.

- Dust vacuum cleaning.

- Supply and apply by spatula-roll of epoxy-concrete vapour barrier coating, “PMC BARRIERA 119 ” or similar approved, (about 1.0kg/sq.m.);

- Supply and apply by spatula of one layer of epoxy primer “PMC RECRE FOND” or similar approved.

Primer will be added by corundum “a rifiuto”;

- Repair of concrete floor damaged by bullets impact using epoxy high resistance treatment “PMC

EPOCOL STUCCO” or similar approved;

- Repair of joints by using poliuretanic- elastomeric “PMC RAYSTON FLEX” or similar approved;

- Supply and apply by roll of pure colored epoxy enamel “PMC RECRE” or similar approved (about

0.4kg/sq.m.) added by corundum “a rifiuto”;

- Supply and apply by roll of final layer of pure colored epoxy enamel “PMC RECRE” or similar approved (about 0.3kg/sq.m.).

- All operations necessary for the workmanlike execution of the work.

Total thickness of the above described multilayer cycle will be not less than 2.0 mm.

420 sq.m.

7.2 New lighting system for fire range 113 (14 lanes). Item will include:

- Removal and disposal of existing lighting system

- Design a deamable lighting system to have minimum 600 lux at 1.0mt high for a 21.0x28mt shooting area. This parameter rules the design and the installation. Lights and electrical components must be mounted behind protection baffles. Fixtures must offer protection against powder deposits. New lighting shall be designed taking in account the following applicable standards and guidelines:

- UFC 3-530-01: Design: Interior and Exterior Lighting and Controls;

- CEI 64-8: LV electrical installations;

- UNI EN 12464-1: Lighting System for indoor working places.

- Recommend horizontal illuminance uniformity ratio shall refers to UFC 3-530-01.

The illuminance uniformity recommended by UFC may be met by modifying the existing position, number and type of fixtures, avoiding any interference with the firing range activity (physical obstacle, clearance distance, dazzle).

- Supply and installation of lighting fixtures, including cabling, metal cable trays, control panel, dedicated breaker in the MDP, connections, accessories and every other item to have a lighting system fully functional, granting requirement lighting level and performed in a workmanlike manner. Exisitng metal supporting structure may be used to support lights fixtures, piping, cable trays and other items related to the lighting system

Lump Sum