FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY Sheet 1 of 15
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 16-1043 AREA F - AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Ia Structural and Civil Demolition Work - Ia Demolizioni Lavori Strutturali e Civili
1 DEMOLITION OF AIRCRAFT STEEL STRUCTURE
Demolizione della struttura di acciaio del simulacro di aereo
IT. No.
Art. n. 1 Ls/Ac
2 REMOVAL OF STEEL CONTROL STAND
Rimozione postazione di controllo in acciaio
IT. No.
Art. n. 2 Ls/Ac
3 REMOVAL AND STORE OF GRAVEL MATERIAL
Rimozione ed accantonamento di ghiaia
IT. No.
Art. n. 3 Cu.m/Mc
4 TRENCH EXCAVATION ON BITUMINOUS PAVEMENT
Scavo in trincea pavimentazione in conglomerato bituminoso
IT. No.
Art. n. 4a Sq.m/Mq
5 TRENCH EXCAVATION ON EARTH
Scavo in trincea per tubazioni di servizio su terra
IT. No.
Art. n. 4b Cu.m/Mc
6 REMOVAL OF UNDERGROUND UTILITIES PIPINGS
Rimozione tubazioni sottoservizi
IT. No.
Art. n. 5 Ls/Ac
EXCAVATION IN ANY KIND OF SOIL FOR NEW WATER
RECIRCULATIO SYSTEM AND NEW GAS TANK YARD
Scavo in terreno per nuovo impianto ricircolo idrico nuova area deposito gpl
IT. No.
Art. n. 6 Cu.m/Mc
8 SLOT OPENING ON EXISTING CONCRETE STRUCTURE
Apertura asole su struttura in cls esistente
IT. No.
Art. n. 7 Ls/Ac
9 DEMOLITION OF UNDERGROUND UTILITIES MANHOLES
Demolizione di pozzetti utenze interrate
IT. No.
Art. n. 8 Ea/No
10 DEMOLITION OF CONCRETE PAD AND BURIED TANK
Demolizione di basamento in cls e di serbatoio interrato
IT. No.
Art. n. 9 Ls/Ac
11 DEMOLITION OF GAS TANK STORAGE AREA
Demolizione dell'area di deposito serbatoi gas
IT. No.
Art. n. 10 Ls/Ac
12 SCARIFICATION OF BITUMINOUS CONCRETE PAVEMENT
Scarifica su pavimentazione in congl. Bituminoso
IT. No.
Art. n. 11 Sq.m/Mq
Total Structural and Civil Demolition - Totale Demolizioni Strutturali e Civili
Ib Mechanical System Demolition - Ib Demolizione Impianti Meccanici
NEUTRALIZATION OF ALL EXISTING LPG PIPING AND TANKS
Messa in sicurezza di tutte le tubazioni e serbatoi GPL esistenti
IT. No.
Art. n. 12 Ls/Ac
14 REMOVAL OF VAPORIZER, VALVES, PIPING
Rimozione di vaporizzatore, valvole e tubazioni GPL
IT. No.
Art. n. 13 Ls/Ac
SUSTAIN FIRE TRAINING AIRCRAFT MOCKUP / RISTRUTTURAZIONE AREA SIMULAZIONE INCENDI VELIVOLI
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
FOR OFFICIAL USE ONLY Sheet 2 of 15
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 16-1043 AREA F - AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
SUSTAIN FIRE TRAINING AIRCRAFT MOCKUP / RISTRUTTURAZIONE AREA SIMULAZIONE INCENDI VELIVOLI
Total Mechanical Work - Totale Lavori Meccanici
Ic Electrical System Demolition - Ic Demolizioni Impianti Elettrici
NOT APPLICABLE/ Non applicabile
TOTAL PART I / Totale Parte I
Part II - STRUCTURAL AND CIVIL WORK / Parte II - Opere Strutturali e Civili
15 CONSTRUCTION BURN AREA CONCRETE PAVEMENT
Costruzione pavimentazione in cls area incendio
IT. No.
Art. n. 1 Sq.m/Mq
16 CONSTRUCTION OF WATER STORAGE TANK
Costruzione di vasca accumulo acqua
IT. No.
Art. n. 2 Ls/Ac
17 GAS SEPARATOR TANK
Vasca separazione gas
IT. No.
Art. n. 3 Ls/Ac
18 DRAINAGE FIELD CONSTRUCTION
Costruzione bacino di dispersione
IT. No.
Art. n. 4 Ls/Ac
19 HDPE LINED TRENCH - Apron Trincea con rivestimento in pead - Piazzale
IT. No.
Art. n. 5a Lm/Ml
FOR OFFICIAL USE ONLY Sheet 3 of 15
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 16-1043 AREA F - AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
SUSTAIN FIRE TRAINING AIRCRAFT MOCKUP / RISTRUTTURAZIONE AREA SIMULAZIONE INCENDI VELIVOLI
20 HDPE LINED TRENCH - BURN AREA
Trincea con rivestimento in pead - Area Incendio
IT. No.
Art. n. 5b Lm/Ml
21 NEW GAS TANK STORAGE AREA
Nuova area deposito serbatoi GPL
IT. No.
Art. n. 6 Ls/Ac
22 BOLLARDS FOR CONTROL STAND PROTECTION
Bitte removibili per protezione locale controllo
IT. No.
Art. n. 7 Ea/No
23 FURNISH/INSTALL 3 MM DIA. COOPER WIRE
Fornitura e posa in opera di cavo di rame dia. 3mm
IT. No.
Art. n. 8 Lm/Ml
24 FURNISH/INSTALL WARNING TAPE
Fornitura e posa in opera di nastro segnalatore
IT. No.
Art. n. 9 Lm/Ml
25 TRENCH BACKFILLING
Rinterro delle trincee
IT. No.
Art. n. 10 Cu.m/Mc
26 CONSTRUCT BITUMINOUS CONCRETE PAVEMENT
Costruzione di pavimentazione conglomerato bituminoso
IT. No.
Art. n. 11 Sq.m/Mq
27 3cm THICK WEARING COURSE ON SCARIFIED AREAS Strato di usura, sp=3cm nelle zone scarificate
IT. No.
Art. n. 12 Sq.m/Mq
28 C28/35 CONCRETE BASEMENT
Basamento in calcestruzzo C28/35
IT. No.
Art. n. 13 Ls/Ac
29 RESTORE GRASS SEEDED AREAS
Ripristino aree a verde
IT. No.
Art. n. 14 Sq.m/Mq
30 CONTROL STAND RENOV. - PAINTING
Rinnovo della postazione di controllo - Pitturazione
IT. No.
Art. n. 15a Sq.m/Mq
31 CONTROL STAND RENOV. - SUSPENDED CEILING
Rinnovo della postazione di controllo - Controsoffitto
IT. No.
Art. n. 15b Sq.m/Mq
32 CONTROL STAND RENOV. - LIGHTING
Rinnovo della postazione di controllo - Illuminazione
IT. No.
Art. n. 15c Ea/No
33 CONTROL STAND RENOV. - WINDOWS RENOVATION
Rinnovo della postazione di controllo - Rinnovo infissi
IT. No.
Art. n. 15d Ls/Ac
34 CONTROL STAND RENOV. - ELEC & MECH REMOVALS
Rinnovo della postazione di controllo - Rimozioni
IT. No.
Art. n. 15e Ls/Ac
35 CONTROL STAND RENOV. - WATER TANK
Rinnovo della postazione di controllo - Vasca idrica
IT. No.
Art. n. 15f Ls/Ac
36 RESTORATION OF DRAINING GRAVEL AREA
Ripristino delle superfici drenanti in ghiaia
IT. No.
Art. n. 16 Ls/Ac
37 FIRE PREVENTION CERTIFICATE (CPI)
Certificato di Prevenzione Incendi (CPI)
IT. No.
Art. n. 17 Ls/Ac
38 PROJECT AS-BUILT
Elaborati As-Built del progetto
Art. n. 18 Ls/Ac
FOR OFFICIAL USE ONLY Sheet 4 of 15
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 16-1043 AREA F - AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
SUSTAIN FIRE TRAINING AIRCRAFT MOCKUP / RISTRUTTURAZIONE AREA SIMULAZIONE INCENDI VELIVOLI
TOTAL PART II - Totale Parte II
IIIa Propane System - IIIa Impianto Propano
LIQUID BURIED PROPANE PIPING WITH COATING AND
FITTINGS - 1-1/2" (40 mm) Tubazioni propano liquido interrate, incamiciate ed accessori - 1- 1/2" (40 mm)
IT. No.
Art. n. 1a Lm/Ml
LIQUID BURIED PROPANE PIPING WITH COATING AND
FITTINGS - 2" (50 mm) Tubazioni propano liquido interrate, incamiciate ed accessori - 2" (50 mm)
IT. No.
Art. n. 1b Lm/Ml
41 VAPOR BURIED PROPANE PIPING AND FITTINGS - 1" (25 mm) Tubazioni propano vapore interrate ed accessori - 3/4" (20 mm)
IT. No.
Art. n. 2a Lm/Ml
42 VAPOR BURIED PROPANE PIPING AND FITTINGS - 2" (50 mm) Tubazioni propano vapore interrate ed accessori - 2" (50 mm)
IT. No.
Art. n. 2b Lm/Ml
43 PAINTED EXPOSED PROP. PIPING AND FITT.- 1" (25 mm) Tubazioni prop. in vista verniciate ed accessori - 3/4" (20 mm)
IT. No.
Art. n. 3a Lm/Ml
44 PAINTED EXPOSED PROP. PIPING AND FITT.- 1-1/2" (40 mm) Tubazioni prop. in vista verniciate ed accessori - 1-1/2" (40 mm)
IT. No.
Art. n. 3b Lm/Ml
PART III - MECHANICAL WORK / Parte III - Opere Meccaniche
FOR OFFICIAL USE ONLY Sheet 5 of 15
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 16-1043 AREA F - AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
SUSTAIN FIRE TRAINING AIRCRAFT MOCKUP / RISTRUTTURAZIONE AREA SIMULAZIONE INCENDI VELIVOLI
45 PAINTED EXPOSED PROP. PIPING AND FITT.- 2" (50 mm) Tubazioni prop. in vista verniciate ed accessori - 2" (50 mm)
IT. No.
Art. n. 3c Lm/Ml
46 PAINTED EXPOSED PROP. PIPING AND FITT.- 2-1/2" (65 mm) Tubazioni prop. in vista verniciate ed accessori - 2-1/2" (65 mm)
IT. No.
Art. n. 3d Lm/Ml
47 STEEL BODY BALL VALVES AND FITTINGS - 3/4" (20 mm) Valvole a sfera in acciaio ed accessori - 3/4" (20 mm)
IT. No.
Art. n. 4a Ea/No
48 STEEL BODY BALL VALVES AND FITTINGS - 1-1/2" (40 mm) Valvole a sfera in acciaio ed accessori - 1-1/2" (40 mm)
IT. No.
Art. n. 4b Ea/No
49 STEEL BODY BALL VALVES AND FITTINGS - 2" (50 mm) Valvole a sfera in acciaio ed accessori - 2" (50 mm)
IT. No.
Art. n. 4c Ea/No
50 STEEL BODY BALL VALVES AND FITTINGS - 2-1/2" (65 mm) Valvole a sfera in acciaio ed accessori - 2-1/2" (65 mm)
IT. No.
Art. n. 4d Ea/No
HYDROSTATIC RELIEF VALVES AND FITTINGS PN40 - 3/4"
(20 mm) Valvole di sicurezza idrostatica PN40 ed accessori - 3/4" (20 mm)
IT. No.
Art. n. 5 Ea/No
52 INSULATION JOINTS AND FITTINGS PN40 - 3/4" (20 mm) Giunti isolanti PN40 ed accessori - 3/4" (20 mm)
IT. No.
Art. n. 6a Ea/No
53 INSULATION JOINTS AND FITTINGS PN40 - 1-1/2" (40 mm) Giunti isolanti PN40 ed accessori - 1-1/2" (40 mm)
IT. No.
Art. n. 6b Ea/No
54 INSULATION JOINTS AND FITTINGS PN40 -2" (50 mm) Giunti isolanti PN40 ed accessori - 2" (50 mm)
IT. No.
Art. n. 6c Ea/No
LPG FEED-OUT VAPORIZER WITH EQUIPMENT AND
FITTINGS
Vaporizzatore GPL tipo feed-out con accessori
IT. No.
Art. n. 7 Ls/Ac
BOILER FOR LPG VAPORIZER WITH CABINET, EQUIPMENT
AND FITTINGS
Gruppo termico per alimentazione vaporizzatore con accessori
IT. No.
Art. n. 8 Ls/Ac
BURIED WATER PREINSULATED PEX-a De50x4,7 DN40
PIPING AND FITTINGS
Tubazioni idriche preisolate PEX-a De50x4,7 DN40 con accessori
IT. No.
Art. n. 9 Lm/Ml
EXHAUST AIR SYSTEM FOR WATER STORAGE TANK AND
GAS SEPARATOR WITH FAN, DUCTS AND FITTINGS
Sistema di estrazione aria da vasca di accumulo idrico e separatore di gas completo di ventilatore, canalizzazioni e accessori
Art. n. 10 Ls/Ac
FOR OFFICIAL USE ONLY Sheet 6 of 15
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 16-1043 AREA F - AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
SUSTAIN FIRE TRAINING AIRCRAFT MOCKUP / RISTRUTTURAZIONE AREA SIMULAZIONE INCENDI VELIVOLI
REMOVAL AND RECOLLOCATION OF EXISTING No.2 3000
LITERS LPG
Rimozione e ricollocazione di no.2 serbatoi esistenti GPL da 3000 litri
IT. No.
Art. n. 11 Ls/Ac
IIIb Fire Protection System - IIIc Impianto Antincendio
59 HDPE BURIED WATER PIPING PN16 AND FITTINGS- 110 mm Tubazioni idriche interrate in PEAD PN16 e accessori- 110 mm
IT. No.
Art. n. 12 Lm/Ml
60 GATE VALVES AND FITTINGS PN16 - 3" (80 mm) Valvole a saracinesca ed accessori PN16 - 3" (80 mm)
IT. No.
Art. n. 13 Ea/No
61 CHECK VALVES AND FITTINGS PN16 - 3" (80 mm) Valvole di ritegno ed accessori PN16 - 3" (80 mm)
IT. No.
Art. n. 14 Ea/No
62 UNI70 HYDRANTS AND FITTINGS
Idranti UNI70 ed accessori
IT. No.
Art. n. 15 Ea/No
63 UNI70 FIRE DEPARTMENT MOTOR PUMP CONNECTION
Attacco motopompa VVF UNI 70
IT. No.
Art. n. 16 Ea/No
70x70x120 CM PREFABRICATED REINFORCED CONCRETE
PIT WITH HEAVY TRAFFIC CAST-IRON COVER
Pozzetto in calcestruzzo armato prefabbricato carrabile 70x70x120 cm
IT. No.
Art. n. 17 Ea/No
65 INSULATED METALLIC CABINET
Armadio metallico isolato
IT. No.
Art. n. 18 Ea/No
66 Y Filter 3" (80 mm) Filtro a Y 3" (80mm)
IT. No.
Art. n. 19 Ea/No
REDUCED AND CONTROLLED PRESSURE ZONE BACK
FLOW PREVENTER PN16 AND FITTINGS- 3'' (80 mm) Disconnettore idaulico a zone di pressione ridotta e controllata PN16 e accessori - 3" (80 mm)
IT. No.
Art. n. 20 Ea/No
HEATING CABLE, INSULATION, ALU JACKET, ELECTRICAL
CONNECTIONS AND ACCESSORIES
Cavo scaldante, isolante, rivestimento in alluminio, alimentazione elettrica ed accessori
IT. No.
Art. n. 21 Ls/Ac
IIIc Water System - IIIc Impianto Idrico
PREFABRICATED PRESSURIZATION SET WITH EQUIPMENT
(CABINET, INVERTER, POWER AND CONTROL
SWITCHBOARD ) AND FITTINGS
Gruppo pressurizzazione prefabbricato con equipaggiamento (cabinato, inverter, quadro alimentazione e controllo) e accessori
Art. n. 22 Ls/Ac
FOR OFFICIAL USE ONLY Sheet 7 of 15
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 16-1043 AREA F - AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
SUSTAIN FIRE TRAINING AIRCRAFT MOCKUP / RISTRUTTURAZIONE AREA SIMULAZIONE INCENDI VELIVOLI
HDPE BURIED WATER PIPING PN16 AND FITTINGS - De 25 mm Tubazioni idriche interrate in PEAD PN16 ed accessori- De 25 mm
IT. No.
Art. n. 23a Lm/Ml
HDPE BURIED WATER PIPING PN16 AND FITTINGS - De 63 mm Tubazioni idriche interrate in PEAD PN16 ed accessori - De 63 mm
IT. No.
Art. n. 23b Lm/Ml
HDPE BURIED WATER PIPING PN16 AND FITTINGS - De 110 mm Tubazioni idriche interrate in PEAD PN16 ed accessori- De 110 mm
IT. No.
Art. n. 23c Lm/Ml
HDPE BURIED WATER PIPING PN16 AND FITTINGS - De 125 mm Tubazioni idriche interrate in PEAD PN16 ed accessori- De 125 mm
IT. No.
Art. n. 23d Lm/Ml
HDPE BURIED WATER PIPING PN16 AND FITTINGS - De 160 mm Tubazioni idriche interrate in PEAD PN16 ed accessori- De 160 mm
IT. No.
Art. n. 23e Lm/Ml
71 GATE VALVES AND FITTINGS - 3/4" (20 mm) Valvole a saracinesca ed accessori - 3/4" (20 mm)
IT. No.
Art. n. 24a Ea/No
72 GATE VALVES AND FITTINGS - 1-1/2" (40 mm) Valvole a saracinesca ed accessori - 1-1/2" (40 mm)
IT. No.
Art. n. 24b Ea/No
73 BALL VALVES AND FITTINGS - 3" (80 mm) Valvole a sfera ed accessori - 3" (80 mm)
IT. No.
Art. n. 25 Ea/No
74 Y Filter 1/2" (15 mm) Filtro a Y 1/2" (15 mm)
IT. No.
Art. n. 26 Ea/No
REDUCED AND CONTROLLED PRESSURE ZONE BACK
FLOW PREVENTER PN16 AND FITTINGS - 1/2'' (15 mm) Disconnettore idaulico a zone di pressione ridotta e controllata PN16 ed accessori- 1/2" (15 mm)
IT. No.
Art. n. 27 Ea/No
WATER PRESSURE REGULATOR/MAKE-UP WATER DEVICE
AND FITT.-1/2" (15mm) Gruppo di riempimento con accessori- 1/2" (15 mm)
IT. No.
Art. n. 28 Ea/No
GALVANIZED STEEL WATER PIPING WITH 50x6,5 mm SLOTS AND FITTINGS- 4" (100 mm) Tubazioni idriche acciaio zincato con aperture 50X6,5 mm ed accessori- 4" (100 mm)
Art. n. 29 Lm/Ml
FOR OFFICIAL USE ONLY Sheet 8 of 15
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 16-1043 AREA F - AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
SUSTAIN FIRE TRAINING AIRCRAFT MOCKUP / RISTRUTTURAZIONE AREA SIMULAZIONE INCENDI VELIVOLI
70x70x120 CM PREFABRICATED REINFORCED CONCRETE
PIT WITH HEAVY TRAFFIC CAST-IRON COVER
Pozzetto in calcestruzzo armato prefabbricato carrabile 70x70x120 cm
IT. No.
Art. n. 30 Ea/No
79 FLOAT VALVES AND FITTINGS - 3" (80 mm) Valvole a galleggiante ed accessori - 3" (80 mm)
IT. No.
Art. n. 31 Ea/No
80 TRANSITION JOINTS HDPE/GALVANIZED STEEL- DN20
Giunti di transizione PEAD/acciaio zincato- DN20
IT. No.
Art. n. 32a Ea/No
81 TRANSITION JOINTS HDPE/GALVANIZED STEEL- DN40
Giunti di transizione PEAD/acciaio zincato- DN40
IT. No.
Art. n. 32b Ea/No
82 TRANSITION JOINTS HDPE/GALVANIZED STEEL- DN80
Giunti di transizione PEAD/acciaio zincato- DN80
IT. No.
Art. n. 32c Ea/No
83 TRANSITION JOINTS HDPE/GALVANIZED STEEL- DN100
Giunti di transizione PEAD/acciaio zincato- DN100
IT. No.
Art. n. 32d Ea/No
84 TRANSITION JOINTS HDPE/GALVANIZED STEEL- DN125
Giunti di transizione PEAD/acciaio zincato- DN125
IT. No.
Art. n. 32e Ea/No
HDPE PE100 SDR 17 BURIED DRAIN WATER PIPING AND
FITTINGS - De 250 mm Tubazioni idriche drenaggio interrate in PEAD PE100 SDR 17 ed accessori- De 250 mm
IT. No.
Art. n. 33 Lm/Ml
MANUAL LEAK MONITORING SYSTEM FOR LPG SUPPLY TO
AIRCRAFT MOCK-UP
Sistema manuale di controllo perdite per le linee di mandata al simulacro
IT. No.
Art. n. 34 Ea/No
MANUAL LEAK MONITORING SYSTEM FOR WATER DRAIN
LINE FROM AIRCRAFT MOCK-UP AND GAS SEPARATOR
SIPHON TO WATER STORAGE TANK
Sistema manuale di controllo perdite per la linea di drenaggio dal simulacro e dal separatore di gas verso la vasca di accumulo idrico
IT. No.
Art. n. 35 Ea/No
70x70x180 CM PREFABRICATED REINFORCED CONCRETE
PIT WITH HEAVY TRAFFIC CAST-IRON COVER
Pozzetto in calcestruzzo armato prefabbricato carrabile 70x70x180 cm
IT. No.
Art. n. 36 Ea/No
IIId Testing - IIId Collaudo
89 MECHANICAL SYSTEM TESTING
Collaudo Impianti Meccanici
Art. n. 37 Ls/Ac
FOR OFFICIAL USE ONLY Sheet 9 of 15
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 16-1043 AREA F - AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
SUSTAIN FIRE TRAINING AIRCRAFT MOCKUP / RISTRUTTURAZIONE AREA SIMULAZIONE INCENDI VELIVOLI
TOTAL PART III / Totale Parte III
90 2 WAYS ELECTRIC CABLE DUCT
Cavidotto elettrico a 2 vie
IT. No.
Art. n. 1a Lm/Ml
91 2 WAYS ELECTRIC CABLE DUCT
Cavidotto elettrico a 2 vie
IT. No.
Art. n. 1b Lm/Ml
92 2 WAYS ELECTRIC CABLE DUCT
Cavidotto elettrico a 2 vie
IT. No.
Art. n. 1c Lm/Ml
93 2 WAYS ELECTRIC CABLE DUCT
Cavidotto elettrico a 2 vie
IT. No.
Art. n. 1d Lm/Ml
94 4 WAYS ELECTRIC CABLE DUCT
Cavidotto elettrico a 4 vie
IT.
No. 1e Lm/Ml
95 4 WAYS ELECTRIC CABLE DUCT
Cavidotto elettrico a 4 vie
IT.
No. 1f Lm/Ml
PART IV- ELECTRICAL WORK / Parte IV - Opere Elettriche
FOR OFFICIAL USE ONLY Sheet 10 of 15
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 16-1043 AREA F - AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
SUSTAIN FIRE TRAINING AIRCRAFT MOCKUP / RISTRUTTURAZIONE AREA SIMULAZIONE INCENDI VELIVOLI
96 PULLING MANHOLES
Pozzetti di tiro
IT.
No. 1g Ea/No
97 PULLING MANHOLE - MH14
Pozzetto di tiro - MH14
IT.
No. 1g Ea/No
98 4P-160A CIRCUIT BREAKER
Interruttore 4P-160A
IT.
No. 2 Ea/No
99 ELECTRICAL LINE 3X1X120+1X70N+1X70PE
Linea elettrica 3X1X120+1X70N+1X70PE.
IT.
No. 3a Lm/Ml
100 ELECTRICAL LINE 3,5x35+25PE Linea elettrica 3,5x35+25PE
IT.
No. 3b Lm/Ml
101 ELECTRICAL LINE 3X1X70+1X35N+1X35PE
Linea elettrica 3X1X70+1X35N+1X35PE
IT.
No. 3c Lm/Ml
102 ELECTRICAL LINE 5G6
Linea elettrica 5G6
IT.
No. 3d Lm/Ml
103 ELECTRICAL LINE 5G10
Linea elettrica 5G10
IT.
No. 3e Lm/Ml
104 ELECTRICAL LINE FG16M16 4G2,5
Linea elettrica FG16M16 4G2,5
IT.
No. 3f Lm/Ml
105 ELECTRICAL LINE FG16M16 4G2,5
Linea elettrica FG16M16 4G2,5
IT.
No. 3e Lm/Ml
104 DISTRIBUTION PANEL DP
Quadro di Distribuzione DP
IT.
No. 4 Ea/No
105 CONTROL BOARD
Quadro Comando
IT.
No. 5 Ea/No
106 LIGHTING POLE
Pali luce
IT.
No. 6 Ea/No
107 LIGHTING POLE CABLEDUCT
Cavidotto per pali luce
IT.
No. 7 Lm/Ml
108 94 W LED FLOODLIGHTS
Proiettori da 94 W a LED
IT.
No. 8 Ea/No
109 GROUNDING /EQUIPOTENTIAL SYSTEM
Impianto di terra/equipotenziale
IT.
No. 9 Ls/Ac
110 TVCC CAMERA SYSTEM
Impianto Telecamera TVCC
IT.
No. 10 Ls/Ac
111 TESTING OF SYSTEMS
Collaudo degli impianti
IT.
No. 11 Ls/Ac
FOR OFFICIAL USE ONLY Sheet 11 of 15
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 16-1043 AREA F - AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
SUSTAIN FIRE TRAINING AIRCRAFT MOCKUP / RISTRUTTURAZIONE AREA SIMULAZIONE INCENDI VELIVOLI
TOTAL PART IV / Totale Parte IV
PART V - AIRCRAFT MOCKUP AND SYSTEMS / Parte V - Simulacro d'aereo e Impianti
Va Aircraft Mockup - Va Simulacro d'aereo
112 NEW AIRCRAFT STEEL MOCK-UP
Nuovo simulacro di aereo in acciaio
IT. No.
Art. n. 1 EA/NO
Total Aircrasft Mockup - Totale Simulacro d'aereo
Vb Training Elements - Internal Fire Places - Punti di Fuoco Interni
113 FIRE PLACE PASSENGER SEAT
Postazione di incendio, sedile passeggeri
IT. No.
Art. n. 2 EA/NO
114 FIRE PLACE AIRCRAFT COCKPIT
Postazione di incendio, abitacolo aereo
IT. No.
Art. n. 3 EA/NO
114 FIRE PLACE BATTERY
Postazione di incendio, batteria
IT. No.
Art. n. 4 EA/NO
115 CARGO BOX
Simulacro carico
IT. No.
Art. n. 5 EA/NO
Lump Sum Total Internal Fire Places - Totale a Corpo Punti di Fuoco Interni
Vc Training Elements - External Fire Places - Punti di Fuoco Esterni
FOR OFFICIAL USE ONLY Sheet 12 of 15
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 16-1043 AREA F - AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
SUSTAIN FIRE TRAINING AIRCRAFT MOCKUP / RISTRUTTURAZIONE AREA SIMULAZIONE INCENDI VELIVOLI
116 FIRE PLACE TURBINE
Postazione di incendio, Turbina
IT. No.
Art. n. 6 EA/NO
117 FIRE PLACE TURBOPROP ENGINE
Postazione di incendio, Turboelica
IT. No.
Art. n. 7 EA/NO
118 FIRE PLACE LANDING GEAR
Postazione di incendio,Carrello di Atterraggio
IT. No.
Art. n. 8 EA/NO
119 FIRE PLACE RAIL - GROUND SPIL FIRE
Postazione di incendio Fusoliera - Simulazione perdita a terra
IT. No.
Art. n. 9 EA/NO
120 FIRE PLACE AUXILIARY POWER UNIT
Postazione di incendio, Alimentazione Ausiliaria
IT. No.
Art. n. 10 EA/NO
121 FIRE PLACE WING - GROUND SPILL FIRE
Postazione di incendio, Ala - Simulazione perdita a terra
IT. No.
Art. n. 11 EA/NO
Lump Sum Total External Fire Places - Totale a Corpo Punti di Fuoco Esterni
Vd Process Equipment - Apparecchiature di processo
122 20' CONTAINER FOR TECHNICAL/CONTROL STATION
Container da 20' per locale tecnico/ controllo
IT. No.
Art. n. 12 LS / AC
123 PILOT BURNER
Bruciatore pilota
IT. No.
Art. n. 13 LS / AC
124 SMOKE GENERATOR
Generatore di fumo
IT. No.
Art. n. 14 LS / AC
125 SMOKE EXTRACTION SYSTEM
Impianto estrazione fumi
IT. No.
Art. n. 15 LS / AC
126 FIRE ROOM STEEL CLADDING
Rivestimento in acciaio
IT. No.
Art. n. 16 LS / AC
127 GAS DETECTION SYSTEM
Impianto rilevazione gas
IT. No.
Art. n. 17 LS / AC
128 TEMPERATURE MONITORING SYSTEM
Impianto di controllo temperatura
IT. No.
Art. n. 18 LS / AC
129 EMERGENCY LIGHTING
Lampade di emergenza
IT. No.
Art. n. 19 LS / AC
130 EMERGENCY SHUT-OFF
Impianto di chiusura di emergenza
IT. No.
Art. n. 20 LS / AC
131 WIRED SYSTEM CONTROL (PC)
Controllo dell'impianto via PC
IT. No.
Art. n. 21 LS / AC
132 WIRELESS REMOTE CONTROL
Controllo dell'impianto via wireless
Art. n. 22 LS / AC
FOR OFFICIAL USE ONLY Sheet 13 of 15
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 16-1043 AREA F - AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
SUSTAIN FIRE TRAINING AIRCRAFT MOCKUP / RISTRUTTURAZIONE AREA SIMULAZIONE INCENDI VELIVOLI
133 MAIN GAS CONTROL SYSTEM
Impianto controllo gas
IT. No.
Art. n. 23 LS / AC
134 INTERNAL SUPPLY PIPEWORK
Tubazioni interne utenze
IT. No.
Art. n. 24 LS / AC
135 PIPE FITTINGS AND INSTRUMENTS
Accessori tubazioni ea apparecchiature
IT. No.
Art. n. 25 LS / AC
136 WATER COOLING
Raffreddamento ad acqua via sprinkler
IT. No.
Art. n. 26 LS / AC
Lump Sum Total Process Equipment - Totale a Corpo Apparecchiature di Processo
Vd Services - Servizi
137 TRANSPORT TO SITE
Trasporto al sito
IT. No.
Art. n. 27 LS / AC
138 INSTALLATION AND COMMISSIONIG
Installazione e prove di funzionamenrto
IT. No.
Art. n. 28 LS / AC
139 3rd PART CERTIFICATION Certificazione da parte di terzi
IT. No.
Art. n. 29 LS / AC
140 DOCUMENTATION
Documentazione
IT. No.
Art. n. 30 LS / AC
141 OPERATOR TRAINING
Istruzone degli operatori
IT. No.
Art. n. 31 LS / AC
Lump Sum Total Services - Totale a Corpo Servizi
TOTAL PART V / Totale Parte V
Part VI - DESIGN SERVICES / Parte VI - Servizi di Progettazione
142 NEW FIRE TRAINING DESIGN SERVICES
Sercizi di Progettazione per la nuova area addestramento incendi
Art. n. 1 LS / AC
FOR OFFICIAL USE ONLY Sheet 14 of 15
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
ASHE 16-1043 AREA F - AVIANO AIR BASE, ITALY
MATERIAL COSTS LABOR COSTS
LINE
NO. ITEM UNIT OF
MEASURE QUANTITY UNIT TOTAL
MANHOUR
S
MANDAYS
AVERAGE
RATE TOTAL OTHER DIRECT
COSTS LINE TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
SUSTAIN FIRE TRAINING AIRCRAFT MOCKUP / RISTRUTTURAZIONE AREA SIMULAZIONE INCENDI VELIVOLI
TOTAL PART VI / Totale Parte VI
PARTI V - PART V - AIRCRAFT MOCKUP AND SYSTEMS
PART II - STRUCTURAL AND CIVIL WORK
PART III - MECHANICAL WORK
TOTAL PRICE
PARTI VI - PART VI - DESIGN SERVICES
PARTI IV - ELECTRICAL WORK
SUMMARY
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS
FOR OFFICIAL USE ONLY Sheet 15 of 17
ASHE 16-1043 - SUSTAIN FIRE TRAINING AIRCRAFT MOCKUP
INSTRUCTIONS FOR COMPLETING AF FORM 3052
TOTAL MATERIAL COSTS €
TOTAL LABOR COSTS €
TOTAL OTHER DIRECT COSTS €
TOTAL DIRECT COSTS €
OVERHEAD % €
SUBTOTAL €
PROFIT % €
TOTAL PRICE €
DATE FIRM NAME
TITLE BY
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).
2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from know data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).
Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued.
Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.
Col 10 Line. Self-explanatory.
Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail toCol 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail toCol 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail toCol 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail toCol 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail toCol 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail toCol 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred andCol 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail toCol 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail toCol 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail toCol 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail toCol 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail toCol 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail toCol 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail toCol 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred andCol 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to
| Computo |
| Riepilogo |
File details come from the government source that posted it.