About this file

Solicitation FA568217R0037 - Amendment 0004

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F1F3A17164A001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate addendum #3 to the project technical specif ications.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Jul-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA568217R0037

X 9B. DATED (SEE ITEM 11)

16-Jun-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Jul-2017

CODE

31 CONS LGC - FA5682

VIA PORDENONE 89/B, AREA "E" EDIF. 600

BASE AEREA DI AVIANO

AVIANO (PN) 33081

FA5682 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA568217R0037

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION,

SUPERVISION AND ANY OTHER NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN:TECHNICAL SPECIFICATIONS PROJECT ASHP 15-1019 CNS INERT MUNITION

STORAGE FACILITY AND DEMO MULTI FACILITIES, AREA G, AVIANO AB, ITALY ADDENDUM #1

AND ADDENDUM #2.A – NEW CONSTRUCTION WORKS.ITEM 0001 IS SUBJECT TO THE STATUTORY

COST LIMITATION OF MINOR CONSTRUCTION AS PER PROVISION 252.236-7006, I.E. $1,000,000.00

To:

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN:TECHNICAL SPECIFICATIONS PROJECT ASHP 15-1019 CNS INERT MUNITION

STORAGE FACILITY AND DEMO MULTI FACILITIES, AREA G, AVIANO AB, ITALY AND ADDENDA #S

1, 2 AND 3.A – NEW CONSTRUCTION WORKS.ITEM 0001 IS SUBJECT TO THE STATUTORY COST

LIMITATION OF MINOR CONSTRUCTION AS PER PROVISION 252.236-7006, I.E. $1,000,000.00

CLIN 0002

The CLIN extended description has changed from:

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN:TECHNICAL SPECIFICATIONS PROJECT ASHP 15-1019 CNS INERT MUNITION

STORAGE FACILITY AND DEMO MULTI FACILITIES, AREA G, AVIANO AB, ITALY ADDENDUM #1

AND ADDENDUM #2.D – DEMOLITION WORKS.

To:

LISTED AT THE PRICE STATED BELOW AND STRICTLY IN ACCORDANCE WITH THE TERMS AND

CONDITIONS OF THIS CONTRACT INCLUDING THE FOLLOWING ATTACHED DOCUMENTS LISTED

IN SECTION J HEREIN:TECHNICAL SPECIFICATIONS PROJECT ASHP 15-1019 CNS INERT MUNITION

FA568217R0037

STORAGE FACILITY AND DEMO MULTI FACILITIES, AREA G, AVIANO AB, ITALY AND ADDENDA #S

1, 2 AND 3.D – DEMOLITION WORKS.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS – CONSTRUCTION CONTRACTS

The following documents are an integral part of this contract:

a. Attachment 1:

Master Technical Specifications for Construction Projects Aviano Air Base, Aviano, Italy, dated November 2005

b. Attachment 2:

Technical Specifications Project ASHP 15-1019 Cns Inert Munition Storage Facility and Demo Multi Facilities, Area G, Aviano AB, Italy dated Jun 2015.

- 148 written pages including cover page and addenda #s 1, 2 and 3

c. Attachment 3:

Drawings

- 20 sheets including cover page

d. Attachment 4:

Additional Requirements, dated June 2017

- 5 pages

e. Attachment 5:

Aviano AB Design Guide Revision including Annexes

- 317 pages

(End of Summary of Changes)

File details come from the government source that posted it. Updated .