The Aviano Air Base Design Guide

T A

B L

E O

F C

O N

T E

N T

TABLE OF CONTENT

ANNEX 1: Leed Requirements for New Construction and Major Renovations

ANNEX 2: Plant Selection Lists

ANNEX 3: Communication Requirements - Aviano Air Base - Italy

ANNEX 4: Copper Cable Configurations

ANNEX 5: Vapor Barriers or Vapor Diffusion Retarders

ANNEX 6: Minimum Antiterrorism Construction Standards - Pre Final Checklist

ANNEX 7: SI Metric System

ANNEX 8: Applicable Details

ANNEX 9: Construction technical norm

ANNEX 10: Functional Systems, Functional Test checklist

REQUIREMENTS FOR NEW CONSTRUCTION

AND MAJOR RENOVATIONS

The following is based on LEED procedure

2009 as regionalized by LEED NC 2009 ITALY

1 Minimum Program Requirement (MPR)

Minimum Program Requirements for New

Construction and Major Renovations:

1.1 COMPLIANCE WITH ENVIRONMENTAL

LAWS

The project must comply with all applicable federal, state, and local building-related environmental laws and regulations in place where the project is located.

1.2 COMPLETE AND PERMANENT BUILDING

OR SPACE

The project shall be designed for, constructed on, and operated on a permanent location on already existing land. The project must include the new, ground-up design and construction, or major renovation, of at least one building in its entirety.

1.3 USE A REASONABLE SITE BOUNDARY

- The project boundary must include all contiguous land that is associated with and supports normal building operations, including all land that was or will be disturbed for the purpose of undertaking the project.

- The project boundary may not include land that is owned by a party other than that which owns the project unless that land is associated with and supports normal building operations.

- Projects located on a campus must have project boundaries such that if all the buildings on campus become certified, then the total land area on the campus would be included within a certified boundary.

- Any given parcel of real property may only be attributed to a simple project building.

- The boundary shall not unreasonably exclude sections of land to create boundaries in unreasonable shapes for the sole purpose of complying with prerequisites or credits.

1.4 COMPLIANCE WITH MINIMUM FLOOR

AREA REQUIREMENTS

The project must include a minimum of 100 square meters of gross floor area.

1.5 COMPLIANCE WITH MINIMUM

OCCUPANCY RATES

The project must serve 1 or more Full Time

Equivalent (FTE) occupants, calculated as an annual average.

1.6 COMMIT TO SHARING WHOLE-BUILDING

ENERGY AND WATER USAGE DATA

Certfied project must commit for sharing with

Energy Manager Authority all available actual whole-project energy and water usage data.

1.7 COMPLIANCE WITH A MINIMUM

BUILDING AREA TO SITE AREA RATIO

The gross floor Area of the project building must be no less than 2 % of the gross land area within the project boundary

2 SUSTAINABLE SITES (SS)

2.1 SS PREREQUISITE 1: CONSTRUCTION

ACTIVITY POLLUTION PREVENTION -

REQUIRED

2.1.1 INTENT:

To reduce pollution from construction activities.

2.1.2 REQUIREMENTS:

Create and implement a pollution control plan for all construction activities associated with the project. The plan must conform to local standards and codes. The plan must describe the measures implemented to accomplish the following controls:

Atmosphere

Soil and subsoil

Surface and underground water

Noise levels

Public health

Urban quality

2.1.3 Potential Technologies and Strategies

Create a pollution prevention plan during the design phase of the project. Consider employing strategies such as temporary and permanent seeding, mulching, earthen dikes, silt fencing, sediment traps and sediment basins.

2.2 SS CREDIT 1: SITE SELECTION - 1 POINT

2.2.1 INTENT:

To avoid the development of inappropriate sites and reduce the environmental impact from the location of a building on a site.

2.2.2 REQUIREMENTS:

Do not develop buildings, hardscape, roads or parking areas on portions of sites that meet any of the following criteria:

- Farmland as defined by local urban development plan

- Areas included in the local river authority jurisdiction

- Areas included in the Forestal Police

Jurisdiction

- Areas included in the Coast Police

Jurisdiction

- Areas included in the Park Police

Jurisdiction

- Areas with public parkland destination

2.2.3 POTENTIAL TECHNOLOGIES AND

STRATEGIES

During the site selection process, give preference to sites that do not include sensitive elements or restrictive land types.

Select a suitable building location and design the building with a minimal footprint to minimize disruption of the environmentally sensitive areas identified above.

2.3 SS CREDIT 2: DEVELOPMENT DENSITY

AND COMMUNITY CONNECTIVITY – 5 POINT

2.3.1 INTENT:

To channel development to urban areas with existing infrastructure, protect

Greenfields, and preserve habitat and natural resources.

2.3.2 REQUIREMENTS:

OPTION 1. Development Density

Construct or renovate a building on a previously developed site and in a community with a minimum density of 2.5 m3/m2. The density calculation is based on a typical two-story downtown development and must include the area of the project being built.

OPTION 2. Community Connectivity

Construct or renovate a building on a site that meets the following criteria:

Is located on a previously developed site

Is within 1/2 mile of a residential area or neighborhood with an average density of 10 units per acre net

Is within 1/2 mile of at least 10 basic services

Has pedestrian access between the building and the services

For mixed-use projects, no more than 1 service within the project boundary may be counted as 1 of the 10 basic services, provided it is open to the public. No more than 2 of the

10 services required may be anticipated (i.e., at least 8 must be existing and operational).

In addition, the anticipated services must demonstrate that they will be operational in the locations indicated within 1 year of occupation of the applicant project.

Examples of basic services include the following:

Bank; Place of Worship; Convenience

Grocery; Day Care Center; Cleaners; Fire

Station; Beauty Salon; Hardware; Laundry;

Library; Medical or Dental Office; Senior Care

Facility; Park; Pharmacy;

Post Office; Restaurant; School; Supermarket;

Theater; Community Center; Fitness Center;

Museum

2.3.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

During the site selection process, give preference to urban sites with pedestrian access to a variety of services.

2.4 SS CREDIT 3: BROWNFIELD

REDEVELOPMENT - 1 POINT

INTENT:

To rehabilitate damaged sites where development is complicated by environmental contamination and to reduce pressure on undeveloped land.

2.4.2 REQUIREMENTS:

OPTION 1

Develop on a site documented as contaminated in accordance with Dlgs 152 –

Ambient Code, part IV – Waste management and rehabilitation of contaminated sites.

OPTION 2

Develop are a site defined as Brownfield published by the Regions or Autonomies

Provinces based on the criteria stated by local

Authorities handing jurisdiction.

2.4.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

During the site selection process, give preference to Brownfield sites. Identify tax incentives and property cost savings.

Coordinate site development plans with remediation activity, as appropriate.

2.5 SS CREDIT 4.1: ALTERNATIVE

TRANSPORTATION—PUBLIC

TRANSPORTATION ACCESS - 6 POINTS

2.5.1 INTENT: To reduce pollution and land

development impacts from automobile use.

2.5.2 REQUIREMENTS:

OPTION 1: Rail Station Proximity

Locate the project within 1/2-mile walking distance (measured from a main building entrance) of an existing or planned and funded commuter rail, light rail or subway station.

OPTION 2: Bus Stop Proximity

Locate the project within 1/4-mile walking distance (measured from a main building entrance) of 1 or more stops for 2 or more public, campus, or private bus lines usable by building occupants.

2.5.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Perform a transportation survey of future building occupants to identify transportation needs. Locate the building near mass transit.

2.6 SS CREDIT 4.2: ALTERNATIVE

TRANSPORTATION—BICYCLE STORAGE AND

CHANGING ROOMS – 1 POINT

INTENT:

To reduce pollution and land development impacts from automobile use.

2.6.2 REQUIREMENTS:

CASE 1. Commercial or Institutional Projects

Provide secure bicycle racks and/or storage within 200 meters of a building entrance for

5% or more of all building users (measured at peak periods).

Provide shower and changing facilities in the building, or within 200 meters of a building entrance, for 0.5% of fulltime equivalent

(FTE) occupants.

CASE 2. Residential Projects

Provide covered storage facilities for securing bicycles for 15% or more of building occupants.

2.6.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Design the building with transportation amenities such as bicycle racks and shower/changing facilities.

2.7 SS CREDIT 4.3: ALTERNATIVE

TRANSPORTATION - LOW-EMITTING AND

FUEL - EFFICIENT VEHICLES - 3 POINTS

INTENT:

To reduce pollution and land development impacts from automobile use.

2.7.2 REQUIREMENTS:

OPTION 1

Provide preferred parking1 for low-emitting and fuel-efficient vehicles for 5% of the total vehicle parking capacity of the site. Providing a discounted parking rate is an acceptable substitute for preferred parking for low-emitting/fuel-efficient vehicles. To establish a meaningful incentive in all potential markets, the parking rate must be discounted at least 20%. The discounted rate must be available to all customers (i.e., not limited to the number of customers equal to

5% of the vehicle parking capacity), publicly posted at the entrance of the parking area and available for a minimum of 2 years.

OPTION 2

Install alternative-fuel fueling stations for 3% of the total vehicle parking capacity of the site. Electric liquid or gaseous fueling facilities in accordance with safety applicable worms.

OPTION 3

Provide low-emitting and fuel-efficient vehicles for 3% of full-time equivalent (FTE) occupants.

Provide preferred parking for these vehicles.

OPTION 4

Provide building occupants access to a low-emitting or fuel-efficient vehicle-sharing program. The following requirements must be met:

One low-emitting or fuel-efficient vehicle must be provided per 3% of FTE occupants, assuming that 1 shared vehicle can carry 8 persons (i.e., 1 vehicle per 267 FTE occupants).

For buildings with fewer than 267 FTE occupants, at least 1 low emitting or fuel-efficient vehicle must be provided.

A vehicle-sharing contract must be provided that has an agreement of at least 2 years.

The estimated number of customers served per vehicle must be supported by documentation.

A narrative explaining the vehicle-sharing program and its administration must be submitted.

Parking for low-emitting and fuel-efficient vehicles must be located in the nearest available spaces in the nearest available parking area. Provide a site plan or area map clearly highlighting the walking path from the parking area to the project site and noting the distance.

2.7.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Provide transportation amenities such as alternative-fuel refueling stations. Consider sharing the costs and benefits of refueling stations with neighbors.

2.8 SS CREDIT 4.4: ALTERNATIVE

TRANSPORTATION - PARKING CAPACITY - 2

POINTS

INTENT:

To reduce pollution and land development impacts from automobile use.

2.8.2 REQUIREMENTS:

CASE 1. Non-Residential Projects

OPTION 1

Size parking capacity to meet but not exceed minimum local zoning requirements.

Provide preferred parking for carpools or vanpools for 5% of the total parking spaces.

OPTION 2

For projects that provide parking for less than

5% of full-time equivalent (FTE) building occupants:

Provide preferred parking for carpools or vanpools, marked as such, for 5% of total parking spaces.

Providing a discounted parking rate is an acceptable substitute for preferred parking for carpool or vanpool vehicles. To establish a meaningful incentive in all potential markets, the parking rate must be discounted at least

20%. The discounted rate must be available to all customers (i.e., not limited to the number of customers equal to 5% of the vehicle parking capacity), publicly posted at the entrance of the parking area, and available for a minimum of 2 years.

OPTION 3

Provide no new parking.

OPTION 4

For projects that have no minimum local zoning requirements, provide 25% fewer parking spaces than the applicable standard listed in the 2003 Institute of Transportation

Engineers (ITE) “Parking Generation” study at http://www.ite.org.

CASE 2. Residential Projects

OPTION 1

Size parking capacity to meet but not exceed minimum local zoning requirements.

Provide infrastructure and support programs to facilitate shared vehicle use such as carpool drop-off areas, designated parking for vanpools, car-share services, ride boards and shuttle services to mass transit.

OPTION 2

Provide no new parking.

CASE 3. Mixed Use (Residential with

Commercial/Retail) Projects

OPTION 1

Mixed-use buildings with less than 10% commercial area must be considered residential and adhere to the residential requirements in Case 2. For mixed-use buildings with more than 10% commercial area, the commercial space must adhere to non-residential requirements in Case 1 and http://www.ite.org/ the residential component must adhere to residential requirements in Case 2.

OPTION 2

Provide no new parking.

2.8.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Minimize parking lot/garage size. Consider sharing parking facilities with adjacent buildings. Consider alternatives that will limit the use of single occupancy vehicles.

2.9 SS CREDIT 5.1: SITE DEVELOPMENT -

PROTECT OR RESTORE HABITAT - 1 POINT

INTENT: To conserve existing natural areas and restore damaged areas to provide habitat and promote biodiversity.

2.9.2 REQUIREMENTS:

CASE 1. Greenfield Sites1

Limit all site disturbance to the following parameters:

40 feet beyond the building perimeter;

10 feet beyond surface walkways, patios, surface parking and utilities;

15 feet beyond primary roadway curbs and main utility branch trenches;

25 feet beyond constructed areas with permeable surfaces (such as pervious paving areas, stormwater detention facilities and playing fields) that require additional staging areas to limit compaction in the constructed area.

CASE 2. Previously Developed2 Areas or

Graded Sites

Restore or protect a minimum of 50% of the site (excluding the building footprint) or 20% of the total site area (including building footprint), whichever is greater, with native or adapted vegetation3. Projects earning SS

Credit 2: Development Density and

Community Connectivity may include vegetated roof surface in this calculation if the plants are native or adapted, provide habitat, and promote biodiversity.

2.9.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Survey Greenfield sites to identify site elements and adopt a master plan for developing the project site. Carefully site the building to minimize disruption to existing ecosystems and design the building to minimize its footprint.

Strategies include stacking the building program, tuck-under parking and sharing parking facilities with neighbors.

Establish clearly-marked construction boundaries to minimize disturbance of the existing site and restore previously degraded areas to their natural state. For previously developed sites, use local and regional governmental agencies, consultants, educational facilities and native plant societies as resources for the selection of appropriate native or adapted plants. Prohibit plants listed as invasive or noxious weed species. Once established, native/adapted plants require minimal or no irrigation; do not require active maintenance such as mowing or chemical inputs such as fertilizers, pesticides or herbicides; and provide habitat value and promote biodiversity through avoidance of monoculture plantings.

2.10 SS CREDIT 5.2: SITE DEVELOPMENT -

MAXIMIZE OPEN SPACE - 1 POINT

INTENT:

To promote biodiversity by providing a high ratio of open space to development footprint.

2.10.2 REQUIREMENTS:

CASE 1. Sites with Local Zoning Open Space

Requirements

Reduce the development footprint1 and/or provide vegetated open space within the project boundary such that the amount of open space exceeds local zoning requirements by 25%.

CASE 2. Sites with No Local Zoning

Requirements (e.g. some university campuses, military bases)

Provide a vegetated open space area adjacent to the building that is equal in area to the building footprint.

CASE 3. Sites with Zoning Ordinances but No

Open Space Requirements

Provide vegetated open space equal to 20% of the project site area.

ALL CASES

For projects in urban areas that earn SS Credit

2: Development Density and Community

Connectivity, vegetated roof areas can contribute to credit compliance.

For projects in urban areas that earn SS Credit

2: Development Density and Community

Connectivity, pedestrian-oriented hardscape areas can contribute to credit compliance. For such projects, a minimum of 25% of the open space counted must be vegetated.

Wetlands or naturally designed ponds may count as open space and the side slope gradients average 1:4 (vertical: horizontal) or less and are vegetated.

2.10.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Perform a site survey to identify site elements and adopt a master plan for developing the project site. Select a suitable building location and design the building footprint to minimize site disruption. Strategies include stacking the building program, tuck-under parking and sharing parking facilities with neighbors to maximize the amount of open space on the site.

2.11 SS CREDIT 6.1: STORMWATER DESIGN -

QUANTITY CONTROL - 1 POINT

INTENT:

To limit disruption of natural hydrology by reducing impervious cover, increasing on-site infiltration, reducing or eliminating pollution from stormwater runoff and eliminating contaminants.

2.11.2 REQUIREMENTS:

CASE 1. Sites with Existing Imperviousness

50% or Less

OPTION 1

Implement a stormwater management plan that prevents the postdevelopment peak discharge rate and quantity from exceeding the predevelopment peak discharge rate and quantity for the 1- and 2-year 24-hour design storms.

OPTION 2

Implement a stormwater management plan that protects receiving stream channels from excessive erosion. The stormwater management plan must include stream channel protection and quantity control strategies.

CASE 2. Sites with Existing Imperviousness

Greater Than 50%

Implement a stormwater management plan that results in a 25% decrease in the volume of stormwater runoff from the 2-year 24-hour design storm.

2.11.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Design the project site to maintain natural stormwater flows by promoting infiltration.

Specify vegetated roofs, pervious paving and other measures to minimize impervious surfaces. Reuse stormwater for non-potable uses such as landscape irrigation, toilet and urinal flushing, and custodial uses.

2.12 SS CREDIT 6.2: STORMWATER DESIGN -

QUALITY CONTROL - 1 POINT

INTENT:

To limit disruption and pollution of natural water flows by managing stormwater runoff.

2.12.2 REQUIREMENTS:

Implement a stormwater management plan that reduces impervious cover, promotes infiltration and captures and treats the stormwater runoff from 90% of the average annual rainfall1 using acceptable best management practices (BMPs).

BMPs used to treat runoff must be capable of removing 80% of the average annual postdevelopment total suspended solids (TSS) load based on existing monitoring reports.

BMPs are considered to meet these criteria if:

They are designed in accordance with standards and specifications from a state or local program that has adopted these performance standards, There exists infield performance monitoring data demonstrating compliance with the criteria. Data must conform to accepted protocol (e.g., Technology Acceptance

Reciprocity Partnership [TARP], Washington

State Department of Ecology) for BMP monitoring.

2.12.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Use alternative surfaces (e.g., vegetated roofs, pervious pavement, grid pavers) and nonstructural techniques (e.g., rain gardens, vegetated swales, disconnection of imperviousness, rainwater recycling) to reduce imperviousness and promote infiltration and thereby reduce pollutant loadings.

Use sustainable design strategies (e.g., low-impact development, environmentally sensitive design) to create integrated natural and mechanical treatment systems such as constructed wetlands, vegetated filters and open channels to treat stormwater runoff.

2.13 SS CREDIT 7.1: HEAT ISLAND EFFECT –

NONROOF - 1 POINT

INTENT:

To reduce heat islands to minimize impacts on microclimates and human and wildlife habitats.

2.13.2 REQUIREMENTS:

OPTION 1

Use any combination of the following strategies for 50% of the site hardscape

(including roads, sidewalks, courtyards and parking lots):

Provide shade from the existing tree canopy or within 5 years of landscape installation.

Landscaping (trees) must be in place at the time of occupancy.

Provide shade from structures covered by solar panels that produce energy used to offset some nonrenewable resource use.

Provide shade from architectural devices or structures that have a solar reflectance index2

(SRI) of at least 29.

Use hardscape materials with an SRI of at least 29.

Use an open-grid pavement system (at least

50% pervious).

OPTION 2

Place a minimum of 50% of parking spaces under cover. Any roof used to shade or cover parking must have an SRI of at least 29, be a vegetated green roof or be covered by solar panels that produce energy used to offset some nonrenewable resource use.

2.13.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Employ strategies, materials and landscaping techniques that reduce the heat absorption of exterior materials. Use shade from native or adapted trees and large shrubs, vegetated trellises or other exterior structures supporting vegetation. Consider using new coatings and integral colorants for asphalt to achieve light-colored surfaces instead of blacktop. Position photovoltaic cells to shade impervious surfaces.

Consider replacing constructed surfaces (e.g., roof, roads, sidewalks, etc.) with vegetated surfaces such as vegetated roofs and open grid paving or specify high-albedo materials, such as concrete, to reduce heat absorption.

2.14 SS CREDIT 7.2: HEAT ISLAND EFFECT –

ROOF - 1 POINT

INTENT:

To reduce heat islands to minimize impacts on microclimates and human and wildlife habitats.

2.14.2 REQUIREMENTS

OPTION 1

Use roofing materials with a solar reflectance index (SRI) equal to or greater than the values in the table below for a minimum of 75% of the roof surface.

Roofing materials having a lower SRI value than those listed below may be used if the weighted rooftop SRI average meets the following criteria:

Area Roof Meeting Minimum SRI x

SRI of Installed Roof

>= 75%

Total Roof Area

Required

SRI

ROOF TYPE SLOPE SRI

Low sloped roof

<=15% 78

Steep sloped roof

>15% 29

OPTION 2

Install a vegetated roof that covers at least

50% of the roof area.

OPTION 3

Install high-albedo and vegetated roof surfaces that, in combination, meet the following criteria:

Area Roof Meeting Minimum SRI/0.75

+ Area of Vegetated Roof/0.5

>= Total Roof Area

ROOF TYPE SLOPE SRI

Low sloped roof

<=15% 78

Steep sloped roof

>15% 29

3 WATER EFFICIENCY

3.1 WE PREREQUISITE 1: WATER USE

REDUCTION – REQUIRED

INTENT:

To increase water efficiency within buildings to reduce the burden on municipal water supply and wastewater systems.

3.1.2 REQUIREMENTS:

Employ strategies that in aggregate use 20% less water than the water use baseline calculated for the building (not including irrigation).

Calculate the baseline according to the indications provided by UNI 9182 code.

3.1.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Consider using declared high-efficiency sanitary fixtures. Reduce the potable water by separating the potable water lines from technical water lines and feed the last one with recycled water like storm water and condensate diluted water. Utilize recycled water for toilet discharge, fire protection, air conditioning systems.

3.2 WE CREDIT 1: WATER EFFICIENT

LANDSCAPING - 2–4 POINTS

INTENT:

To limit or eliminate the use of potable water or other natural surface or subsurface water resources available on or near the project site for landscape irrigation.

3.2.2 REQUIREMENTS:

OPTION 1. Reduce by 50% (2 points)

Reduce potable water consumption for irrigation by 50% from a calculated midsummer baseline case. Reductions must be attributed to any combination of the following items:

- Plant species, density and microclimate factor

- Irrigation efficiency

- Use of captured rainwater

- Use of recycled wastewater

- Use of water treated and conveyed by a public agency specifically for nonpotable uses

Groundwater seepage that is pumped away from the immediate vicinity of building slabs and foundations may be used for landscape irrigation to meet the intent of this credit.

However, the project team must demonstrate that doing so does not affect site stormwater management systems.

OPTION 2. No Potable Water Use or

Irrigation1 (4 points)

Meet the requirements for Option 1.

PATH 1

Use only captured rainwater, recycled wastewater, recycled graywater or water treated and conveyed by a public agency pecifically for nonpotable uses for irrigation.

PAT H 2

Install landscaping that does not require permanent irrigation systems. Temporary irrigation systems used for plant establishment are allowed only if removed within a period not to exceed 18 months of installation.

3.2.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Perform a soil/climate analysis to determine appropriate plant material and design the landscape with native or adapted plants to reduce or eliminate irrigation requirements.

Where irrigation is required, use high-efficiency equipment and/or climate-based controllers.

3.3 WE CREDIT 2: INNOVATIVE WASTEWATER

TECHNOLOGIES – 2 POINTS

INTENT:

To reduce wastewater generation and potable water demand while increasing the local aquifer recharge.

3.3.2 REQUIREMENTS:

OPTION 1

Reduce potable water use for building sewage conveyance by 50% through the use of water-conserving fixtures (e.g., water closets, urinals) or nonpotable water (e.g., captured rainwater, recycled graywater, on-site or municipally treated wastewater).

OPTION 2

Treat 50% of wastewater on-site to tertiary standards. Treated water must be infiltrated or used on-site.

3.3.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Specify high-efficiency fixtures and dry fixtures to reduce wastewater volumes.

Consider reusing storm water or gray water for sewage conveyance or on-site mechanical and/or natural wastewater treatment systems.

Options for on-site wastewater treatment include packaged biological nutrient removal systems, constructed wetlands and high-efficiency filtration systems.

3.4 WE CREDIT 3: WATER USE REDUCTION -

2–4 POINTS

INTENT:

To further increase water efficiency within buildings to reduce the burden on municipal water supply and wastewater systems.

3.4.2 REQUIREMENTS:

Employ strategies that in aggregate use less water than the water use baseline calculated for the building (not including irrigation).

The minimum water savings percentage for each point threshold is as follows:

PERCENTAGE

REDUCTION

POINTS

30% 2

35% 3

40% 4

Calculate the baseline according to UNI 9182

3.4.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Use WaterSense-certified fixtures and fixture fittings where available. Use high-efficiency fixtures and dry fixtures. Consider using alternative on-site sources of water (e.g., rainwater, stormwater, and air conditioner condensate, graywater) for nonpotable applications. The quality of any alternative source of water being used must be taken into consideration based on its application or use.

ENERGY & ATMOSPHERE

EA PREREQUISITE 1: FUNDAMENTAL

COMMISSIONING OF BUILDING ENERGY

SYSTEMS – REQUIRED

INTENT:

To verify that the project’s energy-related systems are installed, and calibrated to perform according to the owner’s project requirements, basis of design and construction documents. Benefits of commissioning include reduced energy use, lower operating costs, fewer contractor callbacks, better building documentation, improved occupant productivity and verification that the systems perform in accordance with the owner’s project requirements.

4.1.2 REQUIREMENTS:

The following commissioning process activities must be completed by the project team:

- Designate an individual as the commissioning authority (CxA) to lead, review and oversee the completion of the commissioning process activities.

- The CxA must have documented commissioning authority experience in at least 2 building projects.

- The individual serving as the CxA must be independent of the project design and construction management, though the CxA may be an employee of any firm providing those services. The CxA may be a qualified employee or consultant of the owner.

- The CxA must report results, findings and recommendations directly to the owner.

- For projects smaller than 5000 gross m2, the

CxA may be a qualified person on the design or construction team who has the required experience

- The owner must document the owner’s project requirements. The design team must develop the basis of design. The CxA must review these documents for clarity and completeness. The owner and design team must be responsible for updates to their respective documents.

- Develop and incorporate commissioning requirements into the construction documents.

- Develop and implement a commissioning plan.

- Verify the installation and performance of the systems to be commissioned.

- Complete a summary commissioning report.

Commissioned Systems:

Commissioning process activities must be completed for the following energy-related systems, at a minimum:

- Heating, ventilating, air conditioning and refrigeration (HVAC&R) systems

(mechanical and passive) and associated controls

- Lighting and daylighting controls

- Domestic hot water systems

- Renewable energy systems (e.g., wind, solar)

4.1.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Engage a CxA as early as possible in the design process. Determine the owner’s project requirements, develop and maintain a commissioning plan for use during design and construction and incorporate commissioning requirements in bid documents. Assemble the commissioning team, and prior to occupancy verify the performance of energy consuming systems. Complete the commissioning reports with recommendations prior to accepting the commissioned systems.

EA PREREQUISITE 2: MINIMUM ENERGY

PERFORMANCE – REQUIRED

INTENT:

To establish the minimum level of energy efficiency for the proposed building and systems to reduce environmental and economic impacts associated with excessive energy use.

4.2.2 REQUIREMENTS:

The mandatory prerequisite is finalized to the low conformance in terms of building energetic performance. Legislative Decrees n.

192/311 and 56 require a containment on energetic losses with declared limits only for winter heating. The national Guide-lines annected to 26-june 2009 Decree, for a building that uses for winter heating an energy amount within the limits of DL 192/311 apply a “D” class. For the Domestic hot water production to have a class D the energetic consumption shall remain between 18 kWh/m2 year and 21 kWh/m2 year. The accepted calculation methods are provided by

UNI TS 11300 codes.

The minimum energy requirements are:

For residential:

Index of energetic efficiency for winter heating between 45.27 kWh/m2 for s/v ≤ 0.2 ratio and 122.30 kWh/m2 for s/v ≥ 0.9 ratio

For all the other applications:

Index of energetic efficiency for winter heating between 10.69 kWh/m3 for S/V ≤ 0.2 ratio and 25.49 kWh/m3 for S/V ≥ 0.9 ratio

HW Production from 18 kWh/m2 year to 21 kWh/m2 year in accordance with S/V.

Coordinated Text DL192/311 Building

Energetic requirements index of performance for winter heating.

Residential Buildings, class E1, excluded colleges, religions housing, conviction jails, barracks.

Limit value of performance index for winter heating expressed in kWh/m2 year

VOLUME

ON

SURFACE

RATIO

CLIMATIC ZONE E DEGREE

DAYS

from 2101 Aviano to 3000

S/V <= 0.2 40 45.27 55

S/V <= 0.9 110 122.3 145

The performance index for winter heating shall be between 45.27 kWh/m2 and 122.3 kWh/m2 for S/V between 0.2 and 0.9

For all Other Buildings:

Limit value of performance index for winter heating expressed in kWh/m3 year

VOLUME

ON

SURFACE

RATIO

CLIMATIC ZONE E DEGREE

DAYS

from 2101 Aviano to 3000

S/V <= 0.2 9.6 10.69 12.7

S/V <= 0.9 22.5 25.49 31

The performance index for winter heating shall be between 10.69 kWh/m3 and 25.49 kWh/m3 for S/V between 0.2 and 0.9.

4.2.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Design the building envelope and systems to meet baseline requirements. Use a computer simulation model to assess the energy performance and identify the most cost-effective energy efficiency measures.

Quantify energy performance compared with a baseline building.

4.3 EA PREREQUISITE 3: FUNDAMENTAL

REFRIGERANT MANAGEMENT – REQUIRED

4.3.1 INTENT:

To reduce stratospheric ozone depletion.

4.3.2 REQUIREMENTS:

Zero use of chlorofluorocarbon (CFC)-based refrigerants in building heating, ventilating, air conditioning and refrigeration (HVAC&R) systems.

4.3.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Specify for new building equipment that uses refrigerant in conformance with current laws.

Dispose as for current law the exiting refrigerants.

4.4 EA CREDIT 1: OPTIMIZE ENERGY

PERFORMANCE - 1–19 POINTS

4.4.1 INTENT:

To achieve increasing levels of energy performance beyond the prerequisite standard to reduce environmental and economic impacts associated with excessive energy use.

4.4.2 REQUIREMENTS

Whole Building Energy saving (1–19 points)

Demonstrate a percentage improvement in the proposed building performance rating compared with the baseline building performance rating. Calculate the baseline building performance according to DL 192/311.

The minimum energy cost savings percentage for each point threshold as follows:

New Buildings Renovations

Points

12% 8% 1 14% 10% 2 16% 12% 3 18% 14% 4 20% 16% 5 22% 18% 6 24% 20% 7 26% 22% 8 28% 24% 9 30% 26% 10 32% 28% 11 34% 30% 12 36% 32% 13 38% 34% 14 40% 36% 15 42% 38% 16 44% 40% 17 46% 42% 18 48% 44% 19

Energy analysis done in accordance with UNI

TS 11300-1 UNI TS 11300-2

4.4.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Design the building envelope and systems to maximize energy performance. Use a computer simulation model to assess the energy performance and identify the most cost-effective energy efficiency measures.

Quantify energy performance compared with a baseline building.

4.5 EA CREDIT 2: ON-SITE RENEWABLE

ENERGY - 1–7 POINTS

4.5.1 INTENT:

To encourage and recognize increasing levels of on-site renewable energy self-supply to reduce environmental and economic impacts associated with fossil fuel energy use.

4.5.2 REQUIREMENTS:

Use on-site renewable energy systems to offset building energy costs. Calculate project performance by expressing the energy produced by the renewable systems as a percentage of the building’s annual energy cost and use the table below to determine the number of points achieved.

The minimum renewable energy percentage for each point threshold is as follows:

Percentage Renewable Energy

Points

2.5% 1 5% 2 7.5% 3

10% 4 12.5% 5 15% 6 17.5% 7

4.5.3 POTENTIAL TECHNOLOGIES &

Assess the project for nonpolluting and renewable energy potential including solar, wind, geothermal, low-impact hydro, biomass and bio-gas strategies. When applying these strategies, take advantage of net metering with the local utility.

4.6 EA CREDIT 3: ENHANCED

COMMISSIONING - 2 POINTS

4.6.1 INTENT:

To begin the commissioning process early in the design process and execute additional activities after systems performance verification is completed.

4.6.2 REQUIREMENTS:

Implement, or have a contract in place to implement, the following additional commissioning process activities in addition to the requirements of EA Prerequisite 1:

Fundamental Commissioning of Building

Energy Systems and in accordance with the

LEED Reference Guide for Green Building

Design and Construction, 2009 Edition:

- Prior to the start of the construction documents phase, designate an independent commissioning authority (CxA) to lead, review and oversee the completion of all commissioning process activities.

- The CxA must have documented commissioning authority experience in at least 2 building projects.

- The individual serving as the CxA:

- Must be independent of the work of design and construction.

- Must not be an employee of the design firm, though he or she may be contracted through them.

- Must not be an employee of, or contracted through, a contractor or construction manager holding construction contracts.

- May be a qualified employee or consultant of the owner.

- The CxA must report results, findings and recommendations directly to the owner.

- The CxA must conduct, at a minimum, 1 commissioning design review of the owner’s project requirements basis of design, and design documents prior to the mid-construction documents phase and back-check the review comments in the subsequent design submission.

- The CxA must review contractor submittals applicable to systems being commissioned for compliance with the owner’s project requirements and basis of design. This review must be concurrent with the review of the architect or engineer of record and submitted to the design team and the owner.

- The CxA or other project team members must develop a systems manual that gives future operating staff the information needed to understand and optimally operate the commissioned systems.

- The CxA or other project team members must verify that the requirements for training operating personnel and building occupants have been completed.

- The CxA must be involved in reviewing the operation of the building with operations and maintenance (O&M) staff and occupants within 10 months after substantial completion. A plan for resolving outstanding commissioning-related issues must be included.

4.6.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Although it is preferable that the CxA be contracted by the owner, for the enhanced commissioning credit the CxA may also be contracted through the design firms or construction management firms not holding construction contracts.

The LEED Reference Guide for Green Building

Design and Construction, 2009 Edition provides detailed guidance on the rigor expected for the following process activities:

- Commissioning design review

- Commissioning submittal review

- Systems manual.

4.7 EA CREDIT 4: ENHANCED REFRIGERANT

MANAGEMENT - 2 POINTS

4.7.1 INTENT:

To reduce ozone depletion and support early compliance with the Montreal Protocol while minimizing direct contributions to climate change.

4.7.2 REQUIREMENTS:

OPTION 1

Do not use refrigerants.

OPTION 2

Select refrigerants and heating, ventilation, air conditioning and refrigeration (HVAC&R) equipment that minimize or eliminate the emission of compounds that contribute to ozone depletion and climate change. The base building HVAC&R equipment must comply with the following formula, which sets a maximum threshold for the combined contributions to ozone depletion and global warming potential:

LCGWP ≤ 13

LCGWP = [GWPr x (Lr x Life +Mr) x Rc]/Life

LCGWP: Lifecycle Direct Global Warming

Potential [kg CO2/ (kW/ycar)]

For multiple types of equipment, a weighted average of all base building HVAC&R equipment must be calculated using the following formula:

( LCGWP) x Qunit <=13

Qtotal

Qunit = Gross eurovent rated cooling capacity of an individual HVAC or refrigeration unit

(kW)

Qtotal = Total gross eurovent rated cooling capacity of all HVAC or refrigeration

Small HVAC units (defined as containing less than 0.5 pounds of refrigerant) and other equipment, such as standard refrigerators, small water coolers and any other cooling equipment that contains less than 0.5 pounds of refrigerant, are not considered part of the base building system and are not subject to the requirements of this credit.

Do not operate or install fire suppression systems that contain ozone-depleting substances such as CFCs, hydrochlorofluorocarbons (HCFCs) or halons.

4.7.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Design and operate the facility without mechanical cooling and refrigeration equipment. Where mechanical cooling is used, utilize base building HVAC&R systems for the refrigeration cycle that minimize direct impact on ozone depletion and global climate change. Select HVAC&R equipment with reduced refrigerant charge and increased equipment life. Maintain equipment to prevent leakage of refrigerant to the atmosphere. Use fire suppression systems that do not contain HCFCs or halons.

4.8 EA CREDIT 5: MEASUREMENT AND

VERIFICATION - 3 POINTS

4.8.1 INTENT:

To provide for the ongoing accountability of building energy consumption over time.

4.8.2 REQUIREMENTS:

OPTION 1

Develop and implement a measurement and verification (M&V) plan consistent with

Option D: Calibrated Simulation (Savings

Estimation Method 2) as specified in the

International Performance Measurement &

Verification Protocol (IPMVP) Volume III:

Concepts and Options for Determining

Energy Savings in New Construction, April

2003.

The M&V period must cover at least 1 year of post-construction occupancy.

Provide a process for corrective action if the results of the M&V plan indicate that energy savings are not being achieved.

OPTION 2

Develop and implement a measurement and verification (M&V) plan consistent with

Option B: Energy Conservation Measure

Isolation, as specified in the International

Performance Measurement & Verification

Protocol (IPMVP) Volume III: Concepts and

Options for Determining Energy Savings in

New Construction, April 2003.

The M&V period must cover at least 1 year of post-construction occupancy.

Provide a process for corrective action if the results of the M&V plan indicate that energy savings are not being achieved.

4.8.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Develop an M&V plan to evaluate building and/or energy system performance.

Characterize the building and/or energy systems through energy simulation or engineering analysis. Install the necessary metering equipment to measure energy use.

Track performance by comparing predicted performance to actual performance, broken down by component or system as appropriate.

Evaluate energy efficiency by comparing actual performance to baseline performance.

While the IPMVP describes specific actions for verifying savings associated with energy conservation measures (ECMs) and strategies, this LEED credit expands upon typical IPMVP

M&V objectives.

Measurement & verification activities should not necessarily be confined to energy systems where ECMs or energy conservation strategies have been implemented.

The IPMVP provides guidance on M&V strategies and their appropriate applications for various situations.

These strategies should be used in conjunction with monitoring and trend logging of significant energy systems to provide for the ongoing accountability of building energy performance.

For the corrective action process, consider installing diagnostics within the control system to alert the staff when equipment is not being optimally operated.

Conditions that might warrant alarms to alert staff could include:

- Leaking valves in the cooling and heating coils within air handling units;

- Missed economizer opportunities (e.g., faulty economizer damper controls) ;

- Software and manual overrides allowing equipment to operate 24 hours a day/7 days a week;

- Equipment operation during unusual circumstances (e.g., boiler on when outside air temperature is above 65 °F).

4.9 EA CREDIT 6: GREEN POWER - 2 POINTS

4.9.1 INTENT:

To encourage the development and use of grid-source, renewable energy technologies on a net zero pollution basis.

4.9.2 REQUIREMENTS:

Engage in at least a 2-year renewable energy contract to provide at least 35% of the building’s electricity from renewable sources.

Determine the required electric load as base line and evaluate the 35% to apply.

4.9.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Determine the energy needs of the building and investigate opportunities to save anergy of the building using renewable sources.

MR PREREQUISITE 1: STORAGE AND

COLLECTION OF RECYCLABLES – REQUIRED

5. INTENT:

To facilitate the reduction of waste generated by building occupants that is hauled to and disposed of in landfills.

5.1.2 REQUIREMENTS:

Provide an easily-accessible dedicated area or areas for the collection and storage of materials for recycling for the entire building.

Materials must include, at a minimum: paper, corrugated cardboard, glass, plastics, metals and hurnid waste.

5.1.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Designate an area for recyclable collection and storage that is appropriately sized and located in a convenient area. Identify local waste handlers and buyers for glass, plastic, metals, office paper, newspaper, cardboard and organic wastes. Instruct occupants on recycling procedures. Consider employing cardboard balers, aluminum can crushers, recycling chutes and other waste management strategies to further enhance the recycling program.

5.2 MR CREDIT 1.1: BUILDING REUSE—

MAINTAIN EXISTING WALLS, FLOORS AND

ROOF - 1–3 POINTS

5.2.1 INTENT:

To extend the lifecycle of existing building stock, conserve resources, retain cultural resources, reduce waste and reduce environmental impacts of new buildings as they relate to materials manufacturing and transport.

5.2.2 REQUIREMENTS:

Maintain the existing building structure

(including structural floor and roof decking) and envelope (the exterior skin and framing, excluding window assemblies and non-structural roofing material). The minimum percentage building reuse for each point threshold is as follows:

BUILDING REUSE POINTS

55% 1

75% 2

95% 3

Hazardous materials that are remediated as a part of the project must be excluded from the calculation of the percentage maintained. If the project includes an addition that is more than 2 times the square footage of the existing building, this credit is not applicable.

5.2.3 POTENTIAL TECHNOLOGIES &

STRATEGIES:

Consider reusing existing, previously-occupied building structures, envelopes and elements. Remove elements that pose a contamination risk to building occupants and upgrade components that would improve energy and water efficiency such as windows, mechanical systems and plumbing fixtures.

5.3MR CREDIT 1.2: BUILDING REUSE—

MAINTAIN INTERIOR NONSTRUCTURAL

ELEMENTS - 1 POINT

5.3.1 INTENT:

To extend the lifecycle of existing building stock, conserve resources, retain cultural resources, reduce waste and reduce environmental impacts of new buildings as they relate to materials manufacturing and transport.

5.3.2 REQUIREMENTS:

Use existing interior nonstructural elements

(e.g., interior walls, doors, floor coverings and ceiling systems) in at least 50% (by area) of the completed building, including additions.

If the project includes an addition with square footage more than 2 times the square footage of the existing building, this credit is not applicable.

5.3.3 POTENTIAL TECHNOLOGIES &

Consider reusing existing building structures, envelopes and interior nonstructural elements. Remove elements that pose a contamination risk to building occupants, and upgrade components that would improve energy and water efficiency such as mechanical systems and plumbing fixtures.

Quantify the extent of building reuse.

5.4 MR CREDIT 2: CONSTRUCTION WASTE

MANAGEMENT - 1–2 POINTS

5.4.1 INTENT:

To divert construction and demolition debris from disposal in landfills and incineration facilities. Redirect recyclable recovered resources back to the manufacturing process and reusable materials to appropriate sites.

5.4.2 REQUIREMENTS:

Recycle and/or salvage nonhazardous construction and demolition debris. Develop and implement a construction waste management plan that, at a minimum, identifies the materials to be diverted from disposal and whether the materials will be sorted on-site or comingled. Excavated soil and land-clearing debris do not contribute to this credit. Calculations can be done by weight or volume, but must be consistent throughout. The minimum percentage debris to be recycled or salvaged for each point threshold is as follows:

RECYCLED OR

SALVAGED

POINTS

50% 1

75% 2

5.4.3 Potential Technologies & Strategies:

Establish goals for diversion from disposal in landfills and incineration facilities and adopt a construction waste management plan to achieve these goals. Consider recycling cardboard, metal, brick, mineral fiber panel, concrete, plastic, clean wood, glass, gypsum wallboard, carpet and insulation.

Construction debris processed into a recycled content commodity that has an open market value (e.g., wood derived fuel [WDF], alternative daily cover material, etc.) may be applied to the construction waste calculation.

Designate a specific area(s) on the construction site for segregated or comingled collection of recyclable materials, and track recycling efforts throughout the construction process. Identify construction haulers and recyclers to handle the designated materials.

Note that diversion may include donation of materials to charitable organizations and salvage of materials on-site.

5.5 MR CREDIT 3: MATERIALS REUSE - 1–2

POINTS

5.5.1 INTENT:

To reuse building materials and products to reduce demand for virgin materials and reduce waste, thereby lessening impacts associated with the extraction and processing of virgin resources.

5.5.2 REQUIREMENTS:

Use salvaged, refurbished or reused materials, the sum of which constitutes at least 5% or

10%, based on cost, of the total value of materials on the project. The minimum percentage materials reused for each point threshold is as follows:

REUSED

MATERIALS

POINTS

5% 1

10% 2

Mechanical, electrical and plumbing components and specialty items such as elevators and equipment cannot be included in this calculation. Include only materials permanently installed in the project.

Furniture may be included if it is included consistently in MR Credit 3: Materials Reuse through MR Credit 7: Certified Wood.

5.5.3 POTENTIAL TECHNOLOGIES &

Identify opportunities to incorporate salvaged materials into the building design, and research potential material suppliers.

Consider salvaged materials such as beams and posts, flooring, paneling, doors and frames, cabinetry and furniture, brick, and decorative items.

5.6 MR CREDIT 4: RECYCLED CONTENT - 1–2

POINTS

5.6.1 INTENT:

To increase demand for building products that incorporate recycled content materials, thereby reducing…