FA5682-16-R-0020-00001.pdf

PDF 30 KB Posted

Attached to
ASHE 16-1045 PAINT INSIDE OF PAS DOOR WALLS, TOWER LOOP, AREA F, AVIANO AB
Solicitation number
FA5682-16-R-0020
Issued by

About this file

AMENDMENT 1 TO FA5682-16-R-0020

View the file

Other files

File Type Posted
Copy_of_ASHE16-1045_REV_1_Blank_cost_est.xls XLS spreadsheet
Attach___1_REV__1_photos_ASHE16-1045.pdf PDF
ASHE_16-1045_REV__1Tech_Specif.pdf PDF
ASHE_16-1045_CNS_cost_est_blank.xls XLS spreadsheet
FA5682-16-R-0020.pdf PDF
ADDITIONAL_REQUIREMENTS.pdf PDF
ASHE_16-1045_Tech_SpecifR.pdf PDF
ASHE_16-1045_Attach___1_photos.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F1F3A26174A001 ASHE 16 1045

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to replace the project Technical Specifications and Cost Estimate Breakdown with Technical Specifications R and Cost Estimate Breakdown REV 1 as indicated in the Summary of Changes in the following pages.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Jul-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA5682-16-R-0020

X 9B. DATED (SEE ITEM 11)

01-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Jul-2016

CODE

31 CONS LGC - FA5682

VIA PORDENONE 89/B, AREA "E" EDIF. 600

BASE AEREA DI AVIANO

AVIANO (PN) 33081

FA5682 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA5682-16-R-0020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from THE CONTRACTOR SHALL FURNISH ALL

LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION, SUPERVISION AND ANY OTHER

NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN LISTED AT THE PRICE STATED BELOW

AND STRICTLY IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS CONTRACT

INCLUDING THE FOLLOWING ATTACHED DOCUMENTS:A. TECHNICAL SPECIFICATIONS FOR ASHE

16-1045, PAINT INSIDE OF PAS DOOR WALLS, TOWER LOOP AREA F, AVIANO AB, ITALY - DATED

JUNE 2016 - 7 PAGES INCLUDING COVER PAGE AND ATTACHMENT 1.B. ADDITIONAL

REQUIREMENTS, DATED 1 JULY 2016 - 3 WRITTEN PAGES to THE CONTRACTOR SHALL FURNISH

ALL LABOR, EQUIPMENT, MATERIALS, TRANSPORTATION, SUPERVISION AND ANY OTHER

NECESSARY WORK TO ACCOMPLISH THE PROJECT HEREIN LISTED AT THE PRICE STATED BELOW

AND STRICTLY IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF THIS CONTRACT

INCLUDING THE FOLLOWING ATTACHED DOCUMENTS:A. TECHNICAL SPECIFICATIONS R FOR

ASHE 16-1045, PAINT INSIDE OF PAS DOOR WALLS, TOWER LOOP AREA F, AVIANO AB, ITALY - DATED JULY 2016 - 7 PAGES INCLUDING COVER PAGE AND ATTACHMENT 1 REV 1.B. ADDITIONAL

REQUIREMENTS, DATED 1 JULY 2016 - 3 WRITTEN PAGES.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS – CONSTRUCTION CONTRACTS

The following documents are attachments to this document and are an integral part hereof:

a. Attachment 1:

Technical Specifications R for ASHE 16-1045 Paint Inside of PAS Door Walls, Tower Loop Area F, Aviano AB, Italy - dated July 2016

- 7 written pages including cover page and Attachment 1 REV 1.

b. Attachment 2:

Additional Requirements, dated 1 July 2016

- 3 written pages

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

L-01. OFFER PREPARATION INSTRUCTIONS

FA5682-16-R-0020

To assure timely and equitable evaluation of offers, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements.

The following documents shall be submitted and shall constitute the offer:

1. PRICE OFFER

(a) Complete blocks 14, 15, 16, 19 (only if amendments are issued) and 20A through 20C of the Section A, SF1442.

In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation Sections A through K. These sections constitute the model contract.

(b) Insert proposed unit and extended prices in Section B for each Contract Line Item Number (CLIN) using the amount resulting from the completion of the Construction Cost Estimate Breakdown REV 1 form. The extended amount must equal the whole Euro unit price multiplied by the number of units.

(c) Complete the necessary fill-ins and certifications in Sections I through K, including Section J Attachment 2 “Additional Requirements”.

(d) The entire solicitation Sections A through M as well as the form Construction Cost Estimate Breakdown REV 1 shall be returned in their entirety.

2. TECHNICAL ACCEPTABILITY.

Submit current SOA certification for category OS07 and classification adequate to cover offeror’s proposed amount for project performance.

3. TECHNICAL DATA.

Submit a copy of the technical data/characteristics of the primer and synthetic enamel paint indicated in paragraph 4.c of the Technical Specifications.

The Technical data must be in sufficient detail to allow the Government evaluation team to ascertain total compliance with the requirements set forth in the Project Technical Specifications.

(End of Summary of Changes) http://www.gsa.gov/Portal/gsa/ep/formslibrary.do?viewType=DETAIL&formId=4E179AB32AF6652285256A260054D101

File details come from the government source that posted it. Updated .