CONSTRUCTION COST ESTIMATE BREAKDOWN REV 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach___1_REV__1_photos_ASHE16-1045.pdf | ||
| ASHE_16-1045_REV__1Tech_Specif.pdf | ||
| FA5682-16-R-0020-00001.pdf | ||
| ASHE_16-1045_CNS_cost_est_blank.xls | XLS spreadsheet | |
| FA5682-16-R-0020.pdf | ||
| ADDITIONAL_REQUIREMENTS.pdf | ||
| ASHE_16-1045_Tech_SpecifR.pdf | ||
| ASHE_16-1045_Attach___1_photos.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASHE16-1045
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||||
| PAINT INSIDE OF PAS DOOR WALLS, REV. 1 AREA F, AVIANO AIR BASE, ITALY | ||||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||||
| ASHE 16-1045 | MULTI FACILITIES, TOWER LOOP AREA | |||||||||||
| MATERIAL and LABOR COSTS | LABOR COSTS | |||||||||||
| LINE ITEM NO. | ITEM (1) | UNIT OF MEASURE (2) | QUANTITY (3) | UNIT (4) | TOTAL (5) | MANHOUR MANDAYS (6) | AVERAGE RATE (7) | TOTAL (8) | OTHER DIRECT COSTS (9) | LINE TOTAL (10) | ||
| 1 | SURFACE CLEANING | |||||||||||
| SANDING, PREPARATION SURFACES TO BE PAINTED | IT. No. | 4.a | Sq. Mt. | 1,900 | ||||||||
| 2 | ALLOWANCE FOR HEIGHT | |||||||||||
| SCAFFOLD / OR / AERIAL PLATFORM | IT. No. | 4.b | L.S. | 1 | ||||||||
| 3 | PAINT METAL SURFACES | |||||||||||
| PRIMER AND TWO COATS ENAMEL PAINT | IT. No. | 4.c | Sq. Mt. | 1,900 | ||||||||
| 6 | ANALYSIS TO DETERMINE PRESENCE OF ASBESTOS | |||||||||||
| RANDOM ANALYSIS ON DOOR GASKETS | IT. No. | 4.f | Each | 4 | ||||||||
| TOTAL |