F1F3B16181A001-Questions_and_Answers.docx

DOCX document 16 KB Posted

Attached to
Furniture Design Solution Aviano AB Bldg. 430, 407, 410
Solicitation number
FA5682-16-Q-5029
Issued by

About this file

Responses to questions asked by vendors

View the file

Other files

File Type Posted
Bldg_407_1_Inch.dwg DWG drawing
Bldg_407_2_Inch.dwg DWG drawing
Bldg_430_2.dwg DWG drawing
Bldg_407_2_Meter.dwg DWG drawing
Bldg_430_1.dwg DWG drawing
Bldg_407_1_Meter.dwg DWG drawing
F1F3B16181A001-Questions_and_Answers__2.docx DOCX document
Bldg_407_1_Meter.dwg DWG drawing
Bldg_407_2_Inch.dwg DWG drawing
Bldg_407_2_Meter.dwg DWG drawing
Bldg_430_1.dwg DWG drawing
Bldg_430_2.dwg DWG drawing
Bldg_407_1_Inch.dwg DWG drawing
F1F3B16181A001-Solicitation_Move_Project-2_August_2016.doc DOC document
F1F3B16181A001-Attachment__3_Building_Plans.pdf PDF
F1F3B16181A001-Attachment__1_Move_project_PWS_2Aug16.doc DOC document
F1F3B16181A001-Attachment__2_Technical_Specifications.docx DOCX document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

31st Contracting Flight (USAFE) Bldg. 600 Aviano AB, Italy

Question and Anwers

SOLICITATION #FA5682-16-Q-5029

Furniture design floor plan solution, move, and installation service for building 430, building 407 and building 410

Purchase Request No: F1F3B16181A001 Quotes are due by: 12 September 2016 @ 1600 am central European time

1. Will there be the necessity to measure for electric?

A: No, the current plan involves a seperate electric install which will take place after furniture installation.

2. Will there be .dvg available?

A: Yes, all files have been posted on FBO for vendors.

3. Wll the current desks be reutilized?

A: To the extent designated by the technical specifications

4. Will the furniture need to match?

A: The furniture will not need to match but will be required to be Earth tones and have the professional look of an office space

5. Can we minimize the current workstattions?

A: Yes, the workstations must meet the specifications provided in the PWS

6. Do they have to maitain the current configuration?

A: No, the contractor may move furniture to realize their proposed design plan

7. Do the workstattions need cabinets?

A: No, the contractor must provide storage per workstattion as identified by the PWS

8. Do we have to work around the current lighting

A: No, there will be a seperate plan for the electric installation which will allow for relocation of the lighting

9. Can we use the entire space?

Yes, as long as there is no blockage of doors, windows, or stairs

10. Do cable options have to provide for concealment of cables?

A: No

11. Could you provide clarification for the removal of furniture items that are not being used?

A: The removed furniture will be placed under Bldg. 407

12. Is electrical required?

A: No

13. Is color a concern?

A: The furniture will be required to be Earth tones and have the professional look of an office space

14. What company manufactured the furniture that is present?

A: Estel

Bldg 407 (1st Floor)

15. How many desks need to be present in Rm. 101?

A: 5 Workstations

16. Do the workstations have to be seperated?

A: No

Miscellaneous

17. We understood that we have to offer visitor chairs for building 407. Can you just define how many for each room please?

A: Room 102 (CEIAI) 3 visitor chairs

18. We have read that we have to offer “stand alone cabinets” for building A: The 2 cabinets that were specifically requested are ~290CMx230CMx50CM

19. Do you want workstation “cubicles” with walls and dividers and overhead cabinets? Or, do you just want “L” shaped desks with some kind of privacy screens and overhead cabinets?

A: The requirement for Bldg. 430 is to have cubicles with walls and dividers and must be able to be put into place with the current in place furniture. The current furniture is manufactured by Estel, if this information would be helpful. It is grey in color and constructed of metal. There is no requirement to match the furniture but a good guide would be to maintain earth tones for the color. The design for 407 does not require cubicles but does require the number of desks in the solicitation.

20. Do you want us to quote the furniture now as part of the quote?

A: The furniture will be part of the quote that is presented.

21. You want a quote for 1) design services per building; 2) furniture supply, delivery, and installation per building; 3) removal and “DRMO” of old furniture not re-used; 4) include in #1, is redesigning use of existing furniture you want to keep which will then be reconfigured when installation new furniture. Yes?

A: All of the description information is correct with the exception of removal and "DRMO". The furniture will be removed from the building and placed beneath Bldg. 407 for disposition. We would prefer to keep the furniture in tact but it is not a requirement of this purchase.

22. Can we provide furniture other than that made by Estel?

A: There is no restriction on the type of furniture that you provide. We are leaving the decisions for furniture type to the vendors.

File details come from the government source that posted it. Updated .