Atch 2 PWS.xlsx

XLSX spreadsheet 93 KB Posted

Attached to
Emergency Spill Cleanup
Solicitation number
FA561321Q0031
Issued by

View the file

Other files

File Type Posted
Atch 4 Applicable Provisions and Clauses.pdf PDF
BPA RFQ FA561322QSpillCleanup.pdf PDF
Atch 1 Price List.pdf PDF
Atch 3 BPA Terms and Conditions.pdf PDF
Atch 4 Applicable Provisions and Clauses.pdf PDF
Atch 3 BPA Terms and Conditions.pdf PDF
Atch 4 Applicable Provisions and Clauses.pdf PDF
BPA COMBO FA561321Q0031.doc DOC document
Atch 5 MAPS.pdf PDF
Atch 2 PWS Emergency Spill.pdf PDF
Atch 1 Price List.xls XLS spreadsheet
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year Blaket Purchase Agreement (BPA) Price List pricing will be valid for a 12-month ordering period and will be updated annually on the anniversary of the BPA establishment.

Line ItemDESCRIPTIONU/MQTYPRICEAMOUNT
1.0POL Fuel Spill (including but not limited to) hydraulic oil, diesel, fuel, JP8, etc
1.1On paved surface (including labor, and material)SQM1000
1.2On unpaved surface (including labor and material)TON500
1.3On/near water area (including labor and material)TON50
1.4On flowing water (including labor and material)KG300
1.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON50
1.6Disposal of liquids (AVV160708, AVV050105, AVV130701, AVV130702) including ZKS feesLTR1000
1.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AAV EWC 150202) including ZKS feesKG200
1.8Sampling and AnalysisEA30
1.9Freimessung (Final Analysis and Clean-up Report)EA5
2.0Acid Spill
2.1On paved surface (including labor, and material)SQM200
2.2On unpaved surface (including labor and material)TON100
2.3On/near water area (including labor and material)TON50
2.4On flowing water (including labor and material)CBM10
2.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON50
2.6Disposal of liquids (AVV/EWC 160709) including ZKS feesLTR500
2.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AVV/EWC 150202) including ZKS feesKG100
2.8Sampling and AnalysisEA5
2.9Freimessung (Final Analysis and Clean-up Report)EA1
3.0De-Icing Fluid Spill
3.1On paved surface (including labor, and material)SQM1000
3.2On unpaved surface (including labor and material)TON30
3.3On/near water area (including labor and material)TON50
3.4On flowing water (including labor and material)CBM500
3.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON50
3.6Disposal of liquids (AVV/EWC 160114) including ZKS feesLTR500
3.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AVV/EWC 150202) including ZKS feesKG200
3.8Sampling and AnalysisEA30
3.9Freimessung (Final Analysis and Clean-up Report)EA5
4.0Solvent Spill
4.1On paved surface (including labor, and material)SQM200
4.2On unpaved surface (including labor and material)TON100
4.3On/near water area (including labor and material)TON50
4.4On flowing water (including labor and material)CBM500
4.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON20
4.6Disposal of liquids (AVV140602*, AVV140603*) including ZKS feesLTR20
4.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AVV/EWC 150202) including ZKS feesKG200
4.8Sampling and AnalysisEA5
4.9Freimessung (Final Analysis and Clean-up Report)EA1
5.0Backfill with uncontamnated soil
5.1Material from Facility (just transportation costs)TON100
5.2Material for contractor (includes material and transport costsTON100
6.0General Cost
6.1Deployment fee (per deployment)EA10
6.2GeologistHRS100

TOTAL 0.00 €

CONTINUATION OF SF1449

BLOCK 20, BID SCHEDULE 18-MONTH

BASE PERIOD

Option Year 1 Blaket Purchase Agreement (BPA) Price List pricing will be valid for a 12-month ordering period and will be updated annually on the anniversary of the BPA establishment.

Line ItemDESCRIPTIONU/MQTYPRICEAMOUNT
1.0POL Fuel Spill (including but not limited to) hydraulic oil, diesel, fuel, JP8, etc
1.1On paved surface (including labor, and material)SQM1000
1.2On unpaved surface (including labor and material)TON500
1.3On/near water area (including labor and material)TON50
1.4On flowing water (including labor and material)KG300
1.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON50
1.6Disposal of liquids (AVV160708, AVV050105, AVV130701, AVV130702) including ZKS feesLTR1000
1.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AAV EWC 150202) including ZKS feesKG200
1.8Sampling and AnalysisEA30
1.9Freimessung (Final Analysis and Clean-up Report)EA5
2.0Acid Spill
2.1On paved surface (including labor, and material)SQM200
2.2On unpaved surface (including labor and material)TON100
2.3On/near water area (including labor and material)TON50
2.4On flowing water (including labor and material)CBM10
2.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON50
2.6Disposal of liquids (AVV/EWC 160709) including ZKS feesLTR500
2.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AVV/EWC 150202) including ZKS feesKG100
2.8Sampling and AnalysisEA5
2.9Freimessung (Final Analysis and Clean-up Report)EA1
3.0De-Icing Fluid Spill
3.1On paved surface (including labor, and material)SQM1000
3.2On unpaved surface (including labor and material)TON30
3.3On/near water area (including labor and material)TON50
3.4On flowing water (including labor and material)CBM500
3.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON50
3.6Disposal of liquids (AVV/EWC 160114) including ZKS feesLTR500
3.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AVV/EWC 150202) including ZKS feesKG200
3.8Sampling and AnalysisEA30
3.9Freimessung (Final Analysis and Clean-up Report)EA5
4.0Solvent Spill
4.1On paved surface (including labor, and material)SQM200
4.2On unpaved surface (including labor and material)TON100
4.3On/near water area (including labor and material)TON50
4.4On flowing water (including labor and material)CBM500
4.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON20
4.6Disposal of liquids (AVV140602*, AVV140603*) including ZKS feesLTR20
4.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AVV/EWC 150202) including ZKS feesKG200
4.8Sampling and AnalysisEA5
4.9Freimessung (Final Analysis and Clean-up Report)EA1
5.0Backfill with uncontamnated soil
5.1Material from Facility (just transportation costs)TON100
5.2Material for contractor (includes material and transport costsTON100
6.0General Cost
6.1Deployment fee (per deployment)EA10
6.2GeologistHRS100

TOTAL 0.00 €

BLOCK 20, BID SCHEDULE 18-MONTH

BASE PERIOD

Option Year 2 Blaket Purchase Agreement (BPA) Price List pricing will be valid for a 12-month ordering period and will be updated annually on the anniversary of the BPA establishment.

Line ItemDESCRIPTIONU/MQTYPRICEAMOUNT
1.0POL Fuel Spill (including but not limited to) hydraulic oil, diesel, fuel, JP8, etc
1.1On paved surface (including labor, and material)SQM1000
1.2On unpaved surface (including labor and material)TON500
1.3On/near water area (including labor and material)TON50
1.4On flowing water (including labor and material)KG300
1.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON50
1.6Disposal of liquids (AVV160708, AVV050105, AVV130701, AVV130702) including ZKS feesLTR1000
1.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AAV EWC 150202) including ZKS feesKG200
1.8Sampling and AnalysisEA30
1.9Freimessung (Final Analysis and Clean-up Report)EA5
2.0Acid Spill
2.1On paved surface (including labor, and material)SQM200
2.2On unpaved surface (including labor and material)TON100
2.3On/near water area (including labor and material)TON50
2.4On flowing water (including labor and material)CBM10
2.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON50
2.6Disposal of liquids (AVV/EWC 160709) including ZKS feesLTR500
2.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AVV/EWC 150202) including ZKS feesKG100
2.8Sampling and AnalysisEA5
2.9Freimessung (Final Analysis and Clean-up Report)EA1
3.0De-Icing Fluid Spill
3.1On paved surface (including labor, and material)SQM1000
3.2On unpaved surface (including labor and material)TON30
3.3On/near water area (including labor and material)TON50
3.4On flowing water (including labor and material)CBM500
3.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON50
3.6Disposal of liquids (AVV/EWC 160114) including ZKS feesLTR500
3.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AVV/EWC 150202) including ZKS feesKG200
3.8Sampling and AnalysisEA30
3.9Freimessung (Final Analysis and Clean-up Report)EA5
4.0Solvent Spill
4.1On paved surface (including labor, and material)SQM200
4.2On unpaved surface (including labor and material)TON100
4.3On/near water area (including labor and material)TON50
4.4On flowing water (including labor and material)CBM500
4.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON20
4.6Disposal of liquids (AVV140602*, AVV140603*) including ZKS feesLTR20
4.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AVV/EWC 150202) including ZKS feesKG200
4.8Sampling and AnalysisEA5
4.9Freimessung (Final Analysis and Clean-up Report)EA1
5.0Backfill with uncontamnated soil
5.1Material from Facility (just transportation costs)TON100
5.2Material for contractor (includes material and transport costsTON100
6.0General Cost
6.1Deployment fee (per deployment)EA10
6.2GeologistHRS100

TOTAL 0.00 €

BLOCK 20, BID SCHEDULE 18-MONTH

BASE PERIOD

Option Year 3 Blaket Purchase Agreement (BPA) Price List pricing will be valid for a 12-month ordering period and will be updated annually on the anniversary of the BPA establishment.

Line ItemDESCRIPTIONU/MQTYPRICEAMOUNT
1.0POL Fuel Spill (including but not limited to) hydraulic oil, diesel, fuel, JP8, etc
1.1On paved surface (including labor, and material)SQM1000
1.2On unpaved surface (including labor and material)TON500
1.3On/near water area (including labor and material)TON50
1.4On flowing water (including labor and material)KG300
1.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON50
1.6Disposal of liquids (AVV160708, AVV050105, AVV130701, AVV130702) including ZKS feesLTR1000
1.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AAV EWC 150202) including ZKS feesKG200
1.8Sampling and AnalysisEA30
1.9Freimessung (Final Analysis and Clean-up Report)EA5
2.0Acid Spill
2.1On paved surface (including labor, and material)SQM200
2.2On unpaved surface (including labor and material)TON100
2.3On/near water area (including labor and material)TON50
2.4On flowing water (including labor and material)CBM10
2.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON50
2.6Disposal of liquids (AVV/EWC 160709) including ZKS feesLTR500
2.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AVV/EWC 150202) including ZKS feesKG100
2.8Sampling and AnalysisEA5
2.9Freimessung (Final Analysis and Clean-up Report)EA1
3.0De-Icing Fluid Spill
3.1On paved surface (including labor, and material)SQM1000
3.2On unpaved surface (including labor and material)TON30
3.3On/near water area (including labor and material)TON50
3.4On flowing water (including labor and material)CBM500
3.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON50
3.6Disposal of liquids (AVV/EWC 160114) including ZKS feesLTR500
3.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AVV/EWC 150202) including ZKS feesKG200
3.8Sampling and AnalysisEA30
3.9Freimessung (Final Analysis and Clean-up Report)EA5
4.0Solvent Spill
4.1On paved surface (including labor, and material)SQM200
4.2On unpaved surface (including labor and material)TON100
4.3On/near water area (including labor and material)TON50
4.4On flowing water (including labor and material)CBM500
4.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON20
4.6Disposal of liquids (AVV140602*, AVV140603*) including ZKS feesLTR20
4.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AVV/EWC 150202) including ZKS feesKG200
4.8Sampling and AnalysisEA5
4.9Freimessung (Final Analysis and Clean-up Report)EA1
5.0Backfill with uncontamnated soil
5.1Material from Facility (just transportation costs)TON100
5.2Material for contractor (includes material and transport costsTON100
6.0General Cost
6.1Deployment fee (per deployment)EA10
6.2GeologistHRS100

TOTAL 0.00 €

BLOCK 20, BID SCHEDULE 18-MONTH

BASE PERIOD

Option Year 4 Blaket Purchase Agreement (BPA) Price List pricing will be valid for a 12-month ordering period and will be updated annually on the anniversary of the BPA establishment.

Line ItemDESCRIPTIONU/MQTYPRICEAMOUNT
1.0POL Fuel Spill (including but not limited to) hydraulic oil, diesel, fuel, JP8, etc
1.1On paved surface (including labor, and material)SQM1000
1.2On unpaved surface (including labor and material)TON500
1.3On/near water area (including labor and material)TON50
1.4On flowing water (including labor and material)KG300
1.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON50
1.6Disposal of liquids (AVV160708, AVV050105, AVV130701, AVV130702) including ZKS feesLTR1000
1.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AAV EWC 150202) including ZKS feesKG200
1.8Sampling and AnalysisEA30
1.9Freimessung (Final Analysis and Clean-up Report)EA5
2.0Acid Spill
2.1On paved surface (including labor, and material)SQM200
2.2On unpaved surface (including labor and material)TON100
2.3On/near water area (including labor and material)TON50
2.4On flowing water (including labor and material)CBM10
2.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON50
2.6Disposal of liquids (AVV/EWC 160709) including ZKS feesLTR500
2.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AVV/EWC 150202) including ZKS feesKG100
2.8Sampling and AnalysisEA5
2.9Freimessung (Final Analysis and Clean-up Report)EA1
3.0De-Icing Fluid Spill
3.1On paved surface (including labor, and material)SQM1000
3.2On unpaved surface (including labor and material)TON30
3.3On/near water area (including labor and material)TON50
3.4On flowing water (including labor and material)CBM500
3.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON50
3.6Disposal of liquids (AVV/EWC 160114) including ZKS feesLTR500
3.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AVV/EWC 150202) including ZKS feesKG200
3.8Sampling and AnalysisEA30
3.9Freimessung (Final Analysis and Clean-up Report)EA5
4.0Solvent Spill
4.1On paved surface (including labor, and material)SQM200
4.2On unpaved surface (including labor and material)TON100
4.3On/near water area (including labor and material)TON50
4.4On flowing water (including labor and material)CBM500
4.5Disposal of contaminated soil (AVV/EWC 170503) including ZKS feesTON20
4.6Disposal of liquids (AVV140602*, AVV140603*) including ZKS feesLTR20
4.7Disposal of absorbents, wiping clothes, protective clothing contaminated by dangerous substances (AVV/EWC 150202) including ZKS feesKG200
4.8Sampling and AnalysisEA5
4.9Freimessung (Final Analysis and Clean-up Report)EA1
5.0Backfill with uncontamnated soil
5.1Material from Facility (just transportation costs)TON100
5.2Material for contractor (includes material and transport costsTON100
6.0General Cost
6.1Deployment fee (per deployment)EA10
6.2GeologistHRS100

TOTAL 0.00 €

BLOCK 20, BID SCHEDULE 18-MONTH

BASE PERIOD

File details come from the government source that posted it. Updated .