This is a Questions and Answers document for a federal contract opportunity for a truck-mounted de-icing tank sprayer system at RAF Lakenheath. The primary Kenworth trucks (T880 and T370 models, 2018-2023) will receive a single baffled tank system with minimum 4,000-liter capacity (maximum capacity limited by 14 short ton weight constraint when filled). The tank must be constructed of high-density polyethylene (HDPE), cross-linked polyethylene (XLPE), or stainless steel, with top gravity fill capability and transfer pump connection for both filling and draining. The spray system must deliver a minimum 10-meter liquid spray width with even distribution using a spray system (not a spray bar), with the spray hardware capable of extending from the rear since tailgates will be removed during operation. The unit must not exceed 11 feet in total height and fit within the truck bed interior dimensions of 14 feet length and 7 feet width (narrowing to 6 feet 4 inches at the base due to bed support design).
The deicing fluid is Konsin Eco De-Ice and Anti-Ice Fluid (potassium acetate-based, specific gravity 1.29, pH 10.4–10.8, viscosity 25–30 mPa·s, minimum temperature −37°C) with application rates of 0.25 to 1.5 gallons per 1,000 square feet at operating speeds of 20–30 mph, requiring computerized chemical-metering systems for dynamic rate management. The unit must include a complete LED lighting package with 360-degree amber warning beacons, work lights, and illuminated controls. The manufacturer shall perform initial installation and on-site training, provide a 12–24 month warranty, and furnish technical documentation; follow-on service (up to two summer rebuild visits plus annual maintenance) is preferred but not required. Delivery must occur within 90 calendar days of award to RAF Lakenheath, Building 1119, via Gate 8 (IP27 9BU), with the awardee responsible for customs clearance through the Mildenhall Customs Office. Quotations must remain valid for a minimum of 60 calendar days from the submission deadline of 24 September 2026 at 16:30 BST; the question deadline was 18 September 2026 at 16:30 BST with no extension offered.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
48 CES - Truck Mounted De-Icing Tank Sprayer
Questions & Answers
Questions:
1. Please confirm whether the required tank capacity is 4,000 L or 10,000 L. Do both entries refer to the same main tank, or are the multiple tanks required? Please state the required usable capacity and any minimum headspace allowance.
a. We request that the company physically inspect the vehicle to confirm compatibility. We request a single-tank deicing system with a minimum capacity of 4,000 liters (approximately 1,056 gallons), with the largest capacity possible within applicable vehicle weight limitations. To support current and future mission requirements, the tank must be capable of being filled by both top gravity loading and transfer pump. Total deicing machine weight must not exceed 14 short tons (28,000 pounds). Based on Konsin Eco deicer, the estimated weight per 1,000 liters is approximately 2,844 pounds.
Total vehicle height, with the tank installed, must not exceed 11 feet. The cargo bed floor begins at a height of 4 feet.
2. Please confirm whether the minimum spray coverage is 40 ft (12.192 m) or 10 m, and whether this means total treated swath or throw distance from each side.
Please reconcile the 8 ft maximum machine width with the 12 ft spray-system limit and identify the allowable transport and operating widths and spray-hardware arrangement.
a. We request that the company physically inspect the vehicle to confirm compatibility. The unit must provide a minimum liquid spray width of 10 meters and distribute deicing fluid evenly across that width. The deicing liquid must be applied through a spray system and not by means of a long spray bar. The spray bar or spray unit must not exceed the width of the truck, which is 2.5 meters (approximately 8 feet). The spray hardware may extend from the rear of the truck, as the tailgate will be removed during operation.
The truck bed interior dimensions are 14 feet in length and 7 feet in width at the side walls; however, due to the bed support design, the bottom 6 inches narrows to 6 feet 4 inches in width.
3. Please identify the deicing chemical(s), concentration, specific gravity, minimum ambient/fluid temperature, required application-rate range, and operating-speed range. What coverage uniformity and wind/test conditions govern acceptance? Are in-cab controls, section shutoff, or automatic ground-speed compensation required?
a. We request that the company physically inspect the vehicle to confirm compatibility. Konsin Eco De-Ice and Anti-Ice Fluid, manufactured by CHELA Intelligent Cleaning Company, uses potassium acetate as its active ingredient. The fluid has a specific gravity of 1.29, equivalent to approximately 10.76 lb/gal, a pH range of 10.4–10.8, conductivity of 91 mS, and viscosity of 25–30 mPa·s; the test temperature and measurement basis for conductivity and viscosity should be confirmed. The minimum fluid temperature is −37 °C, and the compatible applicator operating-speed range is 20–30 mph. Application rates range from 0.25 to 1.5 gallons per 1,000 square feet and must be dynamically managed through computerized chemical-metering systems to maintain the required application rate as vehicle speed changes.
4. Please provide the receiving truck make/model, usable internal bed dimensions, tailgate/access restrictions, payload and axle limits, and approved attachment points, with drawings or photos if available. Is the 10 ft height measured from the skid base or from ground level when installed? Does the 15-ton limit mean U.S.
short tons, metric tonnes, or U.K. long tons, and does it include the complete filled sprayer, fuel, and accessories?
a. We request that the company physically inspect the vehicle to confirm compatibility. The primary trucks will be Kenworth(T880 & T370 2 example models) with model years ranging from 2018 - 2023 but all trucks have the same 15 short ton weight capacity. The truck bed interior dimensions are 14 feet in length and 7 feet in width at the side walls; however, due to the bed support design, the bottom 6 inches narrows to 6 feet 4 inches in width.with the tank installed, must not exceed 11 feet. The cargo bed floor begins at a height of 4 feet. Total deicing machine weight must not exceed 15 short tons while filled (30,000 pounds). Based on Konsin Eco deicer, the estimated weight per 1,000 liters is approximately 2,844 pounds.Tailgates are removed while deicer is installed and gate latches can be used to help secure unit in truck. total deicher machine weight with everything including fluid cannot exceed 14 short tons
5. Please clarify whether the painted-steel/corrosion-resistant material requirement applies to the chassis, the wetted tank, or both. Are baffled polyethylene and stainless-steel tanks acceptable? Please identify any mandatory tank construction, baffling, fill connection, drainage, or flushing requirements.
a. Painted steel or corrosion resistant material applies for all equipment parts of the chassis. Tanks need to be baffled and should be made of High-density polyethylene (HDPE) or cross-linked polyethylene (XLPE) or Stainless steel.
Tank need to be top filled via gravity and needs capability to connect transfer pump. The tank also need to be able to be drain via gravity or transfer pump.
machine will need to be flushed with clean water before storage.
6. Please define the required "jacking drawbar storage leg kit" for this dump-truck-mounted skid and describe the intended loading/removal method. Must lifting eyes, forklift channels, and storage legs support a filled unit or an empty unit only? Please provide any required fork-pocket dimensions, lifting configuration, and storage-leg height.
a. The machine must be capable of installation and removal by forklift or crane.
It must also be capable of being securely fastened within the dump truck, ideally using eyelets that may also serve as lifting points for a crane. The machine will only be installed, removed, and stored while empty. Forklift access points must accommodate tine openings of 4 inches by 6 inches and a tine length of 10 feet. The unit must include slots for two forklift tines spaced 4 feet apart. Storage legs must elevate the machine sufficiently to prevent ground contact, with a minimum ground clearance of 2 feet."
7. Please identify the required standard or approval for the airport-approved amber beacon, any specific LED work-light requirements, and any engine-emissions or equipment-conformity requirements applicable to delivery and operation at RAF Lakenheath. Please identify any additional fuel or electrical restrictions beyond the stated gasoline-or-diesel engine requirement
a. The airport deicer unit shall be equipped with a complete LED lighting package to support safe vehicle movement, airfield visibility, and deicing operations during daytime, nighttime, and low-visibility conditions. At a minimum, the unit should include amber LED warning beacons mounted at the highest practical points to provide 360-degree visibility, rear-facing amber warning lights, side-mounted marker lights, rear tail lights, hazard warning lights, and clearance lights to identify the outermost edges of the unit. The lighting package should also include rear- and side-facing LED work lights to illuminate the spray system, hose connections, fill points, pump area, control stations, and other operator access points during setup, operation, and maintenance. All controls, gauges, and emergency shutoff locations should be illuminated for safe use in low-light conditions. All LED lighting and associated wiring shall be weather-resistant, securely mounted, and protected against moisture, corrosion, vibration, chemical exposure, and damage during loading, unloading, and routine operations.
8. Please identify who will perform initial installation and commissioning, including any truck modifications or mounting hardware installation. Please confirm whether operation/maintenance manuals and demonstration videos satisfy the training-materials option, and identify any mandatory onsite attendance by contractor personnel.
a. The manufacturer or vendor shall perform the initial installation and provide on-site familiarization and operational training for personnel on proper installation and use of the equipment. The units must be compatible across the dump truck fleet, as they will be exchanged annually among three equipment kits.
9. Please provide the inspection and acceptance procedure, including any field demonstration and required test records. Who supplies the test chemical, truck, and operator? Is any deicing chemical to be furnished with the delivered unit?
Please identify any required warranty period or onsite service obligation beyond the offered standard commercial warranty.
a. The unit shall be delivered with on-site training provided by the manufacturer for the initial installation and operation, to include a complete function check of the equipment. The unit shall include a manufacturer’s warranty of 12 to 24 months. If available, follow-on on-site service support is requested, to include up to two visits for summer rebuild support and one visit every 12 months thereafter, though this follow-up service is preferred and not required. The manufacturer shall also provide all applicable technical documents, manuals, and instructions necessary to properly operate, maintain, troubleshoot, and service the machine. No chemical product is required with delivery
10. Please resolve Building 1119 versus Building 1130 and provide the commercial freight street address/postcode, receiving contact, delivery hours, and base-access instructions. Please confirm the final FOB Destination delivery point and who performs unloading, including the available lifting equipment and capacity.
a. Please deliver to RAF Lakenheath, Gate 8, located off A1065, IP27 9BU. Prior to delivery, the vendor must coordinate a base escort with the designated government points of contact. Once on base, please deliver to Building 1119, RAF Lakenheath, IP27 9PN. The arranged escort will meet the delivery team at gate 8 and escort them to the final delivery location Building 1119.
Equipment will be available on site to unload the material.
11. Please confirm that the 90-calendar-day period after award requires arrival at the final U.K. delivery point, and whether any required commissioning or training must also be completed within that period. Will a quote proposing a longer, substantiated lead time be considered, or is 90 days a mandatory maximum?
a. The company shall provide installation and operational training for personnel and furnish all applicable service manuals required for the proper maintenance of the machine. The 90 day delivery after date of award is preferable, but the government will take into consideration a longer lead time.
12. Please identify the importer of record and the party responsible for customs clearance. What Government-provided documentation and procedures are required to obtain the applicable U.K. VAT and import-duty relief, and when will that documentation be available?
a. The awardee will need to reach out to the Mildenhall Customs Office. The contact information will be provided upon award.
13. The exception table identifies "CLIN 0001 F-35 Maintenance Stand." Please correct or clarify this entry and confirm whether the deicing sprayer is exempt from item unique identification or requires IUID marking and reporting.
a. This is a typo. Can be ignored
14. Attachment 2 states a minimum validity of 30 days, while the solicitation requires prices to remain firm for 60 calendar days from the quote deadline. Please confirm that quotation validity of 60 calendar days from the applicable quote deadline (currently 24 September 2026) satisfies the requirement.
a. Quotes are required to be valid a minimum of 60 days from submission to be considered for award.
15. Please confirm whether the stated 16:30 "GMT/BST" deadlines on 18 September 2026 for questions and 24 September 2026 for quotes mean BST (UTC+1) or GMT (UTC+0). Please advise when responses and corrected attachments are expected and whether the quote deadline will be extended if material requirements are revised.
a. Questions will be due 16:30 BST. An extension will not be made.
16. Could you please confirm whether the de-icer should be installed inside the dump truck body or mounted directly on the truck chassis with the body removed?
a. installed inside the dump bed and secured to dump truck.