Attachment 0003 - PowerPoint Slide.pptx

PPTX presentation 1 MB Posted

Attached to
Corrosion Control Wash Rack Compressed/Breathing Air
Solicitation number
FA558724Q0073
Issued by

About this file

This document is a PowerPoint slide that provides details on the compressed air connection requirements for a federal contract opportunity. The key details are:

The contract requires the installation of 49 reels, including 22 breathing air reels and 27 compressed air reels, hoses, and connections. The reels will be installed in various locations throughout the facility, including the paint booths, wash rack, and back shop areas. The slide outlines the specific mounting brackets, fixing details, and zoning for the different reel locations. It also includes drawings showing the layout and reinforcement details within the paint booth area. This information is provided in support of Solicitation FA558724Q0073 for Corrosion Control Wash Rack Compressed/Breathing Air, issued by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Compressed Air Connections Fixing Details Within B1690 The following sides detail the Compressed Air fixing details for Breathing Air and Compressed Tool Air reels within each area of the building to various substrates.

Compressed Air Reel Mounting Locations Total Compressed Air = 24no Paint Booth + 25no Component Booths, Wash Rack and Back Shop

= Breathing Air = Compressed Tool Air

Zone 1 Zone 2 Zone 3 Zone 4 = Ceiling Mounted Reels in Paint Booth Panels = Wall Mount Reels in Paint Booth Panels = Wall Mount Reels in Solid Blockwork = Ceiling Mounted Reels on metal brackets

Zone 1: Paint Booth Ceiling Compressed Air Reel - Mounting Bracket and Fixing details Compressed Air Reels = 12no in Main Paint Booth– Fixing Details

The reels will be directly connected to the ceilings (no swivel bracket). Minor size difference for breathing air reels bracket size, however, does not change the fixing detail below.

The reels brackets will be connected to the ceiling using the detail below. Compressed air supplier shall provide all items in the red circle and Dalby (paint booth client sub-contractor) stall provide everything in the blue circle.

AV1000 EX- Tool Air Reel (or equally approved)

Compressed Air Reels = 20no in Main Paint Booth and Small Paint Booth 1 & 2– Fixing Details Reels will be fixed to the ST 15 Swivel bracket (or equally approved) which will be attached to the paint booth walls Zone 2: Paint Booth Wall Compressed Air Reel - Mounting Bracket and Fixing details

AV1000 EX- Tool Air Reel (or equally approved)

Fixing detail below- Compressed air supplier shall provide all items in the red circle and Dalby (paint booth client sub-contractor) stall provide everything in the blue circle.

Compressed/breathing Air Reels = 9no in Wash Rack and Cab blaster room– Fixing Details Compressed air installer to design, supply and install suitable fixings into the block work wall in Zone 3 areas of the building. Detail below shows the wall section make-up detail for the Zone 3 areas.

Zone 3: Blockwork Wall Compressed/breathing Air Reels- Mounting Brackets and Fixing Details

Compressed + Breathing Air Reels = 8no in Back Shop – Fixing Details Zone 4: Steel Bracket - Ceiling level Compressed/breathing Air Reel - Mounting Bracket and Fixing details The reels will be directly connected to the ceiling steel (no swivel bracket).

Reels will be connected at high level to a steel beam within the zone 4 backshop area. Contractor to drill holes into steel beam and provide the necessary fixing connections to support the reel.

Reinforcement Detail Drawing within Paint booth area.

Double Click on Drawing to access Two sections at the top of the drawing details the reinforcement panel locations on the walls of the paint booth to support the compressed air reels.

Below light blue detail shows the ceiling reinforcement panels to support the compressed air reels at height within the paint booth area.

Locations Of the Compressed Air within the building.

Double Click on Drawing to access image1.png image2.png image3.png image4.png image5.png image6.png image7.png image8.png image9.jpg oleObject1.bin image10.wmf

TNOX 6000

W1690-0039-B

W

-0

9-

A

W1690-0042-A

Fr id ge

Industrial Freezer

12345678

9 10 11 12 13 14 15 16 17

89101112

21 22 23 24

Water Fountain

Water Fountain

Fi rs t A id

Ki t

Defib

First Aid KitFirst Aid

Kit

WASH RACK

1690-0024 485 m2

BREAK ROOM

1690-0004 31 m

MAIN PAINT BOOTH

1690-0025 622 m2

PLENUM

1690-0025A 43 m2

PLENUM

1690-0025B 62 m2

MALE WC

1690-0020 10 m2

MALE CLN LKR

1690-00199 m2

MALE DTY LKR

1690-0018

17 m2

AIR SHWR

1690-0017 8 m2

FEMALE DTY LKR

1690-0013 14 m2

FEMALE CLN LKR

1690-00127 m2

FEMALE WC

1690-0011 11 m2

COMMS

1690-0005 12 m2

WASH

1690-0010 5 m2

SUPPLY

1690-0007

C

IR

U

LA

TI

O N

5a m

EXT ESCAPE STAIR

1690-0041 24 m2

JAN

1690-0006 4 m2

CIRCULATION

1690-0022

LOBBY

1690-0016 9 m2

ACC WC

1690-0009 4 m2

RESP CLN

1690-0014

OFFICE

1690-0039 8 m 2

CTK

1690-0023 9 m2

ELECT

PLANT

1690-0008 3 m2

ELECT PLANT

1690-0037 25 m2

PAINT BOOTH 1

1690-0033 54 m2

PAINT BOOTH 2

1690-0034 54 m2

STENCIL ROOM

1690-0003 18 m2

PAINT MIX

1690-0026 10 m2

EQUIP CLEAN

1690-0027 12 m2

BACK SHOP

1690-0028 123 m

COMP ROOM

1690-0031 14 m2

OFFICE

1690-0002 21 m2CAB BLASTERS

1690-0032 49 m2

CTK

1690-0029 39 m2

CHEM STORE

1690-0030 13 m2

RISER

1690-0034A 2 m2

FR CONV

1690-0038

STAIR

1690-0021 11 m2

HEAT PLANT SPACE

1690-0036 56 m2

SPRINKLER ROOM

1690-0040 43 m2

RISER

1690-0033A 2 m2

ACCESS AND ESCAPE ZONE

1690-0035 124 m2

WASH RACK PLANT

1690-0043 59 m2

ENTRANCE LOBBY

1690-0001 15 m2

VLFD

MOTOR

1690-0044 3 m2

VLFD

MOTOR

1690-0045 1 m2

IR

LA

TI

O N

5b

1:

0.

9° / 1

.5

FE

1:

0.

9° / 1

.5

1:64 / 0.9°/ 1.5%1:64 / 0.9°/ 1.5%

Eye wash & shower

Ey e w as h sh ow er

MAIN

ENTRANCE

NOTE: DOORS ARE TO OPEN

FULL WIDTH FOR

CLEARANCE

D1690-0025B-D

D1690-0024-D

BOILER PUMP HOUSE

1690-0042 204 m2

Heavy duty table curing oven

H eavy duty table ith w heels.

M etal C age-lockable.

Metal Cage-lockable.

WORK COUNTER

MCC MCD

Paint workbench with extract

Filterbench D ndraft table ork table asher/ solvent recycler

Vinyl Rack

Table with cutting mat

2,440 raw er C hest

750x1400m

Table 1500x950m

3100x950m ry hi ng ni t ith S/S top & rubber w

A2484

MCC

Bench Be nc

MCA

A2496

900mm

MCBMCA

MFD

KEY:

Breathing air drop (Swivel wall mounted bracket)

Compressed air drop (Swivel wall mounted bracket)

At height air drop (Fixed bracket)

AutoCAD SHX Text

PUMP

PIPE HEADER AREA

CONTROL

DRAINAGE CHANNEL

Delivered to B1355 secure area

BA

CA

Sheets and Views

Model image11.emf

File details come from the government source that posted it. Updated .