Attachment 0003 - PowerPoint Slide.pptx
PPTX presentation 3 MB Posted
- Solicitation number
- FA558724Q0073
About this file
This document is a PowerPoint slide that provides detailed information on the compressed air connections and fixing requirements for a federal contract opportunity.
The key details are:
- The contract requires 49 reels, including 22 breathing air and 27 compressed air hose reels, with associated hoses and connections.
- The reels will be installed in various zones throughout the facility, including the paint booths, wash rack, and back shop area. The slide provides specific mounting details and fixing requirements for each zone.
- The contract also includes installation and testing of the air reels, as outlined in the Statement of Work and associated drawings.
- The contract opportunity is being issued by the Department of the Air Force United States Air Forces in Europe - Air Forces Africa, with the Solicitation Number FA558724Q0073.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Compressed Air Connections Fixing Details Within B1690 The following sides detail the Compressed Air fixing details for Breathing Air and Compressed Tool Air reels within each area of the building to various substrates.
Compressed Air Reel Mounting Locations Total Compressed Air = 24no Paint Booth + 25no Component Booths, Wash Rack and Back Shop
= Breathing Air = Compressed Tool Air
Zone 1 Zone 2 Zone 3 Zone 4 = Ceiling Mounted Reels in Paint Booth Panels = Wall Mount Reels in Paint Booth Panels = Wall Mount Reels in Solid Blockwork = Ceiling Mounted Reels on metal brackets
Zone 1: Paint Booth Ceiling Compressed Air Reel - Mounting Bracket and Fixing details Compressed Air Reels = 12no in Main Paint Booth– Fixing Details
The reels will be directly connected to the ceilings (no swivel bracket). Minor size difference for breathing air reels bracket size, however, does not change the fixing detail below.
The reels brackets will be connected to the ceiling using the detail below. Compressed air supplier shall provide all items in the red circle and Dalby (paint booth client sub-contractor) stall provide everything in the blue circle.
AV1000 EX- Tool Air Reel (or equally approved)
Compressed Air Reels = 20no in Main Paint Booth and Small Paint Booth 1 & 2– Fixing Details Reels will be fixed to the ST 15 Swivel bracket (or equally approved) which will be attached to the paint booth walls Zone 2: Paint Booth Wall Compressed Air Reel - Mounting Bracket and Fixing details
AV1000 EX- Tool Air Reel (or equally approved)
Fixing detail below- Compressed air supplier shall provide all items in the red circle and Dalby (paint booth client sub-contractor) stall provide everything in the blue circle.
Compressed/breathing Air Reels = 9no in Wash Rack and Cab blaster room– Fixing Details Compressed air installer to design, supply and install suitable fixings into the block work wall in Zone 3 areas of the building. Detail below shows the wall section make-up detail for the Zone 3 areas.
Zone 3: Blockwork Wall Compressed/breathing Air Reels- Mounting Brackets and Fixing Details
Compressed + Breathing Air Reels = 8no in Back Shop – Fixing Details Zone 4: Steel Bracket - Ceiling level Compressed/breathing Air Reel - Mounting Bracket and Fixing details The reels will be directly connected to the ceiling steel (no swivel bracket).
Reels will be connected at high level to a steel beam within the zone 4 backshop area. Contractor to drill holes into steel beam and provide the necessary fixing connections to support the reel.
Reinforcement Detail Drawing within Paint booth area.
Double Click on Drawing to access Two sections at the top of the drawing details the reinforcement panel locations on the walls of the paint booth to support the compressed air reels.
Below light blue detail shows the ceiling reinforcement panels to support the compressed air reels at height within the paint booth area.
Locations Of the Compressed Air within the building.
Double Click on Drawing to access image1.png image2.png image3.png image4.png image5.png image6.png image7.png image8.png image9.jpg
HARRY DALBY ENGINEERING LTD
Text
CLIENT
TITLE
ORIGINAL ISSUE
1:100
A1
SCALE:
ORIGINAL
CONTRACT NO:
DRAWING NO:
P-LAK01-21
THIS DRAWING IS ISSUED SOLELY ON THE UNDERSTANDING THAT IT
IS COPYRIGHT AND CONFIDENTIAL. IT MAY NOT BE USED OR
REPRODUCED WITHOUT PRIOR WRITTEN CONSENT OF THE COMPANY
FIRST ANGLE PROJECTION
RAF LAKENHEATH
AIRCRAFT BOOTH HOSE REEL STRENGTHENING PLATE POSTION LOCATIONS
DO NOT SCALE
ALL DIM. ARE IN mm
IF IN DOUBT ASK!
A
W.WEBB
29 MAY 24
0.5
<1.2M
5.0
3.0
1.0
CUTTING PUNCHING FORMING/FOLDING DUCTING GENERAL INSTALLATION DUCTING INSTALLATION
GENERAL TOLERANCES
2.0
1.0
<300mm
0.2
10.0
>1.2M
2.0
ISSUE DRN./DATE CHKD CHANGE DETAILS
TEL: O116 291 6000 FAX: 0116 291 6001
GLOUCESTER CRESCENT WIGSTON LEICESTER LE18 4YQ
SB18397
AJR
KVF35 REVISION NO:
X00
X01
X02
X03
X04
X05
X06
X07
REAR OF BOOTH
FLOOR SLOPE
REAR OF BOOTH
FLOOR SLOPE
KVF35 DWG NO:
KVF35-DAL-1690-ZZ-DR-Y-00137
DETAIL A
DETAIL B
DETAIL C
DETAIL D
RIGHT HAND SIDE, VIEWED FROM FRONT OF BOOTH LOOKING TOWARDS THE REAR
LEFT HAND SIDE, VIEWED FROM FRONT OF BOOTH LOOKING TOWARDS THE REAR
DETAIL E
DETAIL F
Y02
Y03
Y04
Y05
Y06
DETAIL G
Y04
DETAIL H
DETAIL J
DETAIL A
DETAIL B
DETAIL C
DETAIL D
DETAIL E
DETAIL F
DETAIL G
DETAIL H
DETAIL J
NOTE: 3MM GALV TRAYS LOCATED WITHIN THE PANELS, PLATE OF THE TRAY ON THE INNER SKIN.
PLEASE NOTE: ALL DIMENSIONS ARE BASED ON PRODUCTION AND INSTALLATION DRAWINGS. INACCURACIES MAY OCCUR DURING INSTALLATION, PLEASE CHECK GENERAL TOLERANCES IN THE TITLE BLOCK.
INNER
OUTER
3MM TRAY
INNER
OUTER
TYPICAL WALL & ROOF PANEL
image10.emf
TNOX 6000
W1690-0039-B
W
-0
9-
A
W1690-0042-A
Fr id ge
Industrial Freezer
12345678
9 10 11 12 13 14 15 16 17
89101112
21 22 23 24
Water Fountain
Water Fountain
Fi rs t A id
Ki t
Defib
First Aid KitFirst Aid
Kit
WASH RACK
1690-0024 485 m2
BREAK ROOM
1690-0004 31 m
MAIN PAINT BOOTH
1690-0025 622 m2
PLENUM
1690-0025A 43 m2
PLENUM
1690-0025B 62 m2
MALE WC
1690-0020 10 m2
MALE CLN LKR
1690-00199 m2
MALE DTY LKR
1690-0018
17 m2
AIR SHWR
1690-0017 8 m2
FEMALE DTY LKR
1690-0013 14 m2
FEMALE CLN LKR
1690-00127 m2
FEMALE WC
1690-0011 11 m2
COMMS
1690-0005 12 m2
WASH
1690-0010 5 m2
SUPPLY
1690-0007
C
IR
U
LA
TI
O N
5a m
EXT ESCAPE STAIR
1690-0041 24 m2
JAN
1690-0006 4 m2
CIRCULATION
1690-0022
LOBBY
1690-0016 9 m2
ACC WC
1690-0009 4 m2
RESP CLN
1690-0014
OFFICE
1690-0039 8 m 2
CTK
1690-0023 9 m2
ELECT
PLANT
1690-0008 3 m2
ELECT PLANT
1690-0037 25 m2
PAINT BOOTH 1
1690-0033 54 m2
PAINT BOOTH 2
1690-0034 54 m2
STENCIL ROOM
1690-0003 18 m2
PAINT MIX
1690-0026 10 m2
EQUIP CLEAN
1690-0027 12 m2
BACK SHOP
1690-0028 123 m
COMP ROOM
1690-0031 14 m2
OFFICE
1690-0002 21 m2CAB BLASTERS
1690-0032 49 m2
CTK
1690-0029 39 m2
CHEM STORE
1690-0030 13 m2
RISER
1690-0034A 2 m2
FR CONV
1690-0038
STAIR
1690-0021 11 m2
HEAT PLANT SPACE
1690-0036 56 m2
SPRINKLER ROOM
1690-0040 43 m2
RISER
1690-0033A 2 m2
ACCESS AND ESCAPE ZONE
1690-0035 124 m2
WASH RACK PLANT
1690-0043 59 m2
ENTRANCE LOBBY
1690-0001 15 m2
VLFD
MOTOR
1690-0044 3 m2
VLFD
MOTOR
1690-0045 1 m2
IR
LA
TI
O N
5b
1:
0.
9° / 1
.5
FE
1:
0.
9° / 1
.5
1:64 / 0.9°/ 1.5%1:64 / 0.9°/ 1.5%
Eye wash & shower
Ey e w as h sh ow er
MAIN
ENTRANCE
NOTE: DOORS ARE TO OPEN
FULL WIDTH FOR
CLEARANCE
D1690-0025B-D
D1690-0024-D
BOILER PUMP HOUSE
1690-0042 204 m2
Heavy duty table curing oven
H eavy duty table ith w heels.
M etal C age-lockable.
Metal Cage-lockable.
WORK COUNTER
MCC MCD
Paint workbench with extract
Filterbench D ndraft table ork table asher/ solvent recycler
Vinyl Rack
Table with cutting mat
2,440 raw er C hest
750x1400m
Table 1500x950m
3100x950m ry hi ng ni t ith S/S top & rubber w
A2484
MCC
Bench Be nc
MCA
A2496
900mm
MCBMCA
MFD
KEY:
Breathing air drop (Swivel wall mounted bracket)
Compressed air drop (Swivel wall mounted bracket)
At height air drop (Fixed bracket)
AutoCAD SHX Text
PUMP
PIPE HEADER AREA
CONTROL
DRAINAGE CHANNEL
Delivered to B1355 secure area
BA
CA
Sheets and Views
Model image11.emf
File details come from the government source that posted it. Updated .