Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_1_-_Statement_of_Work_(003).pdf | ||
| FA5587-18-Q-0034_Amendment_00004.pdf | ||
| FA5587-18-Q-0034_Amendment_00003.pdf | ||
| FA5587-18-Q-0034_Amendment_00002.pdf | ||
| FA5587-18-Q-0034_Amendment_00001.pdf | ||
| Attachment_1_-_Statement_of_Work.pdf | ||
| FA558718Q0034.pdf | ||
| Attachment_2_-_Quote_Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A
1. On the quote it states new cameras to be installed. Does this require cabling directly back the CCTV recorder or is this done using Wireless point to point devices?
Answer: It will require cabling for VCC, LVIS, and Confinement.
2. This unit (confinement) has a maximum capacity of 32 cameras and within the scope of works there is a requirement to add a further 10 cameras, bringing the total to 35 which is not possible.
Need verification of max number of cameras possible at confinement Answer: Changes updated in SOW
3. Can you confirm that the part number for the Bosch Thermal MIC cameras is MIC-9502-Z30BQS
PTZ thermal QVGA-19mm 2MP 30x 9Hz, black?
Answer: MIC-9502-Z30BVF 30Hz thermal 50mm VGA Bosch camera is the thermal
4. Do you wish to include the upgrade to firmware on the existing VTAS Control systems and include the costs of which in our response?
Answer: No
5. Do you wish to include the upgrade the network programming on existing network switches & firmware and include the costs of which in our response?
Answer: Yes
6. Is it a requirement to access and to program the new cameras onto the existing control and mapping system to allow full functionality and recording as part of this scope of works?
Answer: The new Bosch system should a mapping system to allow full functionality and recording.
7. Is any lighting required? No
8. Is there preexisting fiber in the Gate 1/VCC area? Yes
9. What is the current system that is place at the ECC?
Answer: VTAS control system but control system switching over to a Bosch based system.