Amendment_0002.pdf
PDF 73 KB Posted
- Attached to
- UK-Wide Pest Control Services Federal contract opportunity
- Solicitation number
- FA5587-18-Q-0012
About this file
Change to the required response date to 12 July 2018
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0007.pdf | ||
| Amendment_0006_Revised_Performance_Work_Statement.pdf | ||
| Amendment_0006_Revised_Attachment_2_-_Pricing_Schedule.pdf | ||
| Amendment_0006.pdf | ||
| Amendment_0006_Attachment_3_-_Questionnaire.pdf | ||
| Amendment_00006_Attachment_4_-_List_of_Work_Order_and_Service_Request.pdf | ||
| Amendment_0005.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003_18Q0012.pdf | ||
| FA558718Q0012_Amendment_0001.pdf | ||
| FA558718Q0012_-_Pest_Control_Services.pdf | ||
| Attachment_2_-_Pricing_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_1_-_Performance_Work_Statement_-_Pest_Control.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FA5587-18-Q-0012, UK-WIDE PEST CONTROL SERVICES
Continued on page 2
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA558718Q0012
X 9B. DATED (SEE ITEM 11)
22-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Jun-2018
CODE
48 CONS/LGC - FA5587
BLDG 977, RAF LAKENHEATH
BRANDON IP27 9PN
FA5587 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA558718Q0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
CONTINUATION PAGE
1. The purpose of this amendment is to change the required response date on the SF 1449 Block 8 as follows:
From: The required response date/time 28-Jun-2018 04:30 PM.
To: The required response date/time 12-Jul-2018 04:30 PM.
2. In addition, this amendment also changes Paragraph F, Addendum to 52.212-1 Quote Preparation Instructions as follows:
From: The submittal due date for quotes is 28 June 2018, by 1630 hours British Summer Time (BST).
To: The submittal due date for quotes is 12 July 2018, by 1630 hours British Summer Time (BST).
The modified “Section SF1449 – Continuation Sheet” that include the above revisions is provided below.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 28-Jun-2018 04:30 PM to 12-Jul-2018 04:30 PM.
The following have been modified:
ADDENDUM TO 52.212-1
QUOTE PREPARATION INSTRUCTIONS
Addendum to 52.212-1 – Quote Preparation Instructions
A. To assure timely and equitable evaluation of the quotes, offerors must follow the instructions contained herein.
Offerors are required to meet all solicitation requirements, including:
1. Terms and conditions
2. Representations and certifications
3. Technical requirements
4. Current UK business registrations, licenses, and/or insurance required to legally operate and employ personnel within the UK or show rationale for non-applicability.
Failure to meet a requirement may result in an offer being ineligible for award.
The Government’s terms, conditions, and respective clauses contained within this solicitation are prescribed in accordance with United States Federal Acquisition Regulations (FAR), and are not subject to conditionally proposed revisions or changes requested by offerors. Offerors’ specific terms and conditions that may be contingently proposed for subsequent inclusion into the contract, if awarded, will not be considered by the
Government in its evaluation of quotes. Offerors that are not able to comply with the aforementioned conditions, will be determined as noncompliant with the solicitation requirements, and therefore may be removed from consideration for award.
B. The quote shall consist of two (2) separate parts;
Part I - Technical Capability Part II – Price
C. The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer’s opinion, adequate price competition exists no additional price information will be requested. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists; offerors may be required to submit information to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price.
D. Complete the necessary fill-ins and certifications in provisions and in the on-line Representations and Certifications at www.sam.gov. Return the provision FAR 52.212-3, Offeror Representations and Certifications – Commercial Items along with the quote. For other provisions and clauses in the solicitation, the offeror is required to submit the pages that require an offeror fill-in.
Specific Instructions: Complete the necessary fill-ins and certifications in all provisions. The provisions FAR 52.212-3, and 252.225-7032 shall be returned along with the quote.
E. A Site Visit is planned for 12 June 2018 (0900) at RAF Lakenheath, RAF Mildenhall, and RAF Feltwell; 13 June 2018 (0900) at RAF Molesworth, RAF Alconbury, and RAF Croughton; all prospective offerors are highly encouraged to attend and are encouraged to inspect the sites where the services are to be performed. Exact details and information for the site visit will be provided after receipt of the information required in paragraph 2 below. In no event shall failure to inspect the sites constitute grounds for a claim after contract award. All offerors who intend to participate in the site visit shall coordinate base access through the Contracting Office.
1. A maximum of 3 persons per company will be allowed to participate.
2. Contractor shall provide the names, DOB, and Driving License or Passport Number of company representatives attending the site visit not later than 1200 hours BST on 11 June 2018, to: Cris Calimlim at maria.calimlim@us.af.mil, Jaysen Cortez at jaysen.cortez@us.af.mil and Robert Rogers at robert.rogers.58@us.af.mil.
3. All questions regarding the requirement/site visit must be submitted in writing.
4. Questions and answers will be recorded, published, and distributed to all parties.
5. The final date to submit questions pertaining to any aspect of the solicitation is no later than 1100 hours BST 15 June 2018.
F. Quote Submission Instructions:
Submission Method Instructions
Email 1. Submit to maria.calimlim@us.af.mil and jaysen.cortez@us.af.mil
2. 5MB size limit per email.
3. If sending multiple emails, label each email as “1 of X” “2 of X” etc.
so that receipt of all parts can be verified
4. Suggest sending using a read receipt.
5. It is the offeror’s responsibility to ensure the quote is sent to the correct Government email address.
mailto:maria.calimlim@us.af.mil mailto:jaysen.cortez@us.af.mil mailto:robert.rogers.58@us.af.mil mailto:jaysen.cortez@us.af.mil
NOTE: Late quotes will be processed in accordance with FAR 52.212-1(f) ―Late submission, modifications, revisions, and withdrawals of offers.
The submittal due date for quotes is 12 July 2018, by 1630 hours British Summer Time (BST).
G. Further changes to the original clause 52.212-1.
1. Paragraph 52.212-1(c), Period for Acceptance of Offers is tailored as follows: The offeror agrees to hold the prices in its offer firm for 180 calendar days from the date specified for receipt of offers.
2. Paragraphs 52.212-1(d) and 52.212-1(h) and 52.212-1(i) do not apply to this acquisition.
H. Specific Instructions:
PART I – TECHNICAL CAPABILITY QUOTE - Limited to no more than 15 pages, single-sided with font no smaller than 12 pt. and margins no smaller than one inch. Supporting documentation such as license, insurance, or registration documents do not count towards the page limit.
1. Quality Control Plan - Provide a Quality Control Plan that describes approach you will use to successfully perform to the standards detailed in the Performance Work Statement (PWS) and to effectively meet the quality thresholds defined in the Services Summary. Note that if selected for award, your Quality Control Plan will be incorporated into the contract and will be monitored for compliance with the Service Summary as a performance objective item. Your plan shall include as a minimum, but is not limited to:
a) A thorough and clear description in detail of the methods, processes, and procedures for ensuring performance meets the standards of the PWS;
b) A description of the offeror’s inspection system to effectively meet the quality thresholds defined in the PWS in paragraph 2.0 of the PWS. Description shall include specifics as to the areas to be inspected on both a scheduled and unscheduled basis, frequency of inspections, how inspections will be documented, how feedback will be provided to employees, and the title and organizational placement of the inspectors.
This should include processes for interfacing with the assigned Contracting Officer’s Representatives (CORs);
c) If any services are sub-contracted or a teaming arrangement is proposed, an explanation of how the offeror intends to coordinate performance to meet the standards of the PWS.
2. Licenses/Insurance/Registration - Submission of all licenses, insurance documentation, and registrations required by UK Law.
3. Past Experience - Offeror must submit a minimum of two (2) years of verifiable, recent, and relevant past experience. If past experience contains multiple locations, include all locations during that time period.
Relevant is defined as contracts for pest control services of similar size and complexity to the Performance Work Statement. Recent is defined as experience acquired in the last four (4) calendar years from date of solicitation closing date. Offeror must provide contact name, telephone number, and email address for any experience submitted.
PART II – PRICE
1. Complete blocks 12, 17a, and 30a, b, and c of the SF 1449. In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation, with attachments. The solicitation constitutes the model contract.
2. Firm Fixed Priced Quotes: As prescribed by clause 52.216-1 TYPE OF CONTRACT, the resultant contract will be a Firm Fixed Priced Requirements contract. Accordingly, proposed pricing by offerors shall be firm-fixed, and not subject to revision and/or negotiation if selected for contract award. Additionally, multiple awards will not be considered, quotes shall include pricing for all items in the Price Schedule. Ensure that unit prices are no more than two (2) decimal places of a British Pound Sterling (£).
3. Proposed pricing must be submitted in British Pound Sterling (£), exclusive of VAT.
INFORMATIONAL PRICING NOTE:
TUPE - (Transfer of Undertakings (Protection of Employment) Regulations 2006
Definition. The United Kingdom’s Transfer of Undertakings (Protection of Employment) Regulations 2006 (TUPE) is the main piece of legislation governing the transfer of an undertaking, or part of one, to another. The regulations are designed to protect the rights of employees in a transfer situation.
During the solicitation phase and award of the resultant contract the Government does not have access to specific TUPE information nor becomes involved with related TUPE processes and associated liabilities (to include indemnification) that may transpire during pre-award or post-award phases between transferor and transferee.
While the Government fully understands the relevance of TUPE-information in proposing fixed prices, the responsibility to provide TUPE-information rests solely with the transferor; governed by Regulation 11 of the Transfer of Undertakings (Protection of Employees) Regulations 2006 (TUPE). As the transferor need only provide TUPE information to the transferee prior to the transfer, the Government will only make available the listing of the current, incumbent contractor(s) with associated points of contact if requested. The Government is not responsible for determination of TUPE applicability; the responsibility lies solely with the transferor.
As this is a firm-fixed price requirements contract it is incumbent upon the offeror to calculate any anticipated TUPE pricing at time of quote submittal. TUPE costs cannot be submitted as a conditional quote, if submitted as such the offeror’s quote will be considered unacceptable and the offeror may be excluded from competition.
End of Addendum
(End of Summary of Changes)
File details come from the government source that posted it.