FA5587-14-R-0002.doc

DOC document 623 KB Posted

Attached to
DPM Schedule I, II & III Federal contract opportunity
Solicitation number
FA5587-14-R-0002
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section SF 1449 - CONTINUATION SHEET

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT

Phase-in / Phase-out Period

FFP

Period of Performance of 01 Dec 2014 - 30 Dec 2014. Note: This CLIN is not separately priced. Phase-In: During the 30 day phase in period, the contractor shall make all necessary preparations to begin performance on the contract performance start date in order to ensure no interruption of services.

Phase-Out: In the event the contract options are not exercised or at the end of the contract options, the incumbent contractor is not successful in the re-competition, the contractor shall assist and coordinate with the incoming contractor on all matters/issues in regards to this contract.

FOB: Destination

SIGNAL CODE: A

ESTIMATED

NET AMT

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
1
Lot

DPM Schedule I & II Base Year FY15

Pricing of this line item shall be calculated by each offeror in accordance with the respective Period of Performance found in the below Pricing Schedule; 1-Jan-15 to 30-Sep-15 (9 Months = 1 Lot). This requirement is for Schedule I (Outbound) and Schedule II (Inbound) packing, containerization, and local drayage. The contractor shall provide all management, tools, materials, supervision, supplies, equipment, and labor necessary for the preparation, shipment, storage, and related services of personal property for U.S. Department of Defense (DoD) personnel at RAF Alconbury, St. Mawgan, Croughton, Fairford, Feltwell, Lakenheath, and Mildenhall. To include all United Kingdom counties, in accordance with the attached Performance Work Statement (PWS).

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
1
Lot

DPM Schedule I & II Ordering Period FY16

Pricing of this line item shall be calculated by each offeror in accordance with the respective Period of Performance found in the below Pricing Schedule; 1-Oct-15 to 30-Sep-16 (12 Months = 1 Lot). This requirement is for Schedule I (Outbound) and Schedule II (Inbound) packing, containerization, and local drayage. The contractor shall provide all management, tools, materials, supervision, supplies, equipment, and labor necessary for the preparation, shipment, storage, and related services of personal property for U.S. Department of Defense (DoD) personnel at RAF Alconbury, St. Mawgan, Croughton, Fairford, Feltwell, Lakenheath, and Mildenhall. To include all United Kingdom counties, in accordance with the attached Performance Work Statement (PWS).

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
1
Lot

DPM Schedule III Ordering Period FY16

Pricing of this line item shall be calculated by each offeror in accordance with the respective Period of Performance found in the below Pricing Schedule; 1-Oct-15 to 30-Sep-16 (12 Months = 1 Lot). This requirement is for Schedule III (local moves) packing, containerization, and local drayage. The contractor shall provide all management, tools, materials, supervision, supplies, equipment, and labor necessary for the preparation, shipment, storage, and related services of personal property for U.S. Department of Defense (DoD) personnel at RAF Alconbury, St. Mawgan, Croughton, Fairford, Feltwell, Lakenheath, and Mildenhall. To include all United Kingdom counties, in accordance with the attached Performance Work Statement (PWS).

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
1
Lot

DPM Schedule I & II Ordering Period FY17

Pricing of this line item shall be calculated by each offeror in accordance with the respective Period of Performance found in the below Pricing Schedule; 1-Oct-16 to 30-Sep-17 (12 Months = 1 Lot). This requirement is for Schedule I (Outbound) and Schedule II (Inbound) packing, containerization, and local drayage. The contractor shall provide all management, tools, materials, supervision, supplies, equipment, and labor necessary for the preparation, shipment, storage, and related services of personal property for U.S. Department of Defense (DoD) personnel at RAF Alconbury, St. Mawgan, Croughton, Fairford, Feltwell, Lakenheath, and Mildenhall. To include all United Kingdom counties, in accordance with the attached Performance Work Statement (PWS).

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
1
Lot

DPM Schedule III Ordering Period FY17

Pricing of this line item shall be calculated by each offeror in accordance with the respective Period of Performance found in the below Pricing Schedule; 1-Oct-16 to 30-Sep-17 (12 Months = 1 Lot). This requirement is for Schedule III (local moves) packing, containerization, and local drayage. The contractor shall provide all management, tools, materials, supervision, supplies, equipment, and labor necessary for the preparation, shipment, storage, and related services of personal property for U.S. Department of Defense (DoD) personnel at RAF Alconbury, St. Mawgan, Croughton, Fairford, Feltwell, Lakenheath, and Mildenhall. To include all United Kingdom counties, in accordance with the attached Performance Work Statement (PWS).

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
1
Lot

DPM Schedule I & II Ordering Period FY18

Pricing of this line item shall be calculated by each offeror in accordance with the respective Period of Performance found in the below Pricing Schedule; 1-Oct-17 to 30-Sep-18 (12 Months = 1 Lot). This requirement is for Schedule I (Outbound) and Schedule II (Inbound) packing, containerization, and local drayage. The contractor shall provide all management, tools, materials, supervision, supplies, equipment, and labor necessary for the preparation, shipment, storage, and related services of personal property for U.S. Department of Defense (DoD) personnel at RAF Alconbury, St. Mawgan, Croughton, Fairford, Feltwell, Lakenheath, and Mildenhall. To include all United Kingdom counties, in accordance with the attached Performance Work Statement (PWS).

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
1
Lot

DPM Schedule III Ordering Period FY18

Pricing of this line item shall be calculated by each offeror in accordance with the respective Period of Performance found in the below Pricing Schedule; 1-Oct-17 to 30-Sep-18 (12 Months = 1 Lot). This requirement is for Schedule III (local moves) packing, containerization, and local drayage. The contractor shall provide all management, tools, materials, supervision, supplies, equipment, and labor necessary for the preparation, shipment, storage, and related services of personal property for U.S. Department of Defense (DoD) personnel at RAF Alconbury, St. Mawgan, Croughton, Fairford, Feltwell, Lakenheath, and Mildenhall. To include all United Kingdom counties, in accordance with the attached Performance Work Statement (PWS).

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
1
Lot

DPM Schedule I & II Ordering Period FY19

Pricing of this line item shall be calculated by each offeror in accordance with the respective Period of Performance found in the below Pricing Schedule; 1-Oct-18 to 30-Sep-19 (12 Months = 1 Lot). This requirement is for Schedule I (Outbound) and Schedule II (Inbound) packing, containerization, and local drayage. The contractor shall provide all management, tools, materials, supervision, supplies, equipment, and labor necessary for the preparation, shipment, storage, and related services of personal property for U.S. Department of Defense (DoD) personnel at RAF Alconbury, St. Mawgan, Croughton, Fairford, Feltwell, Lakenheath, and Mildenhall. To include all United Kingdom counties, in accordance with the attached Performance Work Statement (PWS).

ESTIMATED

ITEM NO
SUPPLIES/SERVICES
ESTIMATED QUANTITY
UNIT
UNIT PRICE
ESTIMATED AMOUNT
1
Lot

DPM Schedule III Ordering Period FY19

Pricing of this line item shall be calculated by each offeror in accordance with the respective Period of Performance found in the below Pricing Schedule; 1-Oct-18 to 30-Sep-19 (12 Months = 1 Lot). This requirement is for Schedule III (local moves) packing, containerization, and local drayage. The contractor shall provide all management, tools, materials, supervision, supplies, equipment, and labor necessary for the preparation, shipment, storage, and related services of personal property for U.S. Department of Defense (DoD) personnel at RAF Alconbury, St. Mawgan, Croughton, Fairford, Feltwell, Lakenheath, and Mildenhall. To include all United Kingdom counties, in accordance with the attached Performance Work Statement (PWS).

ESTIMATED

PRICE SCHEDULE

PRICING SCHEDULE

ESTIMATED QUANTITIES

The quantities shown by area of performance for each item in this Solicitation are the Government's estimates of requirements, which may be ordered during the period of the contract.

The Government's estimated maximum daily requirements, excluding Saturday, Sunday; U.S. & U.K. holidays are listed below by area of performance within each schedule. Offerers must complete the “ Offerers Guaranteed Daily Capability”, which must equal the Government’s minimum acceptable daily capability, for all items within an area of performance for which they submit offers.

Area: The following bases shall fall under this contract. RAF Alconbury, St. Mawgan, Croughton, Fairford, Feltwell, Lakenheath, and Mildenhall. To include all UK counties.

Government's

Government's Minimum Offeror's

Est Maximum Acceptable Guaranteed

Daily

Requirement

Capability Capability

OUTBOUND

*NCWT 500

*NCWT 250 *NCWT 250

(Schedule I)

INBOUND

*NCWT 150

*NCWT 115 *NCWT 115

(Schedule II)

INTRA-CITY

*NCWT 22,000 *NCWT 250 *NCWT 250

(Schedule III)

NOTE: 550 NCWT 55,000 pounds is the maximum daily requirement in this contract; however, calls could be placed, not-to-exceed this amount, but could jump from a few moves with large weights to the next day with several smaller moves and less weight each, as shown in the following example:

Day 1 – 3 families at 150 NCWT pounds each. Day 2 – 5 families at 100 NCWT pounds each.

*NCWT – Net Hundredweight

PRICING SCHEDULE

SCHEDULE I

OUTBOUND SERVICES

Ordering Period 1: 1 January 2015 through 30 September 2015 (FY15 – 9 Months)

Item 0001. Complete Service - Outbound (HHGs). Services must include premove survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container Commercial Spec ASTM-D4169-01, SDDC Pamphlet 55-12) at member’s/employee’s residence, or at contractor’s facility when ordered by the contracting officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading of shipments on linehaul carrier’s equipment at the contractor’s facility. When containers will not accommodate all articles of any one lot, loose articles must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize, and other shipments must be paid for under Item 0003.

Area: Reference Pricing Schedule/Estimated Quantities Page 1

Est

Annual

Unit

Qty

Price Total

AA. At member/employee residence:

Container, Commercial Spec (ASTM-D4169-01 or SDDC Pam. 55-12)

(1) Drayage Included

12,000

NCWT

(2) Drayage Not Included

NONE

NCWT

AB. At Contractor’s Facility:

NO REQUIREMENT

Container, Commercial Spec (ASTM-D4169-01 or SDDC Pam. 55-12)

Item 0002. Outbound (HHGs From Nontemporary Storage). NO REQUIREMENT

Item 0003. Complete Service-Outbound (HHG-Overflow Articles and HHG Shipments requiring other than ASTM-D4169-01 or SDDC Pamphlet 55-12). Service must be the same as Item 0001 or Item 0002 except that the loose articles are drayed to contractor’s facility when ordered by the contracting officer for containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments, and oversize containers must be constructed IAW ASTM-D6251. Each container must be caulked during assembly. Overflow boxes and other shipments must be limited to one per shipment. Other shipments are small HHG shipments that normally require a lesser size box than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12. Overflow containers are of a lesser size than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12 and oversized containers are always of a greater size than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12. One or more of these containers may be required per shipment. Price bid for Item 0003 includes container plus weight of its contents.

Price

Total

AA. Government-Furnished

Containers:

(1) Overseas Pack:

a. Overflow Articles

1,200 NCWT £

b. Oversize Articles

180 NCWT £

c. Other Shipments

NONE NCWT

(2) Domestic Pack:

NO REQUIREMENT

AB. Contractor-Furnished

1,000 NCWT £

300 NCWT £

(2) Domestic Pack:

NO REQUIREMENT

Item 0004. Complete Service - Outbound (Unaccompanied Baggage). Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking and loading shipments on the linehaul carrier’s equipment. Service shall be performed at member's/employee’s residence. (Service may be performed at Contractor's facility when ordered by the Ordering Officer.).

Price Total

AA. Government-Furnished

Containers

(1) Drayage Included

130 NCWT £

(2) Drayage Not Included

NONE NCWT

AB. Contractor-Furnished

Containers:

(1) Drayage Included

4,500 NCWT £

(2) Drayage Not Included NONE NCWT

Item 0005. Complete Service - Outbound (Unaccompanied Baggage from Nontemporary Storage).

Item 0006. Outbound Service - Unaccompanied Baggage Packed by the Member/Employee.

Item 0007. Outbound Service - Unaccompanied Baggage Packed By Member/Employee-Consolidated Shipments/Government Facility –

Item 0008. Expensive and Valuable Items. Service must include inventorying each item, packing in Government-approved, contractor-furnished container(s), marking, banding, and cubing at member’s/employee’s residence. Drayage will be ordered by the contracting officer. If drayage is required, weighing must be done on properly certified scales and a certified weight ticket must be furnished. If drayage is not required, weighing must be done at member’s/employee’s residence on portable or bathroom scales. In jurisdictions where local law prohibits the certification of portable scales, a weight certificate will not be required. However, upon the written authority of the contracting officer, the contractor may apply a constructive weight of 11 pounds per gross cubic foot of the container.

Unit Price

Total

AA. Drayage Included

200 NCWT

AB. Drayage Not Included

NONE NCWT

Item 0009. Storage. Storage of containerized articles must be furnished when ordered by the contracting officer. Charges must not commence earlier than the sixth workday following date of transportation officer’s receipt of notification of completion of containerization service. Storage charges apply for each 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.

Qty Unit Price

1,400 NCWT £

Item 0010. Containers. Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading. When a specific container from the SDDC Pamphlet 55-12 is ordered, the order will indicate the SDDC approval number.

AA. Container (ASTM-D4169-01) 650 ea £ £

AB.

Container (SDDC Pam 55-12) 120 ea £ £

AC.

Crate (ASTM-D6039/D6039M-02) 220 cu ft or fraction £ £ thereof

Item 0011. Remarking, Coopering and Assembly/Disassembly Service.

AA. Remarking of Shipments for Reconsignment. Service shall consist of obliteration of all old markings, stenciling of necessary information on loaded shipping's containers scheduled for reconsignment and loading on the hauling carrier's vehicle.

100 ea piece £

AB. Coopering. Service shall consist of repair of containers not to exceed 30 percent of total area of shipping containers or cost of repairs will not exceed 50 percent of the container replacement cost. Minor repair, such as replacement of bolts, nails and bands shall be accomplished at no expense to the Government.

Approval

230 ea piece £

AC. Assembly/Disassembly of Government-Owned Containers.

NO REQUIREMENT

Item 0012. Drayage Beyond the Contract Area of Performance. Service shall consist of drayage of packed shipments beyond the contract area of performance, not to exceed 100 miles. Mileage shall be computed on the shortest highway distance commencing with the applicable point of pickup to the outer boundary of the contract area of performance.

AA. Household goods per loaded mile £

AB. Unaccompanied baggage 100 per loaded

Item 0013. Attempted pickup. When the initial attempt to pickup a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the Contractor notified the contracting officer via telephone and provided that after contractor’s notification, the contracting officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted pickup at the residence.

AA. Household Goods

30 ea shpmt

AB. Unaccompanied Baggage

NOTE: All above items are included in the evaluation of offers

Item 0014. Additional Services ( Outbound ).

Additional Services shown under items below are in addition to the services included in the Schedule I Outbound Services, Items 0001 thru 0013. These services shall be performed by the contractor, when authorized by the Contracting Officer, at the following prices: ( Ref Section I, Contract Clause 252.247-7020 entitled ‘‘ Additional Services’’ ).

AA. When contractor is ordered by the Contracting Officer or his designated representative to perform the task of an ‘‘ Extra Pick-up ’’ at destination and providing that ‘‘ Extra Pick-up ’’ is within the Contract Area of Performance the contractor will be reimbursed as follows:

(1) Household Goods: 150 £ per each additional pick-up. £ (2) Unaccompanied Baggage: 100 £ per each additional pick-up. £ AB. When unaccompanied baggage contains firearms which creates delays with Customs and Excise, the following charges may be made:

Extra Cost per shipment:

AC. When ordered by the Contracting Officer or his designated representative, the contractor will reposition empty Government owned containers to outbound contractor facilities located outside the Contract Area of Performance. The contractor will be reimbursed the following rate (payment for one-way only): £3.50 per mile irrespective of weight.

AD. Container Assembly Charge. Whenever the government provides the contractor with unassembled Government owned containers the contractor must assemble before using, the contractor will be reimbursed as follows:

___N/A____ per each container assembled.

NOTE: This price does not apply to the assemble of contractor furnished containers as the price stated in the schedule is inclusive of assembly.

RECAPITULATION SCHEDULE I

Schedule Total-Area for Period 1:

SCHEDULE II

INBOUND SERVICES

Ordering Period 1: 1 January 2015 through 30 September 2015 (FY15 – 9 Months)

Item 0015. Complete Service - Inbound (HHGs). Service must include drayage from contractor's facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, drayage to member’s/employee’s residence, decontainerization and unpacking of loaded containers of HHG and placing goods in rooms as directed by member/employee, unservicing appliances, assembly of any disassembled articles and removing shipping containers, barrels, boxes/crates, and debris from member’s/employee’s residence and drayage of empty containers to contractor’s or Government facility.

Item 0016. Complete Service - Inbound (HHGs). Service shall be same as Item 0015 above except that drayage of shipment to residence is not required.

Area: Reference Pricing Schedule/Estimated Quantities Page 1

NO REQUIREMENT

Item 0017. Complete Service Inbound (HHGs). Service must be the same as Item 0015 above except removal of items from outer container will be at the contractor’s facility and articles will be drayed to member’s/employee’s residence. NO REQUIREMENT

Item 0018. Inbound Service - Contractor Facility (HHGs).

NO REQUIREMENT

Item 0019. Complete Service - Expensive and Valuable Items.

NO REQUIREMENT

Item 0020. Complete Service - Inbound (Unaccompanied Baggage). Service must include drayage from contractor’s facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, drayage of unaccompanied baggage containers to member’s/employee’s residence, unpacking of containers, reassembly of articles and removal of all shipping containers and debris from the residence.

Item 0021. Complete Service - Inbound (Unaccompanied Baggage). Service shall be same as Item 0020 except that drayage to residence is not required.

25 NCWT £

Item 0022. Inbound Service - Contractor Facility (Unaccompanied Baggage). Service must be the same as Item 0020 except service must also include removal of unaccompanied baggage from outer shipping containers for pickup by the member/employee or release to a motor carrier or other contractor at the contractor’s facility.

Area; Reference Pricing Schedule/Estimated Quantities Page 1

50 NWCT £

Item 0023. Storage. Storage of containerized articles must be furnished when ordered. Charges under this item must not commence earlier than the sixth workday following date of contractor’s notification to the transportation officer of arrival of shipment. Storage charges apply for each 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.

Item 0024. Remarking, Coopering and Assembly/Disassembly Service.

AA. Remarking of Shipments for Reconsignment. Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, obliteration of all old markings, stenciling of necessary information on loaded shipping containers schedule for reconsignment loading on the hauling carrier’s vehicle.

50 ea piece

AB. Coopering. Service must consist of repair of containers not to exceed 30 percent of total area of shipping container or costs of repairs will not exceed 50 percent of the container replacement cost. Minor repair, such as replacement of bolts, renailing and rebanding must be accomplished at no expense to the Government.

10 ea piece £

AC. Assembly/Disassembly of Government-Owned Containers.

Item 0025. Attempted Delivery. When the initial attempt to deliver a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the contractor notified the contracting officer via telephone and provided that after contractor’s notification, the contracting officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted delivery at the residence.

Price

Total

AA. Household Goods 30 ea shpmt

AB. Unaccompanied Baggage 30 ea shpmt

Item 0026. Reweighing. Service shall consist of weighing the loaded containers prior to delivery and weighing the empty containers after delivery.

Price

Total

AA. Household Goods 50 ea shpmt

AB. Unaccompanied Baggage 45 ea shpmt

Item 0027. Drayage Beyond the Contract Area of Performance. Service shall consist of drayage of packed shipments beyond the contract area of performance, not to exceed 100 miles. Mileage must be computed on the shortest highway distance commencing with the point of pickup to the outer boundary of the contract area of performance.

100 mile £

AB. Unaccompanied baggage

Item 0028. Partial Withdrawal. Service must be the same as Items 0015, 0016, 0020, or 0021, except a partial removal of the items from the outer container will be performed at the contractor’s facility. Articles not removed from the shipment will remain at the contractor’s facility.

Area: Reference Pricing Schedule/Estimated Quantities Page 1

AA Est

Household Goods

Price

(1) Drayage included

(2) Drayage not included

NCWT

AB

Unaccompanied Baggage

(2) Drayage not included

NCWT

Item 0029-0030. Reserved (See additional services).

NOTE: All above items are included in the evaluation of offers.

Item 0029. Additional Services ( Inbound ).

Additional Services shown under items below are in addition to the services included in the Schedule II Inbound Services, Items 0015 thru 0028. These services shall be performed by the contractor, when authorized by the Contracting Officer, at the following prices: (Ref Section I, Contract Clause 252.247-7020 entitled ‘‘ Additional Services’’).

Miscellaneous Drayage Charges

AA. When contractor is ordered by the Contracting Officer or his designated representative to perform the task of an ‘‘ Extra delivery ’’ at destination and providing that ‘‘ Extra delivery ’’ is within the Contract Area of Performance the contractor will be reimbursed as follows:

(1) Household Goods: 100 £ per each additional delivery. £

(2) Unaccompanied Baggage: 50 £ per each additional delivery. £

NOTE: Payment under this term will apply when additional delivery is ordered by the Contracting Officer or his designated representative. However, if property owner requests Contractor to deliver a portion of the consignment prior to or after the date set by the Contracting Officer or his designated representative, the property owner will be responsible for payment to the Contractor for any cost involved.

When the contractor is ordered by the Contracting Officer or his designated representative, prior to delivery of a shipment, to reweight a shipment, the lower of the two net scale weights shall be used for determining the applicable charges. The reweight charge stated in the schedule will be payable for the service only when:

(1) Reweight net scale weight is greater that initial scale weight, or

(2) For shipments weighting 5,000 pounds or less: initial net scale weight minus reweight net weight is less than 100 pounds, or

(3) For shipments weighting greater than 5,000 pounds: initial net scale weight minus reweight net scale weight is less than 2% of the lower net scale weight.

NOTE: Reweight provisions are not applicable when constructive weight is used.

AB. Unloading, warehouse handling and reloading of misdirected shipment.

£ per misdirected shipment.

RECAPITULATION SCHEDULE II

Schedule Total-Area for Period 1:

SCHEDULE I

OUTBOUND SERVICES

Ordering Period 2: 1 October 2015 through 30 September 2016 (FY16)

Item 1001. Complete Service - Outbound (HHGs). Services must include premove survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container Commercial Spec ASTM-D4169-01, SDDC Pamphlet 55-12) at member’s/employee’s residence, or at contractor’s facility when ordered by the contracting officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading of shipments on linehaul carrier’s equipment at the contractor’s facility. When containers will not accommodate all articles of any one lot, loose articles must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize, and other shipments must be paid for under Item 1003.

Price Total

AA. At member/employee residence:

Container, Commercial Spec (ASTM-D4169-01 or SDDC Pam. 55-12)

(1) Drayage Included

12,000

NCWT

Container, Commercial Spec (ASTM-D4169-01 or SDDC Pam. 55-12)

Item 1002. Outbound (HHGs From Nontemporary Storage). NO REQUIREMENT

Item 1003. Complete Service-Outbound (HHG-Overflow Articles and HHG Shipments requiring other than ASTM-D4169-01 or SDDC Pamphlet 55-12). Service must be the same as Item 1001 or Item 1002 except that the loose articles are drayed to contractor’s facility when ordered by the contracting officer for containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments, and oversize containers must be constructed IAW ASTM-D6251. Each container must be caulked during assembly. Overflow boxes and other shipments must be limited to one per shipment. Other shipments are small HHG shipments that normally require a lesser size box than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12. Overflow containers are of a lesser size than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12 and oversized containers are always of a greater size than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12. One or more of these containers may be required per shipment. Price bid for Item 1003 includes container plus weight of its contents.

c. Other Shipments

NONE NCWT

(2) Domestic Pack:

NO REQUIREMENT

AB. Contractor-Furnished

(2) Domestic Pack:

NO REQUIREMENT

Item 1004. Complete Service - Outbound (Unaccompanied Baggage). Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking and loading shipments on the linehaul carrier’s equipment. Service shall be performed at member's/employee’s residence. (Service may be performed at Contractor's facility when ordered by the Ordering Officer.).

Price Total

AA. Government-Furnished

Containers

(1) Drayage Included

130 NCWT £

(2) Drayage Not Included

NONE NCWT

AB. Contractor-Furnished

Containers:

(1) Drayage Included

4,500 NCWT £

Item 1005. Complete Service - Outbound (Unaccompanied Baggage from Nontemporary Storage).

Item 1006. Outbound Service - Unaccompanied Baggage Packed by the Member/Employee.

Item 1007. Outbound Service - Unaccompanied Baggage Packed By Member/Employee. –

Item 1008. Expensive and Valuable Items. Service must include inventorying each item, packing in Government-approved, contractor-furnished container(s), marking, banding, and cubing at member’s/employee’s residence. Drayage will be ordered by the contracting officer. If drayage is required, weighing must be done on properly certified scales and a certified weight ticket must be furnished. If drayage is not required, weighing must be done at member’s/employee’s residence on portable or bathroom scales. In jurisdictions where local law prohibits the certification of portable scales, a weight certificate will not be required. However, upon the written authority of the contracting officer, the contractor may apply a constructive weight of 11 pounds per gross cubic foot of the container.

Price Total

AA. Drayage Included

200 NCWT

AB. Drayage Not Included

NONE

NCWT

Item 1009. Storage. Storage of containerized articles must be furnished when ordered by the contracting officer. Charges must not commence earlier than the sixth workday following date of transportation officer’s receipt of notification of completion of containerization service. Storage charges apply for each 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.

1,400 NCWT £

Item 1010. Containers. Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading. When a specific container from the SDDC Pamphlet 55-12 is ordered, the order will indicate the SDDC approval number.

AA. Container (ASTM-D4169-01) 650 ea £ £

AB.

Container (SDDC Pam 55-12) 120 ea £ £

AC.

Item 1011. Remarking, Coopering and Assembly/Disassembly Service.

AA. Remarking of Shipments for Reconsignment. Service shall consist of obliteration of all old markings, stenciling of necessary information on loaded shipping's containers scheduled for reconsignment and loading on the hauling carrier's vehicle.

100 ea piece £

AB. Coopering. Service shall consist of repair of containers not to exceed 30 percent of total area of shipping containers or cost of repairs will not exceed 50 percent of the container replacement cost. Minor repair, such as replacement of bolts, nails and bands shall be accomplished at no expense to the Government.

AC. Assembly/Disassembly of Government-Owned Containers.

NO REQUIREMENT

Item 1012. Drayage Beyond the Contract Area of Performance. Service shall consist of drayage of packed shipments beyond the contract area of performance, not to exceed 100 miles. Mileage shall be computed on the shortest highway distance commencing with the applicable point of pickup to the outer boundary of the contract area of performance.

Item 1013. Attempted pickup. When the initial attempt to pickup a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the Contractor notified the contracting officer via telephone and provided that after contractor’s notification, the contracting officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted pickup at the residence.

Item 1014. Additional Services ( Outbound ).

Additional Services shown under items below are in addition to the services included in the Schedule I Outbound Services, Items 1001 thru 1013. These services shall be performed by the contractor, when authorized by the Contracting Officer, at the following prices: ( Ref Section I, Contract Clause 252.247-7020 entitled ‘‘ Additional Services’’ ).

AA. When contractor is ordered by the Contracting Officer or his designated representative to perform the task of an ‘‘ Extra Pick-up ’’ at destination and providing that ‘‘ Extra Pick-up ’’ is within the Contract Area of Performance the contractor will be reimbursed as follows:

(1) Household Goods: 150 £ per each additional pick-up. £

(2) Unaccompanied Baggage: 100 £ per each additional pick-up. £

AB. When unaccompanied baggage contains firearms which creates delays with Customs and Excise, the following charges may be made:

Extra Cost per shipment:

AC. When ordered by the Contracting Officer or his designated representative, the contractor will reposition empty Government owned containers to outbound contractor facilities located outside the Contract Area of Performance. The contractor will be reimbursed the following rate (payment for one-way only): £ per mile irrespective of weight.

AD. Container Assembly Charge. Whenever the government provides the contractor with unassembled Government owned containers the contractor must assemble before using, the contractor will be reimbursed as follows:

NOTE: This price does not apply to the assemble of contractor furnished containers as the price stated in the schedule is inclusive of assembly.

Schedule Total-Area for Period 2:

INBOUND SERVICES

Ordering Period 2: 1 October 2015 through 30 September 2016 (FY16)

Item 1015. Complete Service - Inbound (HHGs). Service must include drayage from contractor's facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, drayage to member’s/employee’s residence, decontainerization and unpacking of loaded containers of HHG and placing goods in rooms as directed by member/employee, unservicing appliances, assembly of any disassembled articles and removing shipping containers, barrels, boxes/crates, and debris from member’s/employee’s residence and drayage of empty containers to contractor’s or Government facility.

Item 1016. Complete Service - Inbound (HHGs). Service shall be same as Item 1015 above except that drayage of shipment to residence is not required. NO REQUIREMENT

Item 1017. Complete Service Inbound (HHGs). Service shall be the same as Item 1015 above except removal of items from outer container will be at the Contractor's facility and articles will be drayed to owner's residence. NO REQUIREMENT

Item 1018. Inbound Service - Contractor Facility (HHGs).

NO REQUIREMENT

Item 1019. Complete Service - Expensive and Valuable Items.

NO REQUIREMENT

Item 1020. Complete Service - Inbound (Unaccompanied Baggage). Service must include drayage from contractor’s facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, drayage of unaccompanied baggage containers to member’s/employee’s residence, unpacking of containers, reassembly of articles and removal of all shipping containers and debris from the residence.

Item 1021. Complete Service - Inbound (Unaccompanied Baggage). Service shall be same as Item 1020 except that drayage to residence is not required.

Item 1022. Inbound Service - Contractor Facility (Unaccompanied Baggage). Service must be the same as Item 1020 except service must also include removal of unaccompanied baggage from outer shipping containers for pickup by the member/employee or release to a motor carrier or other contractor at the contractor’s facility.

Item 1023. Storage. Storage of containerized articles must be furnished when ordered. Charges under this item must not commence earlier than the sixth workday following date of contractor’s notification to the transportation officer of arrival of shipment. Storage charges apply for each 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.

Item 1024. Remarking, Coopering and Assembly/Disassembly Service.

AA. Remarking of Shipments for Reconsignment. Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, obliteration of all old markings, stenciling of necessary information on loaded shipping containers schedule for reconsignment loading on the hauling carrier’s vehicle.

AB. Coopering. Service must consist of repair of containers not to exceed 30 percent of total area of shipping container or costs of repairs will not exceed 50 percent of the container replacement cost. Minor repair, such as replacement of bolts, renailing and rebanding must be accomplished at no expense to the Government.

Item 1025. Attempted Delivery. When the initial attempt to deliver a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the contractor notified the contracting officer via telephone and provided that after contractor’s notification, the contracting officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted delivery at the residence.

AB. Unaccompanied Baggage 30 ea shpmt

Item 1026. Reweighing. Service shall consist of weighing the loaded containers prior to delivery and weighing the empty containers after delivery.

Price

Total

AA. Household Goods 50 ea shpmt

AB. Unaccompanied Baggage 45 ea shpmt

Item 1027. Drayage Beyond the Contract Area of Performance. Service shall consist of drayage of packed shipments beyond the contract area of performance, not to exceed 100 miles. Mileage must be computed on the shortest highway distance commencing with the point of pickup to the outer boundary of the contract area of performance.

Item 1028. Partial Withdrawal. Service must be the same as Items 1015, 1016, 1020, or 1021, except a partial removal of the items from the outer container will be performed at the contractor’s facility. Articles not removed from the shipment will remain at the contractor’s facility.

Area: Reference Pricing Schedule/Estimated Quantities Page 1

AA Est

Price

(2) Drayage not included

NCWT

(2) Drayage not included

NCWT

NOTE: All above items are included in the evaluation of offers.

Item 1029. Additional Services ( Inbound ).

Additional Services shown under items below are in addition to the services included in the Schedule II Inbound Services, Items 1015 thru 1028. These services shall be performed by the contractor, when authorized by the Contracting Officer, at the following prices: (Ref Section I, Contract Clause 252.247-7020 entitled ‘‘ Additional Services’’).

Miscellaneous Drayage Charges

AA. When contractor is ordered by the Contracting Officer or his designated representative to perform the task of an ‘‘ Extra delivery ’’ at destination and providing that ‘‘ Extra delivery ’’ is within the Contract Area of Performance the contractor will be reimbursed as follows:

(1) Household Goods: 100 £ per each additional delivery. £ (2)

NOTE: Payment under this term will apply when additional delivery is ordered by the Contracting Officer or his designated representative. However, if property owner requests Contractor to deliver a portion of the consignment prior to or after the date set by the Contracting Officer or his designated representative, the property owner will be responsible for payment to the Contractor for any cost involved.

When the contractor is ordered by the Contracting Officer or his designated representative, prior to delivery of a shipment, to reweight a shipment, the lower of the two net scale weights shall be used for determining the applicable charges. The reweight charge stated in the schedule will be payable for the service only when:

For shipments weighting 5,000 pounds or less: initial net scale weight minus reweight net weight is less than 100 pounds, or

For shipments weighting greater than 5,000 pounds: initial net scale weight minus reweight net scale weight is less than 2% of the lower net scale weight.

Schedule Total-Area for Period 2:

SCHEDULE III

INTRA-CITY AND INTRA-AREA MOVES

Ordering Period 2: 1 October 2015 through 30 September 2016 (FY16)

Item 1031. Complete Service for Intra-City and Intra-Area Moves. Service must include a premove survey, servicing of appliances, packaging and packing at member’s/employee’s residence to protect HHG properly during transit, tagging of items, inventorying, loading, weighing, drayage, unloading, unpacking, and placing of each article in member’s/employee’s new residence as directed by member/employee or member’s/employee’s designated representative and removal of all empty containers and materials from residence.

22,000 NCWT £

Item 1032. Attempted Pickup or Delivery. When the initial attempt to pickup or deliver a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the contractor notified the contracting officer via telephone and provided that after contractor’s notification, the contracting officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted pickup or delivery at the residence.

AA. Attempted Pickup

20 ea shpmt

AB. Attempted Delivery

Item 1033. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed miles. Mileage must be computed on the shortest highway distance commencing with the point of departure from the outer boundary of the contract area of performance to the destination point.

35 mile £

Item 1034. Storage and handling of articles shall be furnished when ordered by the Contracting Officer or authorized representative. The date of release from storage shall not be considered in computation of storage charges. Storage charges apply for each 30-day period or fraction therof and include all associated charges for movement into and out of storage.

275 NCWT

RECAPITULATION SCHEDULE III

Schedule Total- Area for Period 2:

OUTBOUND SERVICES

Ordering Period 3: 1 October 2016 through 30 September 2017 (FY17)

Item 2001. Complete Service - Outbound (HHGs). Services must include premove survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container Commercial Spec ASTM-D4169-01, SDDC Pamphlet 55-12) at member’s/employee’s residence, or at contractor’s facility when ordered by the contracting officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading of shipments on linehaul carrier’s equipment at the contractor’s facility. When containers will not accommodate all articles of any one lot, loose articles must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize, and other shipments must be paid for under Item 2003.

Price Total

AA. At member/employee residence:

Container, Commercial Spec (ASTM-D4169-01 or SDDC Pam. 55-12)

(1) Drayage Included

12,000

NCWT

Container, Commercial Spec (ASTM-D4169-01 or SDDC Pam. 55-12)

Item 2002. Outbound (HHGs From Nontemporary Storage). NO REQUIREMENT

Item 2003. Complete Service-Outbound (HHG-Overflow Articles and HHG Shipments requiring other than ASTM-D4169-01 or SDDC Pamphlet 55-12). Service must be the same as Item 2001 or Item 2002 except that the loose articles are drayed to contractor’s facility when ordered by the contracting officer for containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments, and oversize containers must be constructed IAW ASTM-D6251. Each container must be caulked during assembly. Overflow boxes and other shipments must be limited to one per shipment. Other shipments are small HHG shipments that normally require a lesser size box than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12. Overflow containers are of a lesser size than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12 and oversized containers are always of a greater size than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12. One or more of these containers may be required per shipment. Price bid for Item 2003 includes container plus weight of its contents.

c. Other Shipments

NONE NCWT

(2) Domestic Pack:

NO REQUIREMENT

AB. Contractor-Furnished

(2) Domestic Pack:

NO REQUIREMENT

Item 2004. Complete Service - Outbound (Unaccompanied Baggage). Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking and loading shipments on the line-haul carrier’s equipment. Service shall be performed at member's/employee’s residence. (Service may be performed at Contractor's facility when ordered by the Ordering Officer.).

Price Total

AA. Government-Furnished

Containers

(1) Drayage Included

130 NCWT £

(2) Drayage Not Included

NONE NCWT

AB. Contractor-Furnished

Containers:

(1) Drayage Included

4,500 NCWT £

Item 2005. Complete Service - Outbound (Unaccompanied Baggage from Nontemporary Storage).

Item 2006. Outbound Service - Unaccompanied Baggage Packed by the Member/Employee.

Item 2007. Outbound Service - Unaccompanied Baggage Packed By Member/Employee-Consolidated Shipments/Government Facility –

Item 2008. Expensive and Valuable Items. Service must include inventorying each item, packing in Government-approved, contractor-furnished container(s), marking, banding, and cubing at member’s/employee’s residence. Drayage will be ordered by the contracting officer. If drayage is required, weighing must be done on properly certified scales and a certified weight ticket must be furnished. If drayage is not required, weighing must be done at member’s/employee’s residence on portable or bathroom scales. In jurisdictions where local law prohibits the certification of portable scales, a weight certificate will not be required. However, upon the written authority of the contracting officer, the contractor may apply a constructive weight of 11 pounds per gross cubic foot of the container.

Price

Total

AA. Drayage Included

200 NCWT

AB. Drayage Not Included

NONE

NCWT

Item 2009. Storage. Storage of containerized articles must be furnished when ordered by the contracting officer. Charges must not commence earlier than the sixth workday following date of transportation officer’s receipt of notification of completion of containerization service. Storage charges apply for each 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.

1,400 NCWT £

Item 2010. Containers. Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading. When a specific container from the SDDC Pamphlet 55-12 is ordered, the order will indicate the SDDC approval number.

AA. Container (ASTM-D4169-01) 650 ea £ £

AB.

Container (SDDC Pam 55-12) 120 ea £ £

AC.

Item 2011. Remarking, Coopering and Assembly/Disassembly Service.

AA. Remarking of Shipments for Reconsignment. Service shall consist of obliteration of all old markings, stenciling of necessary information on loaded shipping's containers scheduled for reconsignment and loading on the hauling carrier's vehicle.

100 ea piece £

AB. Coopering. Service shall consist of repair of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .