Attachment 4-Questions and Answers.pdf
PDF 321 KB Posted
- Attached to
- MCC RENOVATION Federal contract opportunity
- Solicitation number
- FA557520QBB01
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2-ROT. MCC. RENO -FINAL.pdf | ||
| Combined Synopsis Solicitation.docx | DOCX document | |
| Attachment 3 MCC Reno - Price Schedule.xls | XLS spreadsheet | |
| Attachment 1-PWS. MCC RENO -FINAL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4
MCC Renovation- Q&A
ELECTRICITY AND DATA WORKS.
Q1: The interconnections between PC1 electrical panel, and the new MCC electrical panel (111 room), can they be carried by the roof on trays?
A1: On low ceiling, accordance to REBT.
Q2: The same question about the outputs of the MCC electrical panels with the rest of rooms, can they be carried by the roof on trays?
A2: On low ceiling, accordance to REBT.
Q3: In room 111, the columns from ceiling to floor (marked blue in the drawing) Is it shared between electrical cables and the NIPR communication circuits for the same columns?
A3: Yes, Separated inside.
Q4: And at the workstations in Room 111, do you share raceways under the table electricity and NIPR data?
A4: Yes, Separated inside.
Q5: During the site visit it was indicated that the receptacles existing at the moment, should be removed to the new panel to be installed maintaining its functionality, but, the electrical circuits of those receptacles (NEMA5-20R), do we have to modify them to bring them to the new electrical panel?
A5: No. The existing receptacles doesn`t need to be connected to the new electrical panel.
Q6: The network cables for the video projectors data wiring, where must be finished? To the existing communications cabinet SIPR?.
A6: Must be finished NIPR.
Q7: The safe box in room 110, does it need some connections too (electrical or data connections)?
A7: No.
Q8: What is the height from the floor to the removable ceiling?
A8: Approx.:3mts.
Q9: What is the free height from the roof slab to the removable roof?
A9: Approx.:0.9mts.
Q10: It´s not also necessary to modify door 6 (include panic bar and external key lock too)?
A10: The door 6 must be modified too.
SUPPLY/PLACE OFFICE FURNITURE’S
Q11: 1 work desk (L) + 1 office chair:
- There are no dims of the table and the wing. Is it understood that the (L) refers to the wing? Do you want a specific table color?
A11: -Higth:73cm, Width:180cm, Depth:80cm, Wing: depth 60cm.
-Work Desk: Dark Brown + Chair: Black.
Q12: 12 work desks (1.6x0.8mts) + 12 office chairs:
- Does this have to be same color as in the picture? (Brown)
A12: Work Desk: Dark Brown + Chair: Black.
Q13: 1 work desk (1.2x0.8mts) + 1 office chair:
- ¿In which color do the legs have to be? (white, black, graphite or silver)
- Does this have to be same color as in the picture? (Brown)
A13: -Legs: Silver.
-Work Desk: Dark Brown + Chair: Black.
Q14: 1 conference table (1.6x3.2mts):
- Do you want a specific color for the conference room?
A14: Conference table: Dark Brown.
Q15: 12 chairs:
- Are the chairs for the conference table without wheels as in the picture?
A15: Office chairs without wheels, conference room chairs with wheels.
Q16: 4 whiteboards(3x1mts):
- Near all the White-boards have a metallic frame is that OK?
A16: OK, (see attached picture).
Q17: 2 shelving (1.23x2.4mts):
- Please specify the height and width of the indicated dims
- The depth is not mentioned, can you please provide?
- On the picture the shelving furniture show a kind of small lockers, do they need to be of a minimum dimension?
- How many lockers do you need per shelving?
A17: -Higth:123cm, Width:240cm.
-Depth:40cm.
-Accordance to general dimensions of the shelving, depending of suppliers, the small lockers will have different dimensions (see attached picture).
-12 lockers per shelving, (see attached picture).
Q18: 14 hangers/accessories for work desks:
- ¿Do you need only the hangers for inside the drawers? Can you specify the dims or a picture? Do you also need the drawers, and if yes, with wheels or without? Also in case of yes, do you need them with 1 drawer and under that a big one for the hangers? Can you send a picture?
A18: -Don`t need inside hangers(N/A).
-Don`t need drawers(N/A).
-Hangers/accessories/paper trays. (see attached picture)
Q19: 3 projectors screen (2x2mts)
- ¿Does the Projector screen have to be fixed on the Wall or roll-in screens. If it is roll in, please specify if it has to be electric or manual?
A19: -Roll-in screens -Manual, (see attached picture).
SUPPLY/ PLACE MICROWAVE & REFRIGERATOR
Q20: Please specify minimum inside size of the micro-wave and the Watts it has to have. Also, any particular color? (White/ Black/Metallic)
A20: As reference: Attached Characteristics plate with, Model, Power, etc…., (see attached picture).
Q21: Also please specify the capacity of the refrigerator or minimum dims. What color, Black or metallic?
A21: As reference: Model FRT18DRH /Frost-Proof /Refrigerator-Freezer (see attached picture).
Q22:Does the device have to be adapted to the 60HZ that you normally use?
A22: The micro-wave and refrigerator must be 60 Hz.
CIVIL WORK
Q23: Do we have to apply same skirts as there are now, or do we have to put back the same that have to be taken of?
A23: The new skirts will be installed/placed on new gypsum board(finished).
Q24: When placing the acoustic plates and plasterboard panels on the walls, should the perimeter profiles of the ceiling be modified or will they be hidden by the new wall?
A24: The perimeter profiles will be installed/placed on new gypsum board(finished).
Q16