Attachment 3 MCC Reno - Price Schedule.xls
XLS spreadsheet 48 KB Posted
- Attached to
- MCC RENOVATION Federal contract opportunity
- Solicitation number
- FA557520QBB01
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 4-Questions and Answers.pdf | ||
| Attachment 1-PWS. MCC RENO -FINAL.pdf | ||
| Attachment 2-ROT. MCC. RENO -FINAL.pdf | ||
| Combined Synopsis Solicitation.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor
| ROUGH COST ESTIMATED | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| GOVERNMENT ESTIMATE | MORON AIR BASE, SPAIN | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| MCC RENO.(BLDG.:1411). | € 0.00 | $0.00 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| N/A | WO# 20261 | MORON AIR BASE, SPAIN | ||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| ELECTRICAL WORK. | ||||||||||
| TRABAJO ELECTRICO. | ||||||||||
| 1 | Modify existing electrical installations. | |||||||||
| Modificar instalacion electrica existentes. | JOB | |||||||||
| 2 | Install/connect new receptacles circuits. | |||||||||
| Instalar/conectar circuitos de enchufes nuevos. | JOB | |||||||||
| 3 | Install/connect new control access. | |||||||||
| Instalar/conectar control de acceso nuevo. | JOB | |||||||||
| 4 | Miscellaneous. | |||||||||
| Varios. | JOB | |||||||||
| TOTAL ELECTRICAL WORK. | ||||||||||
| TOTAL TRABAJO ELECTRICO. | ||||||||||
| CIVIL WORK. | ||||||||||
| TRABAJO CIVIL. | ||||||||||
| 1 | Place new door. | |||||||||
| Colocar puerta nueva. | EA | |||||||||
| 2 | Modify/repair existing doors. | |||||||||
| Modificar/reparar puertas existentes. | JOB | |||||||||
| 3 | Place acoustic panels on ceilings. | |||||||||
| Colocar paneles acusticos sobre los techos. | M² | |||||||||
| 4 | Place acoustic panels on walls. | |||||||||
| Colocar paneles acusticos sobre las paredes. | M² | |||||||||
| 5 | Place gypsum board on acoustic panels(finished). | |||||||||
| Colocar paneles de fibra de cemento en paredes( acabado). | M² | |||||||||
| 6 | Paint works areas. | |||||||||
| Pintar areas de trabajos. | JOB | |||||||||
| 7 | Miscellaneous. | |||||||||
| Varios. | JOB | |||||||||
| TOTAL CIVIL WORK. | ||||||||||
| TOTAL TRABAJO CIVIL. | ||||||||||
| COMMUNICATION WORK. | ||||||||||
| TRABAJO DE COMUNICACIONES. | ||||||||||
| 1 | Install/connect new communicationa circuits. | |||||||||
| Instalar/conectar circuitos de comunicaciones nuevos. | JOB | |||||||||
| 2 | Miscellaneous. | |||||||||
| Varios. | JOB | |||||||||
| TOTAL COMMUNICATION WORK. | ||||||||||
| TOTAL TRABAJO DE COMUNICACIONES. | ||||||||||
| FURNITURE. | ||||||||||
| MOBILIARIO. | ||||||||||
| 1 | Supply/place office furnitures. | |||||||||
| Suministrar/colocar mobiliario de oficina. | JOB | |||||||||
| 2 | Supply/place projector screens. | |||||||||
| Suministrar/colocar pantallas de projectores. | EA | |||||||||
| 3 | Supply/instalar sink. | |||||||||
| Suminstrar/instalar fregadero. | EA | |||||||||
| 4 | Supply/install microwave. | |||||||||
| Suministrar/instalar microondas. | EA | |||||||||
| 5 | Supply/install fridge. | |||||||||
| Suminstrar/instalar frigorifico. | EA | |||||||||
| 6 | Miscellaneous. | |||||||||
| Varios. | JOB | |||||||||
| TOTAL FURNITURE. | ||||||||||
| TOTAL MOBILIARIO. | ||||||||||
| TOTAL ELECTRICAL WORK. | ||||||||||
| TOTAL TRABAJO ELECTRICO. | ||||||||||
| TOTAL CIVIL WORK. | ||||||||||
| TOTAL TRABAJO CIVIL. | ||||||||||
| TOTAL COMMUNICATION WORK. | ||||||||||
| TOTAL TRABAJO DE COMUNICACIONES. | ||||||||||
| TOTAL FURNITURE. | ||||||||||
| TOTAL MOBILIARIO. | ||||||||||
| TOTAL WO. | ||||||||||
| TOTAL WO. | ||||||||||
| TOTAL MATERIAL COSTS | ||||||||||
| TOTAL LABOR COSTS | ||||||||||
| TOTAL OTHER DIRECT COSTS | ||||||||||
| TOTAL DIRECT COSTS | ||||||||||
| OVERHEAD | ||||||||||
| SUBTOTAL | ||||||||||
| PROFIT | ||||||||||
| TOTAL PROJECT EUROS | ||||||||||
| TOTAL PROJECT US$ | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| TITLE: | BY: |
&L&"Times New Roman,Regular"AF Form 3052 (Computer Generated)&C&"Times New Roman,Bold"FOR OFFICIAL USE ONLY&R&"Times New Roman,Regular"Page &P of &N
File details come from the government source that posted it. Updated .