Attachment_4_-_Questions_and_Answers.pdf

PDF 186 KB Posted

Attached to
HVAC 302 - Moron AB, Spain Federal contract opportunity
Solicitation number
FA557519QMD02
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Attachment 4 - Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to HVAC 302 - Moron AB, Spain, newest first.
File Type Posted
Attachment_1_-_HVAC_302_Price_Schedule.xls XLS spreadsheet
Attachment_3_-_HVAC_302_ROT.pdf PDF
FA557519QMD02_-_HVAC_302_-_Combo.pdf PDF
Attachment_2_-_HVAC_302_PWS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA557519QMD02

HVAC 302

Attachment 4

Questions and Answers

Q1. We are inquiring about the distance between indoor unit and exterior (38AUQA16/40RUQA16) for the salon and if supports are needed for placement.

A1. Revise mechanical layout drawing include in the PWS. Considerer new supports.

Q2. We are inquiring about the distance between indoor unit and exterior ( 25HNB/FE4ANB)) for the offices and if supports are needed for placement.

A2. Revise mechanical layout drawing include in the PWS. Considerer new supports.

Q3. We are inquiring about the type of insulation for refrigeration and pipe lines sizing A3. In accordance with the recommendations of the units manufacturer.

Q4. We are inquiring about if the refrigeration lines are going to be reused from the existing machines or if new ones need to be installed.

A4. Refrigeration line must be totally new, existing lines shall be replaced.

Q5. We need to know how many m2 of isolated sheet metal exist for the installation of the equipment and the thickness of the sheet metal and insulation.

A5. Square meters required to accomplish the connections of the existing ducts to be used with the new units.

Q6. We are inquiring about if you plan to install some element of diffusion (grilles, diffusers, etc..) and, if so, the characteristics of the same.

A6. No.

Q7. We are inquiring about Plans for demolition installation which must be removed and the new installation drawing.

A7. Replace existing units with new units, that is all.