4._12-1013_Schedule_of_Material_Submittals_AF66.xlsx

XLSX spreadsheet 45 KB Posted

Attached to
Repair Int bldg 319 Federal contract opportunity
Solicitation number
FA5575-19-B-0003
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Attachment 4

View the file

Other files for this federal contract opportunity

Other files attached to Repair Int bldg 319, newest first.
File Type Posted
2._12-1013_SPEC_ENGLISH.pdf PDF
12-1013_Blank_Price_Estimate.pdf.xlsx XLSX spreadsheet
1._12-1013_DRAWINGS.pdf PDF
Solicitation_-_FA557519BA001.pdf PDF
3._12-1013_SPEC_SPANISH.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 12-1013PROJECT TITLE
REPAIRS IN REC CENTER, 319SOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 00ERROR:#NAME?
1Construction ScheduleNTP+15
2Work PlanNTP+15
SECTION 01 11 01
3Progress Schedule1NTP+15
4Mobility Plan1NTP+15
5Project sign1Site fencing+1
6Quality Control Plan1NTP+15
7Waste & construction debris management1Final Inspection
8As-Built drawings1FI+15
9Spatial Data1FI+15
10Key Personnel1NTP+15
11Personel listing1NTP+15
12Safety Program1NTP+15
13Warranty letter1FI+30
SECTION 02 11 01
14Program and schedule of the works1NTP+10
15Demolition plan1NTP+10
16Management & disposal plan of the waste from demolition1NTP+10
17Manager of waste from demolition & construction1NTP+10
18Authorized dump or treatment & recovery plant1NTP+10
19Delivery & disposal of waste1NTP+10
SECTION 03 30 00.00 20
20Concrete batch plant1
21Concrete Control Test Program1
22Results of the Concrete Control Tests1
23Assembly of ironworks1
24Polypropylene fiber1
SECTION 01 20 00.00 10
25Brick and clayblock to be used11
SECTION 07 55 00
26Vapor barrier11NTP+15
27Lightweight concrete111NTP+15
28Protective fleece layer1111NTP+15
29Waterproof membrane11111NTP+15
30Filtering tile1111NTP+15
31Flashing11NTP+15
32Chemical welding compounds111NTP+15
33Mastic111NTP+15
34Sealant for expansion joints111NTP+15
35Gutters and downspouts11NTP+15
36Fall arresting system11NTP+15
SECTION 07 92 00
37Sealants, primers and bond breakers1
SECTION 09 61 29
38Laminate flooring11NTP+15
39Laminate flooring plank1NTP+15
40Polyethiylene-aluminum base padding1NTP+15
41Laminate skirting and clipholder1NTP+15
42Clicking, T molding and transition profiles1NTP+15
SECTION 09 90 00
43Each type of coating and/or product furnished1NTP+15

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 12-1013TÍTULO DE PROYECTO:
REPARACIONES EN EL CENTRO RECREATIVO, 319SOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01 11 00
1Plan de construcciónNTP+15
2Plan de obraNTP+15
SECCIÓN 01 11 01
3Programa de avance de obras1NTP+15
4Plan de movilizaciónNTP+15
5Cartel de proyecto1Vallado+1
6Plan de control de calidad1NTP+15
7Gestión de residuos y escombros1Inspección final
8Planos As-Builts1IF+15
9Datos espaciales1IF+15
10Personal clave1NTP+15
11Listado de personal1NTP+15
12Plan de seguridad1NTP+15
13Carta de garantía1IF+30
SECCIÓN 02 41 01
14Programa y plan de obra1NTP+15
15Plan de demolición1NTP+15
16Plan de gestión y eliminación de residuos procedentes de la demolición1NTP+15
17Gestor de residuos de construcción y demolición1NTP+15
18Vertedero autorizado o planta de tratamiento y valorización de residuos1NTP+15
19Certificados de depósitos1IF+5
SECTION 03 30 00.00 20
20Inspección de la central de fabricación del hormigón1NTP+15
21Programa ensayos control del hormigón1NTP+15
22Resultado de los ensayos de control del hormigón1NTP+15
23Plano de montaje de ferralla1NTP+15
24Fibra de polipropileno1NTP+15
SECCIÓN 04 20 00.00 40
25Ladrillos y bloques a usar11NTP+15
SECCIÓN 07 55 00
26Barrera de vapor11NTP+15
27Hormigón aligerado111NTP+15
28Lámina antipunzante1111NTP+15
29Membrana de impermeabilización11111NTP+15
30Losa filtrante4111NTP+15
31Rematería11NTP+15
32Compuesto para soldadura química111NTP+15
33Mástico114NTP+15
34Sellante para juntas de dilatación111NTP+15
35Canalones y bajantes11NTP+15
36Sistema de protección contra caídas de alturas11NTP+15
SECCIÓN 07 92 00
37Sellantes, imprimación y desencofrantes1NTP+15
SECTION 09 64 29
38Suelo laminado11NTP+15
39lama de suelo laminado1NTP+15
40Base de polietileno con aluminio1NTP+15
41Rodapie de madera laminado y clips montaje1NTP+15
42Perfiles fijación, transición y de junta dilatación1NTP+15
SECCIÓN 09 90 00
43Cada tipo de recubrimiento y/o producto suministradoNTP+15

&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N