12-1013_Blank_Price_Estimate.pdf.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Repair Int bldg 319 Federal contract opportunity
Solicitation number
FA5575-19-B-0003
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Pricing estimate

View the file

Other files for this federal contract opportunity

Other files attached to Repair Int bldg 319, newest first.
File Type Posted
1._12-1013_DRAWINGS.pdf PDF
2._12-1013_SPEC_ENGLISH.pdf PDF
Solicitation_-_FA557519BA001.pdf PDF
4._12-1013_Schedule_of_Material_Submittals_AF66.xlsx XLSX spreadsheet
3._12-1013_SPEC_SPANISH.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KTOR

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPAIRS IN REC CENTER, 319
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 12-1013MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
ARCHITECTURAL WORK
TRABAJOS DE ARQUITECTURA
Demolition Works
Trabajos de demolición
1Unistall light fixures & A/C units & accessor to be reinstalled
Desinstalar luminarias y A/C units y accesor a reinstalarJOB
2Remove heat radiators, pipes valves and associated interior
Eliminar radiadores calor, tubos, válvulas y relativos intJOB
1Remove baseboards
Desmontar rodapiesLM
2Remove carpet and adhesive
Desmontar moqueta y adhesivoSM
3Demolish existing roof with all its elements
Demoler la cubierta existente con todos sus elementosSm
4Separate, load and transport the waste to authorized dump
Separar, cargar y transportar residuos a vertedero autorJOB
Total Demolition Works
Total Trabajos de demolición
Concrete and Masonry Works
Trabajos de hormigón y albañilería
5Construct concrete block for life line anchorage
Construir bloques hormigón para anclaje de linea vidaEa
6Install slope formation with concrete lightweight
Realizar formación de pendiente con horm. aligeradoSm
Total Concrete and Masonry Works
Total Trabajos de Hormigón y albañilería
Roof Work and Waterproofing Operations
Trabajos de cubierta e impermeabilización
7Install metal strips for sealing off of the membranes-wall
Installar remates para sellado de membrana a muroLm
8Install flashing for drip edge on the roof perimeter
Instalar remate de goterón en el perimetro de cubiertaLm
9Install polyester fiber synthetic felt fleece layer
Instalar lamina antipunzonante de poliester sintéticoSM
10Install waterproof membrane and special elements
Instalar lamina impermeabilizante y elemento especial.SM
11Install filtering tiles on entire roof surface
Instalar losas filtrantes en la totalidad de la cubiertaSM
12Reinstall light fixtures and A/C unit to its original location
Instalar luminarias y A/C unidades a ubicación inicialJOB
13Clean downspout and gutter and replace brackets and joints
Limpiar canalones y bajantes y reponer abrazad y juntasJOB
Total Roof Work and Waterproofing Operations
Total trabajos de cubierta e impermeabilización
Safety and Protection Equipments
Equipos de protección y seguridad
14Install anchor plates for llife line
Instalar placas de anchaje para linea de vidaEa
15Install life line cable and accessories
Instalar cable de linea de vida y accesoriosLm
Total Safety and Protection Equipments
Total Equipos de protección y seguridad
Finishes Works
Trabajos de acabados
16Install expanded poliethylene padding
Instalar lamina de polietileno expandidoSM
17Install 8 mm thick laminated wood stave flooring AC5
Instalar suelo madera laminada 8 mm de espesor AC5SM
18Installar 80x15 mm laminated wood baseboard
Instalar rodapié de madera laminada de 80x15 mmLM
18Remove old paint and clean mold stain and replace pargeting
Eliminar pintura antigua y limpiar moho y reponer yesoSM
19Replace suspended ceiling by gypsum board
Sustituir techo suspendido por placa yeso laminadoSM
20Apply fungicide treatment to walls and ceiling
aplicar tratamiento fungicida sobre paredes y techosSM
21Paint interior gypsum and cement surfaces
Pintar superficies interiores de yeso y cementosSM
22Paint interior enamel surfaces
Pintar superficies interiores de esmalteSM
23Apply two barnish coat to wood surfaces
Aplicar dos manos de barniz a superficies de maderaSM
24Move furniture to other building and return after works
Mover muebles a otro edificio y traerlos tras los trabajosJOB
Total finishes works
Total trabajos de acabados
ARCHITECTURAL WORK SUMMARY
RESUMEN TRABAJOS DE ARQUITECTURA
Demolition Works
Trabajos de demolición
Concrete and Masonry Works
Trabajos de Hormigón y Albañilería
Roof Work and Waterproofing Operations
Trabajos de cubierta e impermeabilización
Safety and Protection Equipments
Equipos de protección y Seguridad
Finishes Works
Trabajos de acabados
TOTAL ARCHITECTURAL WORK
TOTAL TRABAJOS DE ARQUITECTURA
SUMMARY
RESUMEN
TOTAL ARCHITECTURAL WORK
TOTAL TRABAJOS DE ARQUITECTURA
GRAND TOTAL
GRAN TOTAL
`
TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD

SUBTOTAL

PROFIT

TOTAL PROJECT EUROS

DATE: FIRM NAME:

&"Times New Roman,Regular"CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"Page &P of &N