12-1013_Blank_Price_Estimate.pdf.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Repair Int bldg 319 Federal contract opportunity
- Solicitation number
- FA5575-19-B-0003
About this file
Pricing estimate
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1._12-1013_DRAWINGS.pdf | ||
| 2._12-1013_SPEC_ENGLISH.pdf | ||
| Solicitation_-_FA557519BA001.pdf | ||
| 4._12-1013_Schedule_of_Material_Submittals_AF66.xlsx | XLSX spreadsheet | |
| 3._12-1013_SPEC_SPANISH.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KTOR
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| REPAIRS IN REC CENTER, 319 | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 12-1013 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| ARCHITECTURAL WORK | ||||||||||
| TRABAJOS DE ARQUITECTURA |
| Demolition Works | ||
| Trabajos de demolición | ||
| 1 | Unistall light fixures & A/C units & accessor to be reinstalled | |
| Desinstalar luminarias y A/C units y accesor a reinstalar | JOB | |
| 2 | Remove heat radiators, pipes valves and associated interior | |
| Eliminar radiadores calor, tubos, válvulas y relativos int | JOB | |
| 1 | Remove baseboards | |
| Desmontar rodapies | LM | |
| 2 | Remove carpet and adhesive | |
| Desmontar moqueta y adhesivo | SM | |
| 3 | Demolish existing roof with all its elements | |
| Demoler la cubierta existente con todos sus elementos | Sm | |
| 4 | Separate, load and transport the waste to authorized dump | |
| Separar, cargar y transportar residuos a vertedero autor | JOB | |
| Total Demolition Works | ||
| Total Trabajos de demolición |
| Concrete and Masonry Works | ||
| Trabajos de hormigón y albañilería | ||
| 5 | Construct concrete block for life line anchorage | |
| Construir bloques hormigón para anclaje de linea vida | Ea | |
| 6 | Install slope formation with concrete lightweight | |
| Realizar formación de pendiente con horm. aligerado | Sm | |
| Total Concrete and Masonry Works | ||
| Total Trabajos de Hormigón y albañilería |
| Roof Work and Waterproofing Operations | ||
| Trabajos de cubierta e impermeabilización | ||
| 7 | Install metal strips for sealing off of the membranes-wall | |
| Installar remates para sellado de membrana a muro | Lm | |
| 8 | Install flashing for drip edge on the roof perimeter | |
| Instalar remate de goterón en el perimetro de cubierta | Lm | |
| 9 | Install polyester fiber synthetic felt fleece layer | |
| Instalar lamina antipunzonante de poliester sintético | SM | |
| 10 | Install waterproof membrane and special elements | |
| Instalar lamina impermeabilizante y elemento especial. | SM | |
| 11 | Install filtering tiles on entire roof surface | |
| Instalar losas filtrantes en la totalidad de la cubierta | SM | |
| 12 | Reinstall light fixtures and A/C unit to its original location | |
| Instalar luminarias y A/C unidades a ubicación inicial | JOB | |
| 13 | Clean downspout and gutter and replace brackets and joints | |
| Limpiar canalones y bajantes y reponer abrazad y juntas | JOB | |
| Total Roof Work and Waterproofing Operations | ||
| Total trabajos de cubierta e impermeabilización |
| Safety and Protection Equipments | ||
| Equipos de protección y seguridad | ||
| 14 | Install anchor plates for llife line | |
| Instalar placas de anchaje para linea de vida | Ea | |
| 15 | Install life line cable and accessories | |
| Instalar cable de linea de vida y accesorios | Lm | |
| Total Safety and Protection Equipments | ||
| Total Equipos de protección y seguridad |
| Finishes Works | ||
| Trabajos de acabados | ||
| 16 | Install expanded poliethylene padding | |
| Instalar lamina de polietileno expandido | SM | |
| 17 | Install 8 mm thick laminated wood stave flooring AC5 | |
| Instalar suelo madera laminada 8 mm de espesor AC5 | SM | |
| 18 | Installar 80x15 mm laminated wood baseboard | |
| Instalar rodapié de madera laminada de 80x15 mm | LM | |
| 18 | Remove old paint and clean mold stain and replace pargeting | |
| Eliminar pintura antigua y limpiar moho y reponer yeso | SM | |
| 19 | Replace suspended ceiling by gypsum board | |
| Sustituir techo suspendido por placa yeso laminado | SM | |
| 20 | Apply fungicide treatment to walls and ceiling | |
| aplicar tratamiento fungicida sobre paredes y techos | SM | |
| 21 | Paint interior gypsum and cement surfaces | |
| Pintar superficies interiores de yeso y cementos | SM | |
| 22 | Paint interior enamel surfaces | |
| Pintar superficies interiores de esmalte | SM | |
| 23 | Apply two barnish coat to wood surfaces | |
| Aplicar dos manos de barniz a superficies de madera | SM | |
| 24 | Move furniture to other building and return after works | |
| Mover muebles a otro edificio y traerlos tras los trabajos | JOB | |
| Total finishes works | ||
| Total trabajos de acabados |
| ARCHITECTURAL WORK SUMMARY |
| RESUMEN TRABAJOS DE ARQUITECTURA |
| Demolition Works |
| Trabajos de demolición |
| Concrete and Masonry Works |
| Trabajos de Hormigón y Albañilería |
| Roof Work and Waterproofing Operations |
| Trabajos de cubierta e impermeabilización |
| Safety and Protection Equipments |
| Equipos de protección y Seguridad |
| Finishes Works |
| Trabajos de acabados |
| TOTAL ARCHITECTURAL WORK |
| TOTAL TRABAJOS DE ARQUITECTURA |
| SUMMARY |
| RESUMEN |
| TOTAL ARCHITECTURAL WORK |
| TOTAL TRABAJOS DE ARQUITECTURA |
| GRAND TOTAL |
| GRAN TOTAL |
| ` | |
| TOTAL MATERIAL COSTS |
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
DATE: FIRM NAME:
&"Times New Roman,Regular"CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"Page &P of &N